UW CHEMISTRY NMR

Announcments & Equipment Logs

ALERT ! AV300 : PROBE PART DAMAGE – SYSTEM DOWN

The insert glass is broken and the system is unusable. We are working on fixing it.   Will post an update once we replace the broken part.  Normally, if a broken glassware is replaced, the probe will need substantial shim up.  To cope with constant demand on the instrument, I might leave the probe with old shim set for the present. Those of you who need really good lineshape should do the shimming by hand.  At a later time a full shim up will be completed.

NMR Facility Manager

5/3/2017

 


Leave a Reply

Your email address will not be published. Required fields are marked *

The maximum upload file size: 3 MB. You can upload: image. Links to YouTube, Facebook, Twitter and other services inserted in the comment text will be automatically embedded. Drop file here

Item Categories

Archives