UW CHEMISTRY NMR
Announcments & Equipment Logs
September, 2014
ALERT – AV500 : DEUTERIUM GRADIENT SHIMMING NON-FUNCTIONAL
A hardware board malfunction makes the 2H Topshim non-functional. Repair attempts are in progress with the faulty circuit board. Users can still use Topshim 1D and 3D for proteo-solvents and aqueous sample preps. Update will be posted in due course.
Posted in Hardware, Spectrometer | No Comments »
UPDATE ! – DRX499 – NEW COMPUTER INSTALLATION COMPLETE
The topspin environment is functional with the spectrometer, running on the new computer. Compilation of Topspin automation scripts is not yet up and running and this will be addressed in the coming days. But the spectrometer is usable in a normal fashion. Please keep the facility staff updated if you notice anything worthwhile. If your […]
Posted in Uncategorized | No Comments »
UPDATE : ALL FACILITY INSTRUMENTS ARE OPERATIONAL
All instruments tested to be stable and in normal operational mode. The FTP server is hosting the data trees of all instruments, as expected.
Posted in Hardware, Spectrometer | No Comments »
ALERT ! FACILITY POWER SHUTDOWN TOMORROW, Sept. 5th
As announced earlier, the NMR facility instruments will be shutdown by 3.30 pm tomorrow in anticipation of a scheduled power shut down to the NMR lab i.e. Room:37, Bagley Hall by early morning on Saturday the 6th September. The power shut down is announced to last until 3.00 pm on Saturday. The instruments will be […]
Posted in Hardware, Spectrometer | No Comments »