logo for Elisabeth C. Miller Library, University of Washington Botanic Gardens

Archives Accession # 544

About the Archives

Located at the Miller Library.

Each accession (i.e. 2.00.72.01) represents a box or cubby with various contents.

Purpose and scope

Search Title, Summary and Description fields

All records

1.2.02a. Union Bay Natural Area: 520 Bridge Mitigation after 2013

Date statement: : -
Summary:

 1 file box
Description:
 1 file folder labelled: 1.2.02a Union Bay natural Area: 520 Bridge Mitigation after 2014:
4/1/2015, email from Dawn Yankauskas to Fred C. Hoyt re: "UBNA Meeeting with Corp," 1 p. with handwritten notes.
3/25/2015 - 3/05/2015, email chain re: "revised LTM plan for UBNA for your review (UNCLASSIFIED)," Fred C. Hoyt, Dawn Yankauskas, Gretchen Lux, 7 pp. with handwritten notes.
2/9/2015, "Draft Long Term Management Plan/WSDOT Mitigation Project at the Union Bay Natural Area," 15 pp. (2 copies).
1/26/2015 - 12/12/2014, emails re: planting in UBNA, 6 pp., including 2 aerial photos.
1/16/2015, "SR 520 Union Bay Natural Area," "Planting Plan," "Planting Details," "Plant Material List," "WSDOT "Preliminary" landscape plans, 9 pp.
1/14/2015, "SR 520 Union Bay Natural Area West Approach Wetland Mitigation Planting Plan," landscape plan,  with handwritten notes 1 p.  A second copy in reduced size has no notes.
1/9/2015, "Draft Long Term Management Plan for WSDOT Mitigation Project at the Union Bay Natural Area," 13 pp.
1/7/2015, "SR 520 Bridge Replacement and HOV Program," weekly meeting agenda, 1 p.
1/6/2015, "Union Bay Natural Area - Action Items," 1 p.
1/6/2015, "Union Bay Natural Area Mitigation Site - Site Development Schedule," draft schedule 2015-2017,1 p.

1 file folder labelled:  1/2/02a Union Bay Natural Area: 520 Bridge Mitigation Project, 2014.

12/17/2014, "Wetland Protection Signage Proposal," draft, 1 p.
12/16/2014, "Draft Long Term Management Plant for WSDOT Mitigation Project at the Union Bay Natural Area," 15 pp., (2 copies).
12/16/2014, "Record of Comment Resolution," 4 pp.
12/11/2014, "Exhibit 2 Union Bay Natural Area West Approach Wetland Mitigation Final Landscape Plan," 1 p. (Second copy, reduced size).
12/10/2014, "Union Bay Natural Area Mitigation Site - Site Development Schedule, 1 p., reduced size.
12/10/2014, "Planting Details - Draft - for discussion only," 1 p. A second copy is clipped with Google Earth photo from 5/4/2013, and unlabelled red ink outline of planting areas on yellow graph paper.
12/2014, "Final Wetland Mitigation Report/Addendum 3," 53 pp., stapled.
11/22/2014, "SR 520 Union Bay Natural Area West Approach Wetland Mitigation/Index," "Preliminary," stapled with 19 items on Index, 57 pp.
11/3/2014, "Duwamish Hill Preserve Phase 2 - DRAFT Plant List," 1 p. with pencil additions.
7/29/2014, Meeting agenda for "USBNA Site Tour & WSDOT Mitigation Project Discussion," 1 p.
7/28/2014, "Key Elements of Shorebird Habitat," 1 p., stapled with 2 color photos of Main Pond in 1961.
7/25/2014, "Technical Memo/Union Bay Natural Area Hydrologic Assessment,"
25 pp., stapled.
7/22/2014, "WSDOT/UW UBNA Preliminary Design Review Meeting Agenda," 1 p.
7/18/2014, "Of Comment Resolution," blank form.
7/18/2014,"SR 520 Union Bay Natural Area Wetland Mitigation Index, clipped with the 10 plans listed in the Index, plus a second, color copy of "Wetland Mitigation Survey," 21 pp. (2 copies).
7/18/2014, "Record of Comment Resolution/ SR 520 UBNA mitigation - Preliminary design package review: plans hydrology assessment (incl. dewatering), phase II letter(contaminated material) & weed control," 2 11 x 16 sheets.
7/8/2014, "Union Bay Natural Area Mitigation Site/Weed Control and Planting Design Strategies/ Design Decisions Technical Memorandum," 12 pp.
7/3/2014, Memo from GeoEngineers on "Union Bay Natural Area Soil Characterization - Addendum 1," 18 pp.
7/3/2014, "SR 520 Union Bay Natural Area Wetland Mitigation Project Phase II Site Investigation,"  Hazardous Materials Program report: 122 pp. clipped together.  
6/24/2014, "SITES v2 Scorecard Summary," 1 p. 
2014, "Shorebirds of UBNA," 4 pp.
2014, "Union Bay Natural Area West Approach Wetland Mitigation/Plans and Specifications/Advertising Documents," CD.
Accession date: 2019-10-16 Last updated: 2024-05-07 11:30:55
Subjects: Union Bay Natural Area

No names associated with this accession.
LocationNote
Archives compact shelving

Archives Inventory