UPDATE ON AV700 : EXTENSIVE PROBE ISSUES
We had learnt that the contamination from the dryer/heat exchange system has affected the back up probehead i.e. BBO probehead also. It is imperative that we identify and fix both the source of such contamination and clean up both the probeheads to their operating specifications. We are pursuing these twin goals with lot of energy, with the acute reality of instrument down time giving all the needed pressure.
More updates as they come by.
NMR Facility Manager
5/9/2017