ALERT : DRX499 – PROBE CHANGE EVENT – 16th Oct ’15
The currently installed TXO 19F {1H,13C} probehead will be replaced by the BBO – X{1H} Z gradient broad band probe beginning 16th October, Friday. The DRX499 needs considerably more time to prime the shims and so the system will be ready for regular operation on Monday, the 19th. We will keep you informed of […]
Posted in Hardware, Spectrometer | No Comments
AV301 : FOLLOWING UP….
I want to highlight the optimized state of the TXD probe by showing you a representative 1H spectrum view below. This should encourage users to feel confident about the results of our optimization efforts and hopefully users can reap the full benefits that AV301 has to offer. The full 1H spectrum shown here is from […]
Posted in Spectrometer, Usage | No Comments
ALERT ! AV301 – UPDATE – SYSTEM IS READY FOR USE
The TXD – 13C {1H,19F} probe has been shimmed up and ready for regular use. The purported hardware issue in the amplifier reported earlier is also resolved now. I thank all the users for their patience and cooperation while the instrument was out of service for priming up the probe. NMR Facility Manager 9/24/15
Posted in Uncategorized | No Comments
UPDATE ! : PNEUMATICS BACK TO NORMAL – ALL SYSTEMS OK
Sample handling is normal. Please let the facility staff know or post a log book entry, if you notice anything out of the ordinary. NMR Facility Manager 9/18/15
Posted in Hardware, Spectrometer | No Comments
ALERT ! – HOUSE AIR SUPPLY PROBLEM
We are aware of the drop in house air pressure that is leading to sample handling failure in all but the AV500 instrument. The problem is identified to be a failed tubing connection to the buffer tank supplying all the three instruments. Attempts are being made to fix this as soon as possible and updates […]
Posted in Hardware, Spectrometer, Usage | No Comments
AV301 : UPDATE – SYSTEM USABLE BUT WORK NEEDS TO BE DONE WITH SHIMS
A damaged insert glass had caused problems leading to (a) in-correct sample landing (b) difficulty in shimming. The broken glass itself makes shimming difficult but this problem is exacerbated greatly if the sample doesn’t land fully. Users are reminded that before you go 60 mph, make sure that the sample ‘Down’ button is lit up […]
Posted in Hardware, Spectrometer | No Comments
AV301 : TXD PROBE IN – SYSTEM IS READY FOR REGULAR USE
Please let us know if you see anything that is out of the ordinary. Also Note : THIS PROBE DOES NOT HAVE AUTOMATIC TUNING AND MATCHING. You have to tune/match by running the wobb command as with other instruments.
Posted in Uncategorized | No Comments
ALERT ! – AV301 – UPDATE ON CURRENT CONDITION
With due apologies for the delay in this update, I would like to summarize the current condition of the instrument AV301 A problem with the 1H high power amplifier has been identified. We have come up with a temporary work around to make the instrument usable while a permanent fix is being worked out. The […]
Posted in Hardware, Spectrometer, Usage | No Comments
UPDATE : NMR DATA SERVER FUNCTIONAL
Following the power outage over the weekend, the NMR data server phoenix has been restored to normalcy. If you are still unable to access NMR data, please let us know.
Posted in Hardware, Spectrometer | No Comments
Alert: NMR Facility available after power outtage
According to UW Alerts, the UW lost power about 11 am this morning and it was returned by 1 pm. As of the posting of this announcement, the instruments in BAG 37, the av300, av301, av500, and drx499 are currently operating normally. If there is another power outtage due to weather or a tree branch, […]
Posted in Spectrometer | No Comments