UW CHEMISTRY NMR

Announcments & Equipment Logs

UPDATE – DRX499 : SYSTEM WILL BE READY ON MONDAY, 24 Apr

I am acutely aware of the long down time on this instrument and I convey my sincere gratitude for your patient cooperation all along.  The good news is that, the system is brought to a stable and reliable state as I write this.  Last but not least, the shim up needs to be completed before you get usable data.  That process takes a large chunk of time on this old (system+software) combination.

I will release the instrument by Monday, not later than noon, by current estimates.

Thank you

NMR Facility Manager

4/21/2017


Leave a Reply

Your email address will not be published. Required fields are marked *

The maximum upload file size: 3 MB. You can upload: image. Links to YouTube, Facebook, Twitter and other services inserted in the comment text will be automatically embedded. Drop file here

Item Categories

Archives