5/27 Weekly ARCF Construction Update
Significant ARCF construction activities for this week include:
- Excavation and hauling work continues– there will be increased truck traffic on NE Boat St, NE Pacific St, 15th Ave NE.
- Underpinning soldier piles continues, footing demolition and work ongoing at the loading dock.
- Install concrete curb cut to site entrance from Boat Street. One lane of Boat Street and sidewalk will be shut down.
- New temporary pedestrian ramp will be built and the existing switchback ramp will be demolished.