UW CHEMISTRY NMR

Announcments & Equipment Logs

UPDATE – AV301 : REPAIR PARTS ORDERED TO RESURRECT PROBE

Dear Users

The consistently poor shim performance and the related failure to lock on a solvent after Topshim, especially for weak solvent signals such as CDCl3 is due to broken parts inside the probehead.

Since this is the surrogate i.e. backup probehead, I do not have another backup probehead with Topshim capability to replace it immediately.  Since the parts ordered should be here in a couple of days, I am hopeful to put the same probe back in the magent by Thursday.

If you remember, the original probe with ATMA and Topshim capability developed issues and that probe has been sent to the factory for repairs.

Stay tuned for further updates.

NMR Facility Manager

11/8/2022


Leave a Reply

Your email address will not be published. Required fields are marked *

The maximum upload file size: 3 MB. You can upload: image. Links to YouTube, Facebook, Twitter and other services inserted in the comment text will be automatically embedded. Drop file here

Item Categories

Archives