ALERT ! AV300 – IMMINENT PROBE CHANGE

The ATMA probe is seen to have issues while tuning/matching the 1H channel.  All symptoms point to the necessity for the probe to be pulled out and serviced, soon.  I am giving the heads up now that this probe might come out at a short notice on one of the days this week and a […]

Posted in Hardware, Spectrometer, Usage | No Comments »

UPDATE ! AV500 – SYSTEM WILL BE UNUSABLE FOR NOW

Faulty channel 3 is not yet operational and available options are being explored.  If a part replacement is on the cards, we may have to wait a few days. In such an eventuality, I will release the instrument with the caveat that we have to shim the sample by hand, as in good old days. […]

Posted in Hardware, Spectrometer | No Comments »

ALERT ! AV500 – SYSTEM NOT FULLY FUNCTIONAL

An issue with the 3rd RF channel is being looked into. Without this channel, Topshim will not work.  I am hoping that its a quick fix. If not, I will give you an update. Stay tuned. NMR Facility Manager 9/18/17

Posted in Hardware, Spectrometer | No Comments »

ALERT ! ALL NMR SYSTEMS RESET AFTER POSSIBLE POWER DISRUPTION

Though I haven’t heard of specific reports, all the NMR consoles in Rm:37 evidently underwent some voltage fluctuation, possibly anytime over the weekend. All the log posts of today morning are related to this.  The systems have been reset to their usable condition now. NMR Facility Manager 9/18/2017

Posted in Hardware, Spectrometer | No Comments »

UPDATE – DRX499 – LOCK SYSTEM IS RESET

I have checked that the locking on CDCl3 as well as other solvents is functioning as expected. Nevertheless, do post a message in the log if you notice otherwise, especially with non-standard solvents. NMR Facility Manager 9/6/17

Posted in Hardware, Spectrometer | No Comments »

ALERT ! SYSTEMS RESTORED – AFTER POWER FLUCTUATION

The apparent Lock anomaly noted with AV300 has also been found with AV301 and possibly DRX499.  Apparent line voltage fluctuations were reported today and similar to last week, that could be cause of the Lock disruption.  The 300-s are restored to normal operation as we speak and I am checking that DRX499 is functioning as […]

Posted in Hardware, Spectrometer | No Comments »

UPDATE ! AV500 IS ALSO READY FOR USE

Reservation calendar is released for AV500 also.  The charges for unused time during the window of instrument revival, will be waived for all users who might have made reservations earlier. NMR Facility Manager 8/31/17

Posted in Hardware, Spectrometer | No Comments »

UPDATE – NMR SYSTEMS ! – 3 UP ; 1 TO GO

Following consoles are up and running : AV300 AV301 DRX499 I will post further update once AV500 is on line. NOTE :  During the process of revival, there were voltage fluctuations several times today.  Until this issue is fully resolved campus wide, it is possible that the systems may fail to operate once again, in the […]

Posted in Hardware, Spectrometer | No Comments »

ALERT ! ALL SYSTEMS AFFECTED DUE TO BRIEF POWER FAILURE

None of the instruments in Rm:37 are usable as we speak, due to a power interruption that occurred today morning around 9 am approx.  I will post a follow up message once all the instruments are revived. Until that time the reservation calendar will be disabled for fresh bookings. NMR Facility Manager 8/31/2017

Posted in Hardware, Spectrometer | No Comments »

UPDATE ! AV301 – PROBE IS SHIMMED UP AND READY

The MANUAL BBO PROBE is ready for use.  Please use “rsh stdbbo” to start from a reliable shim set before you shim up on your own. NOTE :  THIS PROBE CANNOT DO TOPSHIM OR ATMA.  Both ‘wobb’ and shimming should be done manually. Please get in touch if you need help or clarification NMR Facility […]

Posted in Hardware, Spectrometer, Usage | No Comments »