Health Sciences Services

April 30, 2015

4/30/2015 ARCF Construction Update

Shoring work in the Foege loading dock is continuing this week. The dock will be unavailable for vehicle access during the hours of 3:00pm and 6:00am on weekdays through Friday, May 1st. Pedestrian egress from Foege through the dock during these hours will be available in cases of emergency only.

Daytime sidewalk closures on the south side of NE Pacific Street will continue as soldier pile installation progresses, and soil excavation and export continues on a reduced schedule at this time.