UW CHEMISTRY NMR

Announcments & Equipment Logs

ALERT ! Electrical Work Shut Down Information

On Wednesday, December 20, 2023, 7:00-9:00 AM Bagley Hall will experience a power shutdown for electrical work.

The NMR Facility will begin shutdown procedures on most of the NMR Spectrometers at 4:00 PM on Tuesday, December 19. The NEO500 will begin at 1:00 PM due to planned weekly maintenance.

We will begin bringing the instruments back online as soon as possible after the power returns. Please expect most NMR spectrometers to be ready for use by noon on Wednesday, December 20. Please watch this space for an announcement. Instruments will be released on the reservation pageĀ as they become available.

The NEO500 will remain down for routine, extended maintenance of the cryoprobe until Thursday, December 21 mid-morning. Please watch this space for an announcement, plus the reservation page and the queue status for information when the NEO500 is returned to availability.

 

Posted by Adrienne


Leave a Reply

Your email address will not be published. Required fields are marked *

The maximum upload file size: 3 MB. You can upload: image. Links to YouTube, Facebook, Twitter and other services inserted in the comment text will be automatically embedded. Drop file here

Item Categories

Archives