UW CHEMISTRY NMR
Announcments & Equipment Logs
UPDATE – DRX499 : SYSTEM WILL BE READY ON MONDAY, 24 Apr
I am acutely aware of the long down time on this instrument and I convey my sincere gratitude for your patient cooperation all along. The good news is that, the system is brought to a stable and reliable state as I write this. Last but not least, the shim up needs to be completed before you get usable data. That process takes a large chunk of time on this old (system+software) combination.
I will release the instrument by Monday, not later than noon, by current estimates.
Thank you
NMR Facility Manager
4/21/2017
Leave a Reply