UW CHEMISTRY NMR

Announcments & Equipment Logs

GG500 : AUTOMATION QUEUE STOPPED FOR MAINTENANCE

There were multiple instances of sample injection failure today.  We are testing the system and troubleshooting possible causes.  As a result, the  Automation queue is stopped.

As of now we expect to resume the automation queue by 4 pm but this can change. Please consult the Reservation Page before you plan to come to the lab with your sample.

NMR Facility


Leave a Reply

Your email address will not be published. Required fields are marked *

The maximum upload file size: 3 MB. You can upload: image. Links to YouTube, Facebook, Twitter and other services inserted in the comment text will be automatically embedded. Drop file here

Item Categories

Archives