UW CHEMISTRY NMR

Announcments & Equipment Logs

ALERT : DRX499 – PROBE CHANGE EVENT – 16th Oct ’15

The currently installed TXO 19F {1H,13C}  probehead will be replaced by the BBO – X{1H} Z gradient broad band probe beginning 16th October, Friday.  The DRX499 needs considerably more time to prime the shims and so the system will be ready for regular operation on Monday, the 19th.   We will keep you informed of any changes in this plan or any other relevant updates.

Please note :  Those users who need 19F capability can utilize the AV301 instrument which has been optimized recently for routine operation.  Please feel free to contact one of us if you have questions.

NMR Facility Manager

10/6/15


Leave a Reply

Your email address will not be published. Required fields are marked *

The maximum upload file size: 3 MB. You can upload: image. Links to YouTube, Facebook, Twitter and other services inserted in the comment text will be automatically embedded. Drop file here

Item Categories

Archives