UW CHEMISTRY NMR

Announcments & Equipment Logs

Usage

REMINDER ! NEO500 – PLEASE CLEANUP ALL YOUR USED SAMPLE TUBES

Before the day is through, at the least, please pick up all your used samples that are sitting in the buffer rack.   Help us keep the NMR space clean and user friendly. Thank you NMR Facility 9.20.24

Posted in Spectrometer, Usage | No Comments »

UPDATE ! NEO500 – BACK ON LINE AND RUNNING SAMPLES

You can start submitting samples, but note the following points : The Web interface page that shows the queue status, is not ON yet but will be revived momentarily. The email feature that sends you PDF files, is dealyed a bit but should be back online, latest by tomorrow. Thank you for your patience and […]

Posted in Spectrometer, Usage | No Comments »

UPDATE : NMR SYSTEMS STATUS – PLEASE NOTE.

The 300 NMR-s and GG500 will be available for regular use from 12 NOON. NEO500 should come on line late afternoon;  please wait for confirmation that the Automation queue is up again before proceeding.  If anything changes,  we will post an update asap via this portal. NMR Facility 8/19/24  

Posted in Spectrometer, Usage | No Comments »

ALERT : BAGLEY HALL ELECTRICAL MAINTENANCE – PREPARATION

Bagley Hall Electrical Mains will be shut off for couple of hours starting early morning of Monday, 19th Aug. In preparation all NMR systems will have to be shut down and revived after the maintenace work is complete on Monday.  Here are the points to note : NEO500 :  The last sample that is run […]

Posted in Hardware, Spectrometer, Usage | No Comments »

UPDATE ! ALL NMR SYSTEMS READY FOR USE

Calendar for 300-s are open now. NEOO500 automation queue has restarted.  Submit samples as convenient. NMR Facility

Posted in Hardware, Usage | No Comments »

UPDATE : AFTERMATH OF POWER DISRUPTION YESTERDAY

The systems are being revived and within next 30 minutes they should be ready of regular use.  The FTP server will also be reset as needed during this time.   The calendar will be blocked from reservation for the 30 min. approximately. We will post an update once everything is back to routine status. NMR Facility

Posted in NMR Facility Usage, Usage | No Comments »

GG500 – PLANNED MAINTENANCE , Jul. 1 Mon – IMPACT

For better part of the day on Jul. 1, Monday, the system will be down for hardware maintenance.  The automation queue will be stopped early in the morning that day.  Do not plan to queue any experiments from 8 AM. The Automation queue should resume from 5 PM latest, that day, but for unexpected contingencies. […]

Posted in Hardware, Spectrometer, Usage | No Comments »

UPDATE : GG500 – SWITCH TO MANUAL MODE LATER TODAY

Due to the HVAC radiator maintenance and asbestos mitigation of the NMR lab yesterday,  the automation queue could not be continued from 4.30 pm. The system will attempt to complete the pending queue before it is switched to Topspin direct login. NMR Facility 6/18/24

Posted in NMR Facility Usage, Spectrometer, Usage | No Comments »

UPDATE ! GG500 – READY FOR AUTOMATION RUN – PLEASE QUEUE UP SAMPLES

Few reminders : You can download your data via the FTP server link:  phoenix.chem.washington.edu/GG500. You can set the temperature you desire, from the Automation Window itself.   The software will check the target temperature before starting the run A cumulative maximum of 60 minutes per sample holder position will be treated as a ‘walk-on’ run and […]

Posted in Spectrometer, Usage | No Comments »

NOTE ! GG500 – WILL ENTER ICONNMR AUTOMATION TOMORROW – FRI 14TH

The Topspin ICONNMR interface will be deployed starting noon tomorrow i.e. Friday, the 14th.   It is very similar to the NEO500 interface.  Here are points that are unique to GG500. Access : The system will be in Full IconNMR Automation mode from Friday morning 10 AM of a given week and continue till 10 AM […]

Posted in Hardware, NMR Facility Usage, Software, Spectrometer, Usage | No Comments »

Item Categories

Archives