UW CHEMISTRY NMR

Announcments & Equipment Logs

ALERT ! Power Restored, Main NMR Facility Operational

Good morning.

The NMR systems in BAG 37 are back online and operational after this morning’s planned power shutdown. This includes the av300, av301, and GG500. The av700 is also online and operational. As always, please refer to the reservation page for reservations and use.

The systems with cyroprobes require additional time to be ready. Reminder: the NEO500 is having extended routine maintenance and will return to use tomorrow, Thursday, December 21 around mid-day.

Please let me know if you have any questions or concerns.

-Adrienne M. Roehrich, PhD
Associate Manager, NMR Facility


Leave a Reply

Your email address will not be published. Required fields are marked *

The maximum upload file size: 3 MB. You can upload: image. Links to YouTube, Facebook, Twitter and other services inserted in the comment text will be automatically embedded. Drop file here

Item Categories

Archives