UW CHEMISTRY NMR

Announcments & Equipment Logs

September, 2024

REMINDER ! NEO500 – PLEASE CLEANUP ALL YOUR USED SAMPLE TUBES

Before the day is through, at the least, please pick up all your used samples that are sitting in the buffer rack.   Help us keep the NMR space clean and user friendly. Thank you NMR Facility 9.20.24

Posted in Spectrometer, Usage | No Comments »

UPDATE ! GG500 – SAMPLECASE ROBOT IS FIXED – SYSTEM BACK ON TRACK

The reservation calendar is open for blocking time.  After painstaking reconfiguration and adjustment of the automation robot, it is passing the rigorous tests flawlessly.   We hope we have seen the end of the ‘intermittent sample injection failure’ issues.   But,  let us emphasize one thing.  The mechanical corrections/adjustments we had to make to bring the […]

Posted in Hardware, Spectrometer | No Comments »

UPDATE ! NEO500 – BACK ON LINE AND RUNNING SAMPLES

You can start submitting samples, but note the following points : The Web interface page that shows the queue status, is not ON yet but will be revived momentarily. The email feature that sends you PDF files, is dealyed a bit but should be back online, latest by tomorrow. Thank you for your patience and […]

Posted in Spectrometer, Usage | No Comments »

ALERT ! GG500 : SAMPLE HANDLING ISSUE BEING INVESTIGATED

Users You might have noticed that the instrument is blocked off tomorrow for ‘hardware optimization’ and in fact, the primary task at that time will be addressing the intermittent sample landing failure. Notwithstanding that plan, we are right now trying to see if we can provide a workaround to this problem and get the queue […]

Posted in Hardware, Spectrometer | No Comments »

ALERT ! NEO500 – SYSTEM WILL BE OFFLINE FOR SOFTWARE UPGRADE

As part of ongoing computer and operating system upgrade, the system will be unavailable until 3 PM today.  If the configuration is completed before that, we will release the instrument for regular use immediately. Please take a moment to check your NEO500 Queue bookmark here, before proceeding to the lab with your samples.   We will […]

Posted in Hardware, NMR Facility Usage, Spectrometer | No Comments »

UPDATE ! NEO500 – Queue restarted

If you do not see your sample that failed this morning in the reactivated queue, please resubmit the same. Click to access the queue log from here. NMR Facility 9.10.24

Posted in Uncategorized | No Comments »

UPDATE ! NEO500 – System Queue will restart by 1 PM

After a minor intervention to get the probe ready for proper locking/shimming, the system will be released for regular use by 1 PM.    The noisy work performed by UW Facilities and Services at the corner of Rm.33 should also be complete by then. We will update once the system queue is resumed. NMR Facility 9/10/2024

Posted in Hardware, NMR Facility Usage, Spectrometer | No Comments »

GG500 : Automatic Mailing of Completion status and PDF copy – restored

There was some delay owing to migration of the mail server that was sending notifications as well PDF copy of spectra from IconNMR, in the past. This functionality is restored and it is tested to be OK.   You should auotmaically get an email that looks something like this.  (The sender will be gg500nmr@uw.edu). This feature […]

Posted in Datasets, Host Computer, Operating System | No Comments »

Item Categories

Archives