GG500 : SYSTEM BACK TO NORMAL – ICON QUEUE RUNNING NOW

Following user input,  we checked and fixed any pending issues with ATMA Topshim Tested OK.  IconNMR queue has restarted. You can submit samples now. NMR Facility  

Posted in Hardware, Spectrometer | No Comments

GG500 : ICONNMR AUTOMATION RUNNING.

You can queue up samples as before.  But, expect sporadic sample injection issues.  We are monitoring the system for further clues.  At this point, the system is returned to normal use. NMR Facility (contact : nmrissues@chem.washington.edu)

Posted in Hardware, Spectrometer | No Comments

GG500 : AUTOMATION QUEUE STOPPED FOR MAINTENANCE

There were multiple instances of sample injection failure today.  We are testing the system and troubleshooting possible causes.  As a result, the  Automation queue is stopped. As of now we expect to resume the automation queue by 4 pm but this can change. Please consult the Reservation Page before you plan to come to the […]

Posted in Hardware, Spectrometer | No Comments

REMINDER : PLEASE CLEANUP YOUR OLD SAMPLE TUBES

GG500 :   Please remove all the sample tubes that have already run your experiments,  by 1 PM latest, today.   Sample tubes left in the Carousel will be considered ‘abandoned’  and removed for disposal. NEO500 :  By 1 PM latest,  please remove all the sample tubes that have completed their run from the Carousel.   Remove ALL […]

Posted in NMR Facility Usage | No Comments

GG500 – UPDATE ! AUTOMATION QUEUE RESTORED AND RECEIVING SAMPLES

An important hardware upgrade was completed today.  This should address the sproadically failing sample landing issues we noticed recently.   The vitals are all good and the system is shimmed up and ready.  The automation is queue is already running. Please submit samples at your convenience. NMR Facility (contact: nmrissues@chem.washington.edu)

Posted in NMR Facility Usage | No Comments

UPDATE ! ALL NMR SYSTEMS READY FOR USE

Calendar for 300-s are open now. NEOO500 automation queue has restarted.  Submit samples as convenient. NMR Facility

Posted in Hardware, Usage | No Comments

UPDATE : AFTERMATH OF POWER DISRUPTION YESTERDAY

The systems are being revived and within next 30 minutes they should be ready of regular use.  The FTP server will also be reset as needed during this time.   The calendar will be blocked from reservation for the 30 min. approximately. We will post an update once everything is back to routine status. NMR Facility

Posted in NMR Facility Usage, Usage | No Comments

GG500 – PLANNED MAINTENANCE , Jul. 1 Mon – IMPACT

For better part of the day on Jul. 1, Monday, the system will be down for hardware maintenance.  The automation queue will be stopped early in the morning that day.  Do not plan to queue any experiments from 8 AM. The Automation queue should resume from 5 PM latest, that day, but for unexpected contingencies. […]

Posted in Hardware, Spectrometer, Usage | No Comments

UPDATE : GG500 – SWITCH TO MANUAL MODE LATER TODAY

Due to the HVAC radiator maintenance and asbestos mitigation of the NMR lab yesterday,  the automation queue could not be continued from 4.30 pm. The system will attempt to complete the pending queue before it is switched to Topspin direct login. NMR Facility 6/18/24

Posted in NMR Facility Usage, Spectrometer, Usage | No Comments

PLEASE NOTE : UW FACILITIES WORK IN NMR ROOM

Please bear with us for not able to bring this update earlier.  Facilities and Services is taking care of a long overdue Radiator Work and residual asbestos mitigation on some tiles in Room:33 (NEO500) and Rm.37 (GG500 and 300 NMRs), today and tomorrow. They have scheduled it to have minimal impact to the operation to […]