UW CHEMISTRY NMR

Announcments & Equipment Logs

NMR Facility Usage

UPDATE: NEO500 RELEASE WITH TBI PROBE

The NEO500 will be released today (Wednesday, April 9) at 1:00 PM with the TBI probe installed. CHANGE TO NORMAL USE: Because the TBI probe is a manual tune-and-match probe, all use of the NEO500 will be via reservation only. Please use the reservation page to book your time before using the instrument. TRAINING REQUIRED: […]

Posted in Hardware, NMR Facility Usage, Probeheads, Spectrometer | No Comments »

LATEST UPDATE ! GG500 and NEO500 – PLEASE NOTE

Dear Users This is the latest on both the 500 systems.  Please note and plan accordingly. GG500 GG500 will continue to serve you with the iProbe that has been in place.  This probe will NOT be removed right now. Until the Prodigy Probe is back to normal state,  GG500 will continuously operate on IconNMR Automation Mode, […]

Posted in NMR Facility Usage, Spectrometer, Usage | No Comments »

IMPORTANT NOTE : SAMPLE PREPARATION AND HEALTH OF THE NMR INSTRUMENTS

Dear Users The NMR instruments in our facility are not only expensive but they are result of years of  extensive R&D and exquisite engineering.   They are robust enough to tolerate quite a bit of abuse. But, there are limits to how much these versatile and delicate instrumentation can take and still keep functioning. These days […]

Posted in NMR Applications, NMR Facility Usage | No Comments »

NEO500 – HEADS UP : QUEUE WILL RESUME FROM 12 NOON

Users Automation queue is stopped for a planned maintenance/optimization routine.  Please plan to submit samples from 12 noon only.  Queue will be resumed by 12 noon today. REMINDER :  Always check the Reservation webpage for NEO500 and GG500 before you proceed to Room : 37, BAG for sample submission. Planned stoppages are always indicated on the […]

Posted in Datasets, NMR Facility Usage | No Comments »

FRIENDLY REMINDER : IconNMR HYGIENE – USER ID INTEGRITY

Users Please make sure that you are logged in as yourself into the IconNMR Automation session before you start submitting your sample. When you reach the Title/Originator Item field,  please cross check it is indeed your own Worktag that is selected for charging the time to.   Also, ensure that, in the Email field, your <netid@uw.edu> is […]

Posted in NMR Facility Usage, Uncategorized | No Comments »

NOTE : GG500 – READJUSTED SCHEDULE FOR THE HOLIDAYS THIS WEEK

The system will continue on Automation mode through the week and return to interactive session after the Thanksgiving longweekend i.e. on Monday, Dec.  2nd. System will be in interactive mode through next week and get back to the Automation routine on Dec. 6, Friday. NMR Facility 11.26.24

Posted in NMR Facility Usage, Spectrometer, Usage | No Comments »

UPDATE – GG500 : ICONNMR FULL WORKTAG ACCESS RESTORED

You should be able to see all the Worktags belonging to  your Netid now, via a pull down menu.  Please let us know, if you see otherwise. NMR Facility 10.30.24

Posted in NMR Facility Usage, Software, Spectrometer, Usage | No Comments »

ALERT : BAGLEY 33/37 ELECTRICAL MAINTENANCE

As you may have seen on the NMR reservation schedule, the main NMR Facility BAG 33/37 will be closed for operations starting Wednesday, October 16 at 16:00 (4:00 PM.) Electrical work requiring instrument shut down of the av300, av301, GG500, and NEO500 is scheduled for the early hours on Thursday, October 17. The av300, av301, […]

Posted in NMR Facility Usage | No Comments »

ALERT ! NEO500 – SYSTEM WILL BE OFFLINE FOR SOFTWARE UPGRADE

As part of ongoing computer and operating system upgrade, the system will be unavailable until 3 PM today.  If the configuration is completed before that, we will release the instrument for regular use immediately. Please take a moment to check your NEO500 Queue bookmark here, before proceeding to the lab with your samples.   We will […]

Posted in Hardware, NMR Facility Usage, Spectrometer | No Comments »

UPDATE ! NEO500 – System Queue will restart by 1 PM

After a minor intervention to get the probe ready for proper locking/shimming, the system will be released for regular use by 1 PM.    The noisy work performed by UW Facilities and Services at the corner of Rm.33 should also be complete by then. We will update once the system queue is resumed. NMR Facility 9/10/2024

Posted in Hardware, NMR Facility Usage, Spectrometer | No Comments »

Item Categories

Archives