UW CHEMISTRY NMR

Announcments & Equipment Logs

ALERT ! DRX499 – DOWN FOR HARDWARE MAINTENANCE

Both RF as well as gradient sections need to be inspected/serviced to bring the instrument back to optimal condition. Some of these issues have been pending to be addressed and it is past due to get to these. Thank you for your patience and understanding.

I expect the instrument to be back in operation by Friday.  Every effort will be put to get it back on line before that.

NMR Facility Manager

4/11/17


Leave a Reply

Your email address will not be published. Required fields are marked *

The maximum upload file size: 3 MB. You can upload: image. Links to YouTube, Facebook, Twitter and other services inserted in the comment text will be automatically embedded. Drop file here

Item Categories

Archives