Small Projects

Passing Zone Behavior and Sight Distance on Rural Highways


University: , ,

PI: Nathan Belz (UAF), npbelz@alaska.edu
Dates: 01/16/2015 – 06/15/2016
Status: Completed
UTC Project Sheet
Final Technical Report

In 2008, more than 27 percent of fatal crashes occurred at horizontal curves. Due to the predominance of horizontal curves on typical rural roads, a higher percentage of fatal curve-related crashes occur on rural roads, particularly on two-lane roadways in rural areas; fatality rates on rural roads are typically more than twice the rate than on urban roads. Of all fatal crashes that occur on two-lane rural highways, about 20% are head on collisions with passing being the main cause of this type of crash. Read More

Safety Evaluation of Statewide Off-Highway Vehicle Use in Alaska


University: , ,

PI: Nathan Belz (UAF), npbelz@alaska.edu

AMOUNT & MATCH: $60,000 from PacTrans; $90,000 Match

PERFORMANCE PERIOD: 12/15/2016 – 1/31/2018

STATUS: Completed

CATEGORIES: Safety, Rural Communities, Alternative Transportation

RESEARCH PROJECT HOT SHEET: download

UTC PROJECT DOCUMENTATION:

FINAL PROJECT REPORT: Read More

Understanding Truck Parking Behavior and Choice of Commercial Motor Vehicle Operators: Impacts on Roadway Safety


University: , ,

PI: Salvador Hernandez (OSU), sal.hernandez@oregonstate.edu

AMOUNT & MATCH: $35,000 from PacTrans; $35,000 Match

PERFORMANCE PERIOD: 12/15/2016 – 1/31/2018

STATUS: Completed

CATEGORIES: Safety, Parking, Freight

RESEARCH PROJECT HOT SHEET: download

UTC PROJECT DOCUMENTATION:

FINAL PROJECT REPORT: Read More

Analytical Tools for Resilience of Lifeline Highway Bridges to Tsunami Events


University: , ,

PI: Michael H. Scott (OSU), michael.scott@oregonstate.edu

AMOUNT & MATCH: $35,000 from PacTrans; $35,000 Match

PERFORMANCE PERIOD: 12/15/2016 – 1/31/2018

STATUS: Completed

CATEGORIES: Resilience, Highways, Infrastructure Management

RESEARCH PROJECT HOT SHEET: download

UTC PROJECT DOCUMENTATION:

FINAL PROJECT REPORT: Read More

Improving Safety on Highway Work-zones by Real-time Tracking of Operation and Equipment Status


University: , ,

PI: Joseph Louis (OSU), Joseph.Louis@oregonstate.edu

Co PIs: John Gambatese (OSU)

AMOUNT & MATCH: $35,000 from PacTrans; $35,000 Match

PERFORMANCE PERIOD: 12/15/2016 – 1/31/2018

STATUS: Completed

CATEGORIES: Safety, Work Zones

RESEARCH PROJECT HOT SHEET: download

UTC PROJECT DOCUMENTATION:

FINAL PROJECT REPORT: Read More

1 19 20 21 22 23 35