UW CHEMISTRY NMR

Announcments & Equipment Logs

UPDATE – AV300 : ATMA PROBE BEING TESTED

After servicing the ATMA probe head in-house, the unit will be tested in the spectrometer, with the hope that everything turns out well.  In that case, the ATMA probe will be back in service sometime today.  Please look for an updated post on this.

NMR Facility Manager

5/11/2017


Leave a Reply

Your email address will not be published. Required fields are marked *

The maximum upload file size: 3 MB. You can upload: image. Links to YouTube, Facebook, Twitter and other services inserted in the comment text will be automatically embedded. Drop file here

Item Categories

Archives