Department of ChemistryUpdates on Chemistry Department building construction and maintenance.
CHEMISTRY BUILDING(CHB) - The annual fire alarm test will take place on August 21st. between 7:30 & 8:30am. The audible fire alarm will sound on all floors for approximately 20 minutes. Technicians will inspect the visual strobe lights for proper operation during the audible alarm. The Emergency Electrical Power Test will also be performed at this time. It is recommended that all computers be logged off the network during this period as a precaution. There is NO need to evacuate the building during the test.
BAGLEY HALL - The annual fire alarm test will take place on August 26th. between 7:30 & 8:30am. The audible fire alarm will sound on all floors for approximately 20 minutes. Technicians will inspect the visual strobe lights for proper operation during the audible alarm. The Emergency Electrical Power Test will also be performed at this time. It is recommended that all computers be logged off the network during this period as a precaution. There is NO need to evacuate the building during the test.
Additional details and dates about these events and others can be found by clicking on the event on the calendar. Updated on 5/29.
BAG 1st Floor (pdf 60KB)
BAG 2nd Floor (pdf 59KB)
BAG 3rd Floor (pdf 107KB)
BAG 4th Floor (pdf 141KB)
BAG Ground Fl. (pdf 74KB)
CHB 1st Floor (pdf 58KB)
CHB 2nd Floor (pdf 56KB)
CHB 3rd Floor (pdf 58KB)
CHB 4th Floor (pdf 53KB)
CHB Ground Fl. (pdf 57KB)
CHL 1st Floor (pdf 40KB)
CHL 2nd Floor (pdf 24KB)
CHL Basement Fl. (pdf 35KB)