ALERT : BAGLEY HALL ELECTRICAL MAINTENANCE – PREPARATION

Bagley Hall Electrical Mains will be shut off for couple of hours starting early morning of Monday, 19th Aug. In preparation all NMR systems will have to be shut down and revived after the maintenace work is complete on Monday.  Here are the points to note : NEO500 :  The last sample that is run […]

Posted in Hardware, Spectrometer, Usage | No Comments »

GG500 : AUTOMATION QUEUE IS UP

Sorry for the unexpected delay.  Please queue up your samples.   We are aware of some sample injection issues that pops up randomly. We are working to address the same as soon as we can. NMR FACILITY

Posted in Hardware, Software, Spectrometer | No Comments »

GG500 – HEADS UP – QUEUE WILL STOP FROM 12 NOON TO 2 PM – SOFTWARE WORK

Please do not queue anything that will start acquisition at 12 noon.  Once the queue is restored, we will send another broadcast. NMR Facility

Posted in Software, Spectrometer | No Comments »

GG500 : SYSTEM BACK TO NORMAL – ICON QUEUE RUNNING NOW

Following user input,  we checked and fixed any pending issues with ATMA Topshim Tested OK.  IconNMR queue has restarted. You can submit samples now. NMR Facility  

Posted in Hardware, Spectrometer | No Comments »

GG500 : ICONNMR AUTOMATION RUNNING.

You can queue up samples as before.  But, expect sporadic sample injection issues.  We are monitoring the system for further clues.  At this point, the system is returned to normal use. NMR Facility (contact : nmrissues@chem.washington.edu)

Posted in Hardware, Spectrometer | No Comments »

GG500 : AUTOMATION QUEUE STOPPED FOR MAINTENANCE

There were multiple instances of sample injection failure today.  We are testing the system and troubleshooting possible causes.  As a result, the  Automation queue is stopped. As of now we expect to resume the automation queue by 4 pm but this can change. Please consult the Reservation Page before you plan to come to the […]

Posted in Hardware, Spectrometer | No Comments »

UPDATE ! ALL NMR SYSTEMS READY FOR USE

Calendar for 300-s are open now. NEOO500 automation queue has restarted.  Submit samples as convenient. NMR Facility

Posted in Hardware, Usage | No Comments »

UPDATE : AFTERMATH OF POWER DISRUPTION YESTERDAY

The systems are being revived and within next 30 minutes they should be ready of regular use.  The FTP server will also be reset as needed during this time.   The calendar will be blocked from reservation for the 30 min. approximately. We will post an update once everything is back to routine status. NMR Facility

Posted in NMR Facility Usage, Usage | No Comments »

GG500 – PLANNED MAINTENANCE , Jul. 1 Mon – IMPACT

For better part of the day on Jul. 1, Monday, the system will be down for hardware maintenance.  The automation queue will be stopped early in the morning that day.  Do not plan to queue any experiments from 8 AM. The Automation queue should resume from 5 PM latest, that day, but for unexpected contingencies. […]

Posted in Hardware, Spectrometer, Usage | No Comments »

UPDATE : GG500 – SWITCH TO MANUAL MODE LATER TODAY

Due to the HVAC radiator maintenance and asbestos mitigation of the NMR lab yesterday,  the automation queue could not be continued from 4.30 pm. The system will attempt to complete the pending queue before it is switched to Topspin direct login. NMR Facility 6/18/24

Posted in NMR Facility Usage, Spectrometer, Usage | No Comments »