The 150,000 m2 extension is also constructed over
ground which will consolidate. In order to avoid the ponding problem,
the pavement has been designed to be fully permeable. It comprises
concrete block paving with unusually large spacers to allow a 6mm
gap around each paver. The pavers are bedded on 6mm grit and the
same material is used in the joints. Tests have shown that all but
the heaviest showers percolate through the joints immediately. A
cleaning regime has been specified to avoid joint clogging.
|