UW CHEMISTRY NMR

Announcments & Equipment Logs

DRX499 : UPDATE – OPERATIONAL WITH LIMITED FUNCTIONALITY

The spectrometer with the TXO probe is operational fully with 1H and 13C channels. The 19F is not yet ready for prime use as I write this and I will post an update once that issue is resolved as well. The instrument is open for regular use, with the above caveat.


Leave a Reply

Your email address will not be published. Required fields are marked *

The maximum upload file size: 3 MB. You can upload: image. Links to YouTube, Facebook, Twitter and other services inserted in the comment text will be automatically embedded. Drop file here

Item Categories

Archives