UW CHEMISTRY NMR

Announcments & Equipment Logs

July, 2024

GG500 : SYSTEM BACK TO NORMAL – ICON QUEUE RUNNING NOW

Following user input,  we checked and fixed any pending issues with ATMA Topshim Tested OK.  IconNMR queue has restarted. You can submit samples now. NMR Facility  

Posted in Hardware, Spectrometer | No Comments »

GG500 : ICONNMR AUTOMATION RUNNING.

You can queue up samples as before.  But, expect sporadic sample injection issues.  We are monitoring the system for further clues.  At this point, the system is returned to normal use. NMR Facility (contact : nmrissues@chem.washington.edu)

Posted in Hardware, Spectrometer | No Comments »

GG500 : AUTOMATION QUEUE STOPPED FOR MAINTENANCE

There were multiple instances of sample injection failure today.  We are testing the system and troubleshooting possible causes.  As a result, the  Automation queue is stopped. As of now we expect to resume the automation queue by 4 pm but this can change. Please consult the Reservation Page before you plan to come to the […]

Posted in Hardware, Spectrometer | No Comments »

REMINDER : PLEASE CLEANUP YOUR OLD SAMPLE TUBES

GG500 :   Please remove all the sample tubes that have already run your experiments,  by 1 PM latest, today.   Sample tubes left in the Carousel will be considered ‘abandoned’  and removed for disposal. NEO500 :  By 1 PM latest,  please remove all the sample tubes that have completed their run from the Carousel.   Remove ALL […]

Posted in NMR Facility Usage | No Comments »

GG500 – UPDATE ! AUTOMATION QUEUE RESTORED AND RECEIVING SAMPLES

An important hardware upgrade was completed today.  This should address the sproadically failing sample landing issues we noticed recently.   The vitals are all good and the system is shimmed up and ready.  The automation is queue is already running. Please submit samples at your convenience. NMR Facility (contact: nmrissues@chem.washington.edu)

Posted in NMR Facility Usage | No Comments »

UPDATE ! ALL NMR SYSTEMS READY FOR USE

Calendar for 300-s are open now. NEOO500 automation queue has restarted.  Submit samples as convenient. NMR Facility

Posted in Hardware, Usage | No Comments »

UPDATE : AFTERMATH OF POWER DISRUPTION YESTERDAY

The systems are being revived and within next 30 minutes they should be ready of regular use.  The FTP server will also be reset as needed during this time.   The calendar will be blocked from reservation for the 30 min. approximately. We will post an update once everything is back to routine status. NMR Facility

Posted in NMR Facility Usage, Usage | No Comments »

Item Categories

Archives