UW CHEMISTRY NMR

Announcments & Equipment Logs

UPDATE ! GG500 – READY FOR AUTOMATION RUN – PLEASE QUEUE UP SAMPLES

Few reminders : You can download your data via the FTP server link:  phoenix.chem.washington.edu/GG500. You can set the temperature you desire, from the Automation Window itself.   The software will check the target temperature before starting the run A cumulative maximum of 60 minutes per sample holder position will be treated as a ‘walk-on’ run and […]

Posted in Spectrometer, Usage | No Comments

NOTE ! GG500 – WILL ENTER ICONNMR AUTOMATION TOMORROW – FRI 14TH

The Topspin ICONNMR interface will be deployed starting noon tomorrow i.e. Friday, the 14th.   It is very similar to the NEO500 interface.  Here are points that are unique to GG500. Access : The system will be in Full IconNMR Automation mode from Friday morning 10 AM of a given week and continue till 10 AM […]

Posted in Hardware, NMR Facility Usage, Software, Spectrometer, Usage | No Comments

UPDATE : NEO500 – READY FOR USE

The queue is started.  Please line up samples. NMR Facility

Posted in Spectrometer, Usage | No Comments

UPDATE : PHOENIX FTP SERVER ONLINE

All files are downloadable.  Please let us know, otherwise. NMR Facility (contact:  amr0311@uw.edu; rajanp@uw.edu)

Posted in Datasets | No Comments

UPDATE : ALL SYSTEMS (EXCEPT NEO500) READY FOR USE

As mentioned previously,  NEO500 and Prodigy probe will be ready to accept samples in Automation queue by noon tomorrow i.e. Tuesday, the 11th. All other systems are ready for immediate use. NMR Facility (contact : amr0311@uw.edu; rajanp@uw.edu)

Posted in NMR Facility Usage | No Comments

ALERT ! BAGLEY ELECTRICAL SHUTDOWN ON MONDAY – IMPACTS

Approximately by evening of Sunday, 9th June,  all NMR instruments will be powered down, in anticipation of an early morning electrical disruption next day i.e. Monday. All instruments, except the NEO500 with Prodigy Cryoprobe should be revived by noon on Monday, the latest. NEO500 will be released for regular use by Tuesday, 11th, morning. Please […]

Posted in NMR Facility Usage | No Comments

GG500 : SYSTEM READY FOR USE – SAMPLE TUBE BREAKAGE FIXED

Based on what we observed,  a sample tube broke while a user loaded the sample with spinner into the Carousel.  This triggered an error condition of the Sample Robot. PLEASE PAY ATTENTION : With the Automation Hardware in place, we have reduced the physical human interaction with NMR machine to just a single step :  […]

Posted in Hardware, Spectrometer | No Comments

ALERT : GG500 – SAMPLE CHANGER ERROR

We are looking into the sample changer issue and will post an update as soon as it is resolved. NMR Services Manager 6/5/2024

Posted in Hardware, Spectrometer | No Comments

NEO500 USAGE PRACTICE – REMINDER

Like all instruments, NEO500 also has a walk-on usage policy where the software allows only a maximum of 60 minutes time during the day for a given sample.  The software automatically queues longer experiments to so-called ‘Night Mode’ and runs them overnight. We are hearing  that some users are stepping around this limitation by programming […]

Posted in Spectrometer, Usage | No Comments

GG500 : FUNCTIONING NORMALLY

A software glitch was reported over the weekend and it has been resolved.  Instrument is functioning normally. NMR Services Manager 5/6/24

Posted in Software | No Comments

Item Categories

Archives