UW CHEMISTRY NMR
Announcments & Equipment Logs
October, 2012
DRX499 VT Status change
The DRX499 is currently unable to do variable temperature experiments. Please plan your experiments accordingly. DO NOT ATTEMPT LOW OR HIGH TEMP EXPERIMENTS OR DEVIATE FROM 298K UNTIL FURTHER NOTICE. We will post as soon as the DRX499 is back to normal VT availability.
Posted in Uncategorized | No Comments »
AV500 UPDATE : BF1 SHIFT COMPLETE
The Base Frequency of the spectrometer is now reset to : 499.956572 MHz. Getting the line shape close to factory spec is still a work in progress. But, the current resolution achieved is comparable to the values with which we were operating prior to the frequency shift. Existing user created parameter sets and the Bruker […]
Posted in Software, Spectrometer, Usage | No Comments »
AV500 : PLANNED PROBE CHANGE and B0 FIELD CHANGE
The X{1H} -Z grad BBO probe will be tested and installed on 26th Oct’12, Friday. The probe optimization will be performed over the weekend and the probe should be ready for use by Monday, the 28th of Oct ’12. Along with this operation, the B0 field will be readjusted to re-position the LOCK field to […]
Posted in Hardware, Software, Spectrometer, Usage | No Comments »
AV800 : CRYOPROBE WALK-ON TIME AVAILABLE
Users who want to utilize the 800 MHz cryoprobe facility during the walk-on period next week between 22nd and 24th should contact the facility manager with your specific needs by the end of today, 19th Oct ’12. The slots will be filled on a first-come-first-serve basis.
Posted in Spectrometer, Usage | No Comments »
AV500: Automation Scripts Functional
All the stock Bruker au programs, such as multizg, multi_zgvt, multi_zgvd, etc. are operational once again. If users have their own au scripts, they should compile automatically, the first time you invoke them. If you face any difficulty, please contact the facility manager.
Posted in Software, Spectrometer | No Comments »