UW CHEMISTRY NMR

Announcments & Equipment Logs

PLEASE READ ! NMR FACILITY SHUT DOWN ON THURSDAY, 16TH SEPT FOR ELECTRICAL MAINTENANCE

Following the announcement that Bagley Hall will undergo Electrical Maintenance on Thursday, 16th September ’21, approximately at 5 PM,

all the NMR instruments will be powered down prior to the event.  Facilities and Services seems to have given 5 PM as the start of the shut down. But,  to avoid the sudden impact of an unceremonious shut down before that time,  like it happened last time, the instruments will be safely powered down starting at 3 PM.

We will revive the instruments as soon as we can following confirmation that the Electrical Work has been completed.  The instruments should be available for regular use by the morning of Friday, 17th Sept ’21, latest.

NMR Facility Manager

9/14/2021


Leave a Reply

Your email address will not be published. Required fields are marked *

The maximum upload file size: 3 MB. You can upload: image. Links to YouTube, Facebook, Twitter and other services inserted in the comment text will be automatically embedded. Drop file here

Item Categories

Archives