UW CHEMISTRY NMR

Announcments & Equipment Logs

ALERT ! BAGLEY DUAL POWER SHUTDOWN AND NMR LAB IMPACT

Dear Users

As you can see from the reservation calendar,  we shall turn off everything twice the coming week, starting on the afternoon of Sunday.  Systems will be revived back as soon as possible after the power is restored.

Please give ample lead time to yourself to plan around this rare double shut down in a week.

NMR Facility Manager

12/17/2021


Leave a Reply

Your email address will not be published. Required fields are marked *

The maximum upload file size: 3 MB. You can upload: image. Links to YouTube, Facebook, Twitter and other services inserted in the comment text will be automatically embedded. Drop file here

Item Categories

Archives