UW CHEMISTRY NMR

Announcments & Equipment Logs

December, 2016

UPDATE ! AV301 – SYSTEM BACK TO NORMAL

Users can start booking time for regular use. Please post a message in the log book, if you notice anything amiss. NMR Facility Manager 12/30/2016

Posted in Uncategorized | No Comments »

ALERT ! AV301 – SYSTEM DOWN DUE TO NETWORKING ISSUES

We are looking into the network problems that has broken communication with the spectrometer console.  Until the problem is resolved, the spectrometer cannot be used. Updates will be posted as soon as the system is revived. NMR Facility Manager 12/29/2016

Posted in Host Computer, Operating System | No Comments »

AV700 AVAILABLE FOR SOLUTIONS USE – PABBO PROBE

As of today, Tuesday, December 27, the av700 has been returned to solutions use with the BBO probe installed.  

Tags:

Posted in Hardware, Spectrometer | No Comments »

ALERT ! AV301 – SYSTEM IS READY FOR USE AGAIN ! – SORRY FOR THE INTERRUPTION

It has been a normal practice that we post a warning when the instrument goes down and give a brief explanation about the nature of the problem.  In the past couple of days, I had to take down the instrument from regular use without any announcement because, what appeared to be a simple software issue […]

Posted in Uncategorized | No Comments »

ALERT ! PHOENIX FTP SERVER WILL BE DOWN BRIEFLY

To refresh a few processes, the FTP server phoenix will go down immediately. It should be online within ten minutes. NMR Facility Manager 12/12/16

Posted in Datasets, Host Computer, Operating System | No Comments »

AV301 : NEW COMPUTER UPGRADE COMPLETE

Users can find a welcome relief in the new AV301 host computer with the latest Operating System, which will provide a smooth and fast login and Topspin launch process. Currently the interface you use will be the same as you are familiar with. But this new platform will act as a test bed for trying […]

Posted in Host Computer, Operating System | No Comments »

ATTENTION ALL USERS ! : NMR LAB RM: 37 ACCESS RESTRICTION THIS WEEK

Facilities Works will redo the flooring of the corridor in Bagley Hall where the NMR lab is located  on the following days this week :  Tuesday, Wednesday and Thursday. This operation will last from 5.30 am until 8.30 am on each of these days.  During this time, no foot traffic will be allowed on the […]

Posted in Spectrometer, Uncategorized, Usage | No Comments »

Item Categories

Archives