UW CHEMISTRY NMR
Announcments & Equipment Logs
Spectrometer
UPDATE – NEO500 : SYSTEM WILL BE READY FOR REGULAR USE TOMORROW
Along with preparing the Prodigy cryoprobe for optimal performance, we will complete the scheduled cryogen services and release the instrument for regular use tomorrow, by 12 noon, Tuesday, the 20th. NMR FACILITY 8/19/24
Posted in Hardware, Spectrometer | No Comments »
UPDATE : NMR SYSTEMS STATUS – PLEASE NOTE.
The 300 NMR-s and GG500 will be available for regular use from 12 NOON. NEO500 should come on line late afternoon; please wait for confirmation that the Automation queue is up again before proceeding. If anything changes, we will post an update asap via this portal. NMR Facility 8/19/24
Posted in Spectrometer, Usage | No Comments »
ALERT : BAGLEY HALL ELECTRICAL MAINTENANCE – PREPARATION
Bagley Hall Electrical Mains will be shut off for couple of hours starting early morning of Monday, 19th Aug. In preparation all NMR systems will have to be shut down and revived after the maintenace work is complete on Monday. Here are the points to note : NEO500 : The last sample that is run […]
Posted in Hardware, Spectrometer, Usage | No Comments »
GG500 : AUTOMATION QUEUE IS UP
Sorry for the unexpected delay. Please queue up your samples. We are aware of some sample injection issues that pops up randomly. We are working to address the same as soon as we can. NMR FACILITY
Posted in Hardware, Software, Spectrometer | No Comments »
GG500 – HEADS UP – QUEUE WILL STOP FROM 12 NOON TO 2 PM – SOFTWARE WORK
Please do not queue anything that will start acquisition at 12 noon. Once the queue is restored, we will send another broadcast. NMR Facility
Posted in Software, Spectrometer | No Comments »
GG500 : SYSTEM BACK TO NORMAL – ICON QUEUE RUNNING NOW
Following user input, we checked and fixed any pending issues with ATMA Topshim Tested OK. IconNMR queue has restarted. You can submit samples now. NMR Facility
Posted in Hardware, Spectrometer | No Comments »
GG500 : ICONNMR AUTOMATION RUNNING.
You can queue up samples as before. But, expect sporadic sample injection issues. We are monitoring the system for further clues. At this point, the system is returned to normal use. NMR Facility (contact : nmrissues@chem.washington.edu)
Posted in Hardware, Spectrometer | No Comments »
GG500 : AUTOMATION QUEUE STOPPED FOR MAINTENANCE
There were multiple instances of sample injection failure today. We are testing the system and troubleshooting possible causes. As a result, the Automation queue is stopped. As of now we expect to resume the automation queue by 4 pm but this can change. Please consult the Reservation Page before you plan to come to the […]
Posted in Hardware, Spectrometer | No Comments »
UPDATE ! ALL NMR SYSTEMS READY FOR USE
Calendar for 300-s are open now. NEOO500 automation queue has restarted. Submit samples as convenient. NMR Facility
Posted in Hardware, Usage | No Comments »
UPDATE : AFTERMATH OF POWER DISRUPTION YESTERDAY
The systems are being revived and within next 30 minutes they should be ready of regular use. The FTP server will also be reset as needed during this time. The calendar will be blocked from reservation for the 30 min. approximately. We will post an update once everything is back to routine status. NMR Facility
Posted in NMR Facility Usage, Usage | No Comments »