Revised September 29, 2008
Washington State Transportation Center

TRAC-UW

Freight and Technology

Contents

Background
Northbound In-bound System

Southbound In-bound System
Intermodal Data Project
Electronic Seal Expansion
space• Additional Resources
space• Overview

Overviews

Electronic Seal Expansion Test

Additional Resources

Progress Reports

Advanced Technology Branch, Washington State Department of Transportation. Electronic Container Seals Field Operational Test—Statement of Work. July 2002. (PDF)

• (PDF) Electronic Container Seal Operational Test—a partnership of the USDOT, the Washington State Department of Transportation, US Customs, the US Department of Agriculture (USDA), Ports of Seattle and Tacoma, TransCore and Westwood Shipping.

• (PDF) Electronic Container Seal Operational Test—a partnership of the USDOT, the Washington State Department of Transportation, US Customs, the US Department of Agriculture (USDA), Ports of Seattle and Tacoma, TransCore and Westwood Shipping.

TransCore

Alameda Corridor Test Report. October 2002. (PDF)

Field Operational Test Project: Electronic Container Seal Technology Review (Task 2). September 15, 2003. (PDF)

Field Operational Test Project: Final Site Survey Report. May 2003. (PDF)

Field Operational Test Project: Operational Requirements Concept Paper (Task 3). September 15, 2003. (PDF)

Field Operational Test Project: Interoperability Feasibility Study (Final). April 9, 2004. (PDF)  A study exploring the integration of the highway-oriented CVSIN technology with the border oriented Free and Secure Trade System (FAST).

Northwest International Trade Corridor Program Phase Three. Electronic Container Seals Field Operational Test Project: Task 5.1, Preliminary Operational Test Plan. December 2003. (PDF)

Northwest Trade Corridor Seal Evaluation Final Test Report. August 2001. (PDF)

Requirements Analysis Report (Task 3). September 15, 2003. (PDF)

Site Drawings for Equipment Installation. September 15, 2003. (PDF)

Site Survey Report. (PDF) August 21, 2003.

Technology Review & Operational Requirements Analysis. September 15, 2003.

Trade Corridor Operations System (TCOS) Required Modifications Design Report. September 15, 2003.(PDF)

Trade Corridor Operations System (TCOS). March 2004. (PDF) Spreadsheet showing the location of devices for both these projects and Operation Safe Commerce.