UW CHEMISTRY NMR

Announcments & Equipment Logs

ALERT ! AV300 – SYSTEM WILL BE DORMANT UNTIL TOMORROW

The ATMA probe’s functionality worsened further and so the eventuality I talked about came sooner.  The Probehead has been pulled out for repairs and it is early times to tell if the same probe will be back in the magnet within a day.

What to expect :  We will either place the fixed ATMA probe (PABBI) or a surrogate BBI probe in its place.  If it is the latter, the tuning/matching has to be done by hand as I mentioned in my last post.

I will update further developments tomorrow.

NMR Facility Manager

11/3/2020


Leave a Reply

Your email address will not be published. Required fields are marked *

The maximum upload file size: 3 MB. You can upload: image. Links to YouTube, Facebook, Twitter and other services inserted in the comment text will be automatically embedded. Drop file here

Item Categories

Archives