CHN-MRI Peripheral Equipment
Documents for Grants
You can download the current CHN-MRI Facilities document here.
We are happy to provide a letter of support for any grant applications! Please email John Pyles.
Current Peripheral Equipment
- Siemens Coils:
- 64 channel head/neck
- 32 channel head
- 20 channel head/neck
- spine
- flex coils
- Installed C2P Sequences:
- CMRR Multiband BOLD & Diffusion EPI
- MGH SMS
- MGH Navigator Guided T1/T2
- MGH Multi-echo MPRAGE
- ABCD Protocols
- Delaware Brain EPI MRE
- UCL MPM (hMRI)
- MGH – gSlider, MIEPI, BlippedCAIPI, 3D_MRF
- UCLA PCASL
- HCP Protocols
- Visual Display:
- Response Devices:
- Auditory Presentation:
- Head Stabilization:
- Physiological Monitoring:
- Siemens Wireless Pulse Oximeter, Respiratory Belt, & EKG
- BIOPAC – GSR & electrical stimulation (expandable to any BIOPAC sensors!)
- Eyetracking:
- Participant Monitoring:
- FIRMM real-time motion monitoring
- Bore Camera (foot side)
- Bore Camera (head side, to be installed Fall 2022)
- Experiment Presentation Computers & Software:
- Windows: Presentation, E-Prime 3.0, Psychophysics Toolbox, PsychoPy
- Mac: Psychophysics Toolbox, PsychoPy, Matlab
- Linux (Ubuntu): To be installed Fall 2022
- Laptop: Researchers can bring a laptop and connect to all devices
- Testing Rooms:
- All testing rooms equipped with Windows PC with E-Prime 3.0.
- B120B: Round conference table & computer table
- B120C: Family waiting/testing with couch, rocking chair, white noise maker, dimming lamp, and computer table
- Safety & Participant Comfort:
- Large Waiting Room
- Guest Wifi
- Secure lockers and safe for personal items
- Mock Scanner:
- Custom PST Deluxe MRI Simulator
- Replicate Siemens 64ch Mock Head Coil
- MoTrak motion tracking system
- SimFx MRI auditory simulation built into mock scanner
- In-Bore participant monitoring camera
- Windows PC with Presentation, E-Prime 3.0, Psychophysics Toolbox, Matlab
- Display matching visual angle and resolution of real MRI
- Current Designs mock response devices
- Trigger simulator (to be installed Fall 2022)