UW CHEMISTRY NMR
Announcments & Equipment Logs
ALERT ! Power Restored, Main NMR Facility Operational
Good morning.
The NMR systems in BAG 37 are back online and operational after this morning’s planned power shutdown. This includes the av300, av301, and GG500. The av700 is also online and operational. As always, please refer to the reservation page for reservations and use.
The systems with cyroprobes require additional time to be ready. Reminder: the NEO500 is having extended routine maintenance and will return to use tomorrow, Thursday, December 21 around mid-day.
Please let me know if you have any questions or concerns.
-Adrienne M. Roehrich, PhD
Associate Manager, NMR Facility
Leave a Reply