Datetime: 2021-07-17 12:24 From: /gscratch/tsunami/rjl/BoundaryBay/Runs/PtRoberts/hyak_test/_output
============================== Timing Data ==============================
Integration Time (stepgrid + BC + overhead)
Level Wall Time (seconds) CPU Time (seconds) Total Cell Updates
1 3.025 20.723 0.526E+04
2 7.238 65.111 0.503E+07
3 14.706 258.855 0.111E+09
4 46.221 919.160 0.836E+09
5 213.420 4255.834 0.467E+10
total 284.609 5519.683 0.562E+10
All levels:
stepgrid 274.585 5333.908
BC/ghost cells 3.756 53.380
Regridding 17.113 305.138
Output (valout) 0.553 6.634
Total time: 313.413 6053.471
Using 20 thread(s)
Note: The CPU times are summed over all threads.
Total time includes more than the subroutines listed above
Note: timings are also recorded for each output step
in the file timing.csv.
clock_rate = 1000000 per second, count_max = 9223372036854775807
clock_start = 1626549489708497, clock_finish = 1626549812462717
=========================================================================