UW CHEMISTRY NMR
Announcments & Equipment Logs
DRX499 : ALERT – PROBE CHANGE TOMORROW
The currently installed BBI probe with a malfunction needs to be sent for repairs. By tomorrow afternoon this probe will be pulled out and the backup triple resonance 1H-{13C, 15N} probe will be put in place and primed. The replacement probe should be ready by noon on Monday, the 28th Oct ’13. Users are requested […]
Posted in Hardware, Spectrometer | No Comments
ALERT : AV700 – PROBE CHANGE
The current solutions probe will give way to the 3.2 mm Solid State MAS probe on 28th October, 2013, Monday. Solution NMR users are requested to take note and plan their runs accordingly.
Posted in Hardware, Spectrometer | No Comments
DRX499 : ALERT – BBI PROBE HANDICAP
Some of the capacitors inside the BBI probe are de-rating and this leads to the following behavior. Whenever a gradient based experiment is performed, the pulse gradients affect the tuning and matching of the probe such that the wobb curve will be way off at the end of the experiment, leading to poor or no […]
Posted in Hardware, Spectrometer, Usage | No Comments
AV301 : UPDATE – 1H {19F, 13C} probe ready for use
Please remember to load the standard shim file stdtxd before you begin shimming. Pay attention to the fact that the RF cable should be switched from the 13C connector on the probe to 19F connector, when you perform 19F direct detection. Please leave the cable back in 13C position once you are done. Contact facility […]
Posted in Hardware, Spectrometer, Usage | No Comments
ALERT : AV301 – PROBE CHANGE
The currently serving double resonance 1H {13C} backup probe in AV301 will give way to the TXD-1H{19F,13C} probe, beginning Oct. 21st, Monday. The probe is expected to be ready before noon. Users are requested to note the change.
Posted in Hardware, Spectrometer, Usage | No Comments
ALERT ! : SMART CARD ENTRY SYSTEM TO THE NMR LAB
All of us who have been watching the progress made with the new smart card key hardware installation might be wondering, when, what and how. I wanted to share what I know thus far. Once the smart card entry system is ready in a day or two, apparently, all those users who already have metal […]
Posted in Usage | No Comments
UPDATE : AV301 – SYSTEM READY FOR USE
The double resonance probe DUL-1H{13C} is installed currently and the instrument is ready for use. The compromised 19F probe is being attended to, in the meanwhile. Users can start reserving time as usual.
Posted in Spectrometer, Usage | No Comments