Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/bronfs/uwfs/hw00/d63/soslab/turbidostat/pmwiki/pmwiki.php on line 666

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/bronfs/uwfs/hw00/d63/soslab/turbidostat/pmwiki/pmwiki.php on line 669
Klavins Lab Turbidostat Wiki | OperatingManual / SetupAssembleClosedSystem | History
Recent Changes - Search:

Information

Operating
Manual

Construction
Manual

Derivative
Designs

Downloads

PmWiki

edit SideBar

SetupAssembleClosedSystem

OperatingManual.SetupAssembleClosedSystem History

Show minor edits - Show changes to markup

Changed line 70 from:
  1. Wrap all culture vessel export ports in aluminum foil
to:
  1. Wrap all culture vessel effluent tube openings in aluminum foil
Changed line 72 from:
  • Double check that all open ends of the tubing system, export ports, and air filters are properly wrapped in aluminum foil
to:
  • Double check that all open ends of the tubing system, effluent ports, and air filters are properly wrapped in aluminum foil
Added line 80:
  1. As soon as the autoclave finishes remove the foil from only the air filters. This will allow them to dry. Only dry filters will pass air.
Changed lines 65-68 from:
  1. Connect a Luer lock end of a 2' tubing section of the octopus tubing system to an inport port on the culture vessel
  2. Connect an air filter to the other inport port on the culture vessel
  3. Repeat for the 7 remaining culture vessels
    • After this step, the culture vessels should only have their export ports open to the environment
to:
  1. For each culture tube
    1. Connect one of the Female Luer ends from the culture tube to one of the male ends on the tubing manifold.
    2. Connect an air filter to the other Female Luer port on the culture vessel
    • After this step, the culture vessels should only have their effluent ports open
Changed lines 52-54 from:
  1. Wash with soap and water
    • Make sure to clean all biofilms off of culture tube walls
  2. Rinse culture tube with ethanol
to:
  1. Wash with soap and water using a tube brush
Changed lines 54-55 from:
  1. Clean magnetic stir bar
    1. Rinse with ethanol
to:
  1. Clean magnetic stir bar with soap and water
Changed line 56 from:
  1. Place stir bar into culture tube with a little bit of DI water
to:
  1. Place stir bar into culture tube with a little bit of DI water (whatever is left from rinsing is okay)
Changed lines 58-61 from:
Plug
  1. Rinse out input ports with ethanol
  2. Rinse out export port with ethanol
  3. Securely place plug into culture tube
to:
Stopper
  1. Rinse out input ports with ethanol from a squeeze bottle
  2. Rinse out export port with ethanol from a squeeze bottle
  3. Securely place Stopper into culture tube
Changed line 44 from:
  1. Fasten Luer lock connectors to tubing created in step 1
to:
  1. Fasten a Male Luer lock connector to tubing created in step 1
Changed line 46 from:
  1. Attach Teflon air filter to connecter side of tubing
to:
  1. Attach the female end of the Teflon air filter to other end of the tubing
Changed lines 17-18 from:
  • (2) 3" tube
to:
  • (1) 1" tube
  • (1) 3" tube
Changed line 20 from:
  • (1) 5' long tube
to:
  • (1) 5' tube
Added lines 22-26:
  1. Attach two 6-way barb manifolds end-to-end with the 1" section of tube.
  2. On the two other ends attach the 3" and 5' tubes.
  3. On the remaining 8 ends of the barb manifolds attach the 8 2' tubes.
  4. On the 8 2' pieces of tubing attach male Luer-barb connectors.
  5. on the 2 remaining pieces, connect female Luer-barb connectors.
Changed line 42 from:
  1. Cut tubing (2cm diameter?)
to:
  1. Cut tubing (1/8" ID x 1/4" OD)
Changed line 16 from:
  1. Cut Tubing (50mm diameter?)
to:
  1. Cut Tubing (1/16" ID 1/8" OD silicone). Note: you may adjust the length of tubing as needed for your configuration.
Changed line 15 from:
If preparing for the first time, do steps 1-2 else skip to 3
to:
If preparing for the first time.
Added lines 22-26:
If reusing tubing.
  1. Inspect the tubing.
    1. Check the tubing for holes and leaks.
    2. Check the tubing for fatigue cause by the pinch valves. Look for dents in the tubing, if it looks bad enough or tears when stretched, replace the tubing.
Changed lines 30-32 from:
  1. Rinse with DI water
to:
  1. Rinse with DI water.
    1. Note: It's important to thoroughly rinse all tubing. Any left over media will burn in the autoclave and may discolor the media used to blank the system.
Changed line 20 from:
  1. Assemble tubes together in an "octopus" system
to:
  1. Assemble tubing manifold
Changed line 22 from:
  1. Rinse octopus tubing system
to:
  1. Rinse tubing system
Added line 24:
  1. using a squeeze bottle flush ethanol into each opening of the 10 way tubing manifold.
Changed line 10 from:

Six Way Connector\\\

to:

Six Way Manifold\\\

Deleted line 36:
  1. NEED TO EXPLAIN HOW TO CREATE STOPPER WITH NEEDLES IN IT
Changed line 67 from:
  • Set the temperature to 121 deg C?
to:
  • Set the temperature to 121 °C?
Added lines 6-7:

Male Luer Lock

Deleted lines 8-9:

Male Luer Lock\\\

Added line 37:
  1. NEED TO EXPLAIN HOW TO CREATE STOPPER WITH NEEDLES IN IT
Changed line 18 from:
  • (4) 2' tube
to:
  • (8) 2' tube
Changed line 1 from:
to:
Changed line 70 from:
to:
Changed line 1 from:

Next

to:
Changed line 70 from:

Next

to:
Added line 1:

Next

Changed line 70 from:

Continue to next section

to:

Next

Changed lines 67-69 from:
  • Setting is a preset called "Packs" on some autoclaves
to:
  • Setting is a preset called "Packs" on some autoclaves

Continue to next section

Changed line 6 from:
to:
Changed line 8 from:
to:
Changed lines 10-11 from:

https://students.washington.edu/cnt/pmwiki/pub/uploads/OperatingManual/SetupAssembleClosedSystem/AssembledTubing.jpeg Assembled Tubing

to:

https://students.washington.edu/cnt/pmwiki/pub/uploads/OperatingManual/SetupAssembleClosedSystem/AssembledTubing.jpeg Assembled Tubing

https://students.washington.edu/cnt/pmwiki/pub/uploads/OperatingManual/SetupAssembleClosedSystem/InputConnection.jpeg Input port connection

Changed lines 10-11 from:

https://students.washington.edu/cnt/pmwiki/pub/uploads/OperatingManual/SetupAssembleClosedSystem/AssembledTubing.jpeg Assembled Tubing

to:

https://students.washington.edu/cnt/pmwiki/pub/uploads/OperatingManual/SetupAssembleClosedSystem/AssembledTubing.jpeg Assembled Tubing

Changed line 4 from:
\\
to:
Changed line 6 from:
\\
to:
Changed line 8 from:
\\
to:
Changed line 1 from:

NEED: Picture of air filters, diagram of input and export holes, and completed closed system

to:

NEED: Picture of air filters, diagram of input and export holes on plug, and completed closed system

Added lines 1-2:

NEED: Picture of air filters, diagram of input and export holes, and completed closed system

Changed line 16 from:
  1. Assemble tubes together
to:
  1. Assemble tubes together in an "octopus" system
Changed line 18 from:
  1. Rinse tubing
to:
  1. Rinse octopus tubing system
Changed line 50 from:
  1. Connect a Luer lock end of a 2' tubing section to an inport port on the culture vessel
to:
  1. Connect a Luer lock end of a 2' tubing section of the octopus tubing system to an inport port on the culture vessel
Changed line 61 from:
  1. Place closed system into an autoclave with
to:
  1. Place closed tubing-culture vessel system into an autoclave
Changed line 63 from:
  1. Run autoclave for 30? minutes
to:
  1. Run autoclave for 30 minutes
Changed line 44 from:
  1. Rinse out inport ports with ethanol
to:
  1. Rinse out input ports with ethanol
Deleted lines 45-47:
  1. Repeat steps 1-2 for the 7 remaning culture tubes
Assembly
  1. Place stir bar into culture tube
Changed lines 33-37 from:
  1. Clean culture tube with water and soap
    • Take care to clear all biofilms off of culture tube walls
      • It's okay for stir bar to be in or out of the culture vessel
    • Rinse culture tube with ethanol
    • Rinse culture tube with DI water
to:
  1. Clean culture tube
    1. Wash with soap and water
      • Make sure to clean all biofilms off of culture tube walls
    2. Rinse culture tube with ethanol
    3. Rinse culture tube with DI water
Changed lines 39-40 from:
  • Rinse with ethanol
to:
  1. Rinse with ethanol
  2. Rinse with DI water
Changed line 34 from:
  • Take care to clear all biofilms off of culture vessel
to:
  • Take care to clear all biofilms off of culture tube walls
Changed lines 36-39 from:
  1. Rinse culture tube with ethanol
  2. Rinse culture tube with DI water
  3. Rinse stir bar with ethanol
  4. Place stir bar into culture tube
to:
  • Rinse culture tube with ethanol
  • Rinse culture tube with DI water
  1. Clean magnetic stir bar
    • Rinse with ethanol
  2. Place stir bar into culture tube with a little bit of DI water
Added line 29:
  • See Images to the left:
Changed line 16 from:
  1. Fasten connectors to tubing
to:
  1. Assemble tubes together
Changed lines 1-2 from:
\\
to:

Parts
\\

Added line 9:
Changed line 7 from:
Assembled Tubing
to:

https://students.washington.edu/cnt/pmwiki/pub/uploads/OperatingManual/SetupAssembleClosedSystem/AssembledTubing.jpeg Assembled Tubing

Changed line 1 from:
\\
to:
\\
Changed line 2 from:

Female Luer Lock\\\

to:

Female Luer Lock\\\

Changed line 4 from:

Male Luer Lock\\\

to:

Male Luer Lock\\\

Changed lines 6-7 from:

Six Way Connector

Assembled Tubing

to:

Six Way Connector

Assembled Tubing

Added lines 1-7:

Female Luer Lock


Male Luer Lock


Six Way Connector

Assembled Tubing
Changed lines 15-20 from:
  • See images bellow:

Female Luer Lock

Male Luer Lock

Six Way Connector

Assembled Tubing
to:
  • See images to the left:
Changed lines 25-28 from:
  • See Images Bellow

Female Luer Lock
to:
  • See Images to the left:
Changed lines 10-14 from:

Female Luer Lock

Male Luer Lock

Six Way Connector

Assembled Tubing

\\

to:

Female Luer Lock

Male Luer Lock

Six Way Connector

Assembled Tubing
Changed lines 10-13 from:

Female Luer Lock

Male Luer Lock

Six Way Connector

Assembled Tubing
to:

Female Luer Lock

Male Luer Lock

Six Way Connector

Assembled Tubing
Changed line 13 from:

Assembled Tubing
to:

Assembled Tubing
Changed line 12 from:

Attach:5WayConnector.jpeg Δ | Five Way Connector

to:

Six Way Connector
Changed line 14 from:
to:

\\

Changed line 18 from:
to:

\\

Changed line 11 from:
to:

Male Luer Lock
Changed line 13 from:

Assembled Tubing
to:

Assembled Tubing
Changed lines 8-14 from:
  • See diagram bellow (not implemented yet)
to:
  • See images bellow:

Female Luer Lock

Attach:LuerLockMale1.jpeg Δ | Male Luer Lock Attach:5WayConnector.jpeg Δ | Five Way Connector


Assembled Tubing
Changed lines 23-25 from:
  1. Fasten Luer lock connector to tubing created in step 1
    • See diagram bellow (not implemented yet)
to:
  1. Fasten Luer lock connectors to tubing created in step 1
    • See Images Bellow

Female Luer Lock
Changed lines 64-67 from:
  • Setting is a preset called "Packs" on some autoclaves

http://pmichaud.com/img/misc/pc.jpg | [- [[ Wikipedia:Paper_clips | Paper clips ]] are fun to work with. -]

to:
  • Setting is a preset called "Packs" on some autoclaves
Changed line 19 from:
  • ""
to:
Changed line 59 from:

Wikipedia:Paper_clips | Paper clips ]] are fun to work with. -]

to:

Wikipedia:Paper_clips | Paper clips ]] are fun to work with. -]

Changed lines 56-59 from:
  • Setting is a preset called "Packs" on some autoclaves
to:
  • Setting is a preset called "Packs" on some autoclaves

http://pmichaud.com/img/misc/pc.jpg | [- [[ Wikipedia:Paper_clips | Paper clips ]] are fun to work with. -]

Changed line 19 from:
to:
  • ""
Added line 19:
Changed lines 53-54 from:
  • Set the temperature to 125º C?
  1. Run autoclave for 30? minutes
to:
  • Set the temperature to 121º C?
  1. Run autoclave for 30? minutes
    • Setting is a preset called "Packs" on some autoclaves
Changed lines 52-54 from:
  1. Place closed system into an autoclave with a set temperature of 125º C? for 30? minutes
to:
  1. Place closed system into an autoclave with
    • Set the temperature to 125º C?
  2. Run autoclave for 30? minutes
Changed lines 49-52 from:
NOTE: All aluminum foil wraps should be tight enough so that no liquid is able to enter the now enclosed tubing-culture vessel system
to:
NOTE: All aluminum foil wraps should be tight enough so that no liquid is able to enter the now enclosed tubing-culture vessel system

AUTOCLAVE CLOSED SYSTEM

  1. Place closed system into an autoclave with a set temperature of 125º C? for 30? minutes
Changed lines 15-19 from:
to:
  1. Cut tubing (2cm diameter?)
    • (8) 6" tube
  2. Fasten Luer lock connector to tubing created in step 1
    • See diagram bellow (not implemented yet)
  3. Attach Teflon air filter to connecter side of tubing
Changed lines 1-2 from:

TUBING PREPARATION

If preparing for the first time, do steps 1-2 else skip to 3
to:

TUBING PREPARATION

If preparing for the first time, do steps 1-2 else skip to 3
Changed lines 13-14 from:

CULTURE VESSEL PREPARATION

Body
to:

AIR FILTER PREPARATION

Execute steps bellow only if no air filters are created or need replacing

CULTURE VESSEL PREPARATION

Body
Changed line 27 from:
Plug
to:
Plug
Changed line 31 from:
Assembly
to:
Assembly
Changed line 36 from:

CLOSED SYSTEM ASSEMBLY

to:

CLOSED SYSTEM ASSEMBLY

Changed lines 14-15 from:
Apply to all culture vessels

Body

to:
Body
Changed lines 22-23 from:

Plug

to:
  1. Repeat steps 1-5 for the 7 remaning culture tubes
Plug
Changed lines 26-27 from:

Assembly

to:
  1. Repeat steps 1-2 for the 7 remaning culture tubes
Assembly
Changed lines 30-31 from:
to:
  1. Repeat steps 1-2 for the 7 remaning culture tubes
Changed line 41 from:
NOTE: All aluminum foil wraps should be tight enough so that no liquid is able to enter the now enclosed tubing-culture vessel system
to:
NOTE: All aluminum foil wraps should be tight enough so that no liquid is able to enter the now enclosed tubing-culture vessel system
Changed line 16 from:
  1. Clean culture vessel with water and soap
to:
  1. Clean culture tube with water and soap
Changed lines 19-20 from:
  1. Rinse culture vessel with ethanol
  2. Rinse culture vessel with DI water
to:
  1. Rinse culture tube with ethanol
  2. Rinse culture tube with DI water
Changed line 22 from:
  1. Place stir bar into culture vessel
to:
  1. Place stir bar into culture tube
Changed lines 27-29 from:
  1. Place stir bar into culture vessel
  2. Securely place plug into culture vessel
to:
  1. Place stir bar into culture tube
  2. Securely place plug into culture tube
Changed lines 31-39 from:
  1. Connect Luer lock ends of the 2' tubing sections to an inport port on the culture vessel
to:
  1. Connect a Luer lock end of a 2' tubing section to an inport port on the culture vessel
  2. Connect an air filter to the other inport port on the culture vessel
  3. Repeat for the 7 remaining culture vessels
    • After this step, the culture vessels should only have their export ports open to the environment
  4. Wrap all open ends of the tubing system in aluminum foil
  5. Wrap all culture vessel export ports in aluminum foil
  6. Wrap the air filter in aluminum foil
    • Double check that all open ends of the tubing system, export ports, and air filters are properly wrapped in aluminum foil
NOTE: All aluminum foil wraps should be tight enough so that no liquid is able to enter the now enclosed tubing-culture vessel system
Changed line 15 from:

BODY

to:

Body

Changed lines 23-24 from:

'PLUG

  1. Rinse out input ports with ethanol
to:

Plug

  1. Rinse out inport ports with ethanol
Changed line 26 from:

ASSEMBLY

to:

Assembly

Added line 31:
  1. Connect Luer lock ends of the 2' tubing sections to an inport port on the culture vessel
Changed lines 15-16 from:
  1. Rinse culture vessel with water and soap
to:

BODY

  1. Clean culture vessel with water and soap
Added lines 19-30:
  1. Rinse culture vessel with ethanol
  2. Rinse culture vessel with DI water
  3. Rinse stir bar with ethanol
  4. Place stir bar into culture vessel

'PLUG

  1. Rinse out input ports with ethanol
  2. Rinse out export port with ethanol

ASSEMBLY

  1. Place stir bar into culture vessel
  2. Securely place plug into culture vessel

CLOSED SYSTEM ASSEMBLY

Changed lines 15-17 from:
to:
  1. Rinse culture vessel with water and soap
    • Take care to clear all biofilms off of culture vessel
      • It's okay for stir bar to be in or out of the culture vessel
Deleted lines 0-8:

MATERIALS

  • 50mm? diameter tubing
  • 2cm? diameter tubing
  • (16) ?gage syringe
  • (8) Foam stopper
  • (8) Glass capillary
  • (8) Teflon air filter
Added line 2:
If preparing for the first time, do steps 1-2 else skip to 3
Added lines 1-23:

MATERIALS

  • 50mm? diameter tubing
  • 2cm? diameter tubing
  • (16) ?gage syringe
  • (8) Foam stopper
  • (8) Glass capillary
  • (8) Teflon air filter

TUBING PREPARATION

  1. Cut Tubing (50mm diameter?)
    • (2) 3" tube
    • (4) 2' tube
    • (1) 5' long tube
  2. Fasten connectors to tubing
    • See diagram bellow (not implemented yet)
  3. Rinse tubing
    1. Rinse with ethanol
    2. Rinse with DI water

CULTURE VESSEL PREPARATION

Apply to all culture vessels
Edit - History - Print - Recent Changes - Search
Page last modified on August 16, 2014, at 04:05 PM