UW CHEMISTRY NMR
Announcments & Equipment Logs
October, 2024
UPDATE – GG500 : ICONNMR FULL WORKTAG ACCESS RESTORED
You should be able to see all the Worktags belonging to your Netid now, via a pull down menu. Please let us know, if you see otherwise. NMR Facility 10.30.24
Posted in NMR Facility Usage, Software, Spectrometer, Usage | No Comments »
NOTE – GG500 : PROBLEM ACCESSING MULTIPLE BUDGET TAGS
We are aware of the software glitch, that does not allow you to choose budget/Worktags from the pull down menu in the Automation window. It only displays the first Worktag from the list. We are working on a solution and will update once it is resolved. NMR Facility 10.30.24
Posted in Software, Spectrometer | No Comments »
UPDATE : NEO500 – SYSTEM ONLINE AFTER SOFTWARE MAINTENANCE
The computer system is upgraded along with the NMR software. The sporadic crash of Topspin noticed last week, should be gone with this upgrade. It will take a few minutes before the data appears in FTP server phoenix.chem.washington.edu You should also receive a completion email as well as a PDF snapshot of your spectrum upon […]
Posted in Hardware, Software, Spectrometer, Usage | No Comments »
ALERT ! GG500 – AUTOMATION QUEUE RESTORED FROM FAILED STATE
Based on feedback, a user might have tripped the red safety lever on the Carousel yesterday evening leading to an ‘abort’ state of the Automation queue. The queue has been restored this morning and reset to the first sample holder which encountered the failure. Please calibrate your expectations of finishing times for your samples submitted […]
Posted in Hardware, Spectrometer | No Comments »
UPDATE : GG500 – Selenium 77 TESTED OK
Some users had mentioned that 77Se is not working as expected, recently. It is tested to be running OK as of today. When you drive the instrument interactively, use the command phrase : rpar 77Se.amr all For additional convenience, we have a macro to do the above and setup the correct parameters. Just enter : […]
Posted in Software, Spectrometer, Usage | No Comments »
UPDATE ! AV300 – SYSTEM BACK TO NORMAL
We resolved the original issue that was related to Mains power supply to the whole console. We therefore don’t expect any functional changes in the system. But, do feel free to let us know if you observe anything abnormal. The instrument is open for reservation. NMR Facility 10/23/24
Posted in Hardware, Spectrometer | No Comments »
AV300 – UPDATE – WORK STILL IN PROGRESS
We have identified the failing part and trying to find a replacement for the same. Owing to the vintage of the instrument, it may take a while to get this done. Thank you for your patience. NMR Facility 10/21/24
Posted in Hardware, Spectrometer | No Comments »
UPDATE ! BOTH 500 SYSTEMS UP AND RUNNING
Along with AV301, we have NEO500 and GG500 revived fully and running. AV300 needs more work and we will keep you posted of the progress. NMR Facility
Posted in Hardware, Spectrometer | No Comments »
UPDATE ! BAGLEY 33/37 ELECTRICAL MAINTENANCE
The planned electrical maintenance has successfully concluded. Currently the av301 is available for use. I am still working on some issues with the av300 and GG500, and they will be released as soon as they are functioning as expected. The NEO500 should be ready for use tomorrow morning. -Adrienne
Posted in Uncategorized | No Comments »
ALERT : BAGLEY 33/37 ELECTRICAL MAINTENANCE
As you may have seen on the NMR reservation schedule, the main NMR Facility BAG 33/37 will be closed for operations starting Wednesday, October 16 at 16:00 (4:00 PM.) Electrical work requiring instrument shut down of the av300, av301, GG500, and NEO500 is scheduled for the early hours on Thursday, October 17. The av300, av301, […]
Posted in NMR Facility Usage | No Comments »