UW CHEMISTRY NMR

Announcments & Equipment Logs

ALERT ! AV500 — SYSTEM TEMPORARILY DOWN

I had to pull out the probehead to fix a tuning issue on 13C channel and we are working on it. I estimate that the system will be ready for normal operation by tomorrow noon, latest.

Thank you

NMR Facility Manager

10/8/2020


Leave a Reply

Your email address will not be published. Required fields are marked *

The maximum upload file size: 3 MB. You can upload: image. Links to YouTube, Facebook, Twitter and other services inserted in the comment text will be automatically embedded. Drop file here

Item Categories

Archives