UW CHEMISTRY NMR

Announcments & Equipment Logs

AV800: system down due to gradient malfunction

We are waiting for a hardware replacement part.  The expected timeline for the same is end of this week i.e. 8 Feb 2013.  Any changes to this schedule will be posted here.


Leave a Reply

Your email address will not be published. Required fields are marked *

The maximum upload file size: 3 MB. You can upload: image. Links to YouTube, Facebook, Twitter and other services inserted in the comment text will be automatically embedded. Drop file here

Item Categories

Archives