UW CHEMISTRY NMR

Announcments & Equipment Logs

ALERT ! AV500 – PROBE CHANGE ON THURSDAY, 11TH FEB ‘ 16

The BBI Z-gradient probe has been repaired and is ready to be installed and field tested. We will put in the probe by the afternoon of Thursday, 11th February ’16.  Hoping that everything turns out right, the spectrometer should be ready for regular use by that evening.

 


Leave a Reply

Your email address will not be published. Required fields are marked *

The maximum upload file size: 3 MB. You can upload: image. Links to YouTube, Facebook, Twitter and other services inserted in the comment text will be automatically embedded. Drop file here

Item Categories

Archives