UW CHEMISTRY NMR

Announcments & Equipment Logs

Hardware

ALERT ! NEO500 – SYSTEM WILL BE OFFLINE FOR SOFTWARE UPGRADE

As part of ongoing computer and operating system upgrade, the system will be unavailable until 3 PM today.  If the configuration is completed before that, we will release the instrument for regular use immediately. Please take a moment to check your NEO500 Queue bookmark here, before proceeding to the lab with your samples.   We will […]

Posted in Hardware, NMR Facility Usage, Spectrometer | No Comments »

UPDATE ! NEO500 – System Queue will restart by 1 PM

After a minor intervention to get the probe ready for proper locking/shimming, the system will be released for regular use by 1 PM.    The noisy work performed by UW Facilities and Services at the corner of Rm.33 should also be complete by then. We will update once the system queue is resumed. NMR Facility 9/10/2024

Posted in Hardware, NMR Facility Usage, Spectrometer | No Comments »

UPDATE ! GG500 – BACK ON TRACK

Ready to use !

Posted in Hardware, Spectrometer | No Comments »

UPDATE – NEO500 : SYSTEM WILL BE READY FOR REGULAR USE TOMORROW

Along with  preparing  the Prodigy cryoprobe for optimal performance, we will complete the scheduled cryogen services and release the instrument for regular use tomorrow,  by 12 noon, Tuesday, the 20th. NMR FACILITY 8/19/24

Posted in Hardware, Spectrometer | No Comments »

ALERT : BAGLEY HALL ELECTRICAL MAINTENANCE – PREPARATION

Bagley Hall Electrical Mains will be shut off for couple of hours starting early morning of Monday, 19th Aug. In preparation all NMR systems will have to be shut down and revived after the maintenace work is complete on Monday.  Here are the points to note : NEO500 :  The last sample that is run […]

Posted in Hardware, Spectrometer, Usage | No Comments »

GG500 : AUTOMATION QUEUE IS UP

Sorry for the unexpected delay.  Please queue up your samples.   We are aware of some sample injection issues that pops up randomly. We are working to address the same as soon as we can. NMR FACILITY

Posted in Hardware, Software, Spectrometer | No Comments »

GG500 : SYSTEM BACK TO NORMAL – ICON QUEUE RUNNING NOW

Following user input,  we checked and fixed any pending issues with ATMA Topshim Tested OK.  IconNMR queue has restarted. You can submit samples now. NMR Facility  

Posted in Hardware, Spectrometer | No Comments »

GG500 : ICONNMR AUTOMATION RUNNING.

You can queue up samples as before.  But, expect sporadic sample injection issues.  We are monitoring the system for further clues.  At this point, the system is returned to normal use. NMR Facility (contact : nmrissues@chem.washington.edu)

Posted in Hardware, Spectrometer | No Comments »

GG500 : AUTOMATION QUEUE STOPPED FOR MAINTENANCE

There were multiple instances of sample injection failure today.  We are testing the system and troubleshooting possible causes.  As a result, the  Automation queue is stopped. As of now we expect to resume the automation queue by 4 pm but this can change. Please consult the Reservation Page before you plan to come to the […]

Posted in Hardware, Spectrometer | No Comments »

UPDATE ! ALL NMR SYSTEMS READY FOR USE

Calendar for 300-s are open now. NEOO500 automation queue has restarted.  Submit samples as convenient. NMR Facility

Posted in Hardware, Usage | No Comments »

Item Categories

Archives