Malone,S. WA-RD 602.1 Information Tools to Improve Post-Earthquake Prioritization of WSDOT Bridge Inspections 2005 TRAC/UW
Abstract:
University of Washington researchers developed information tools to increase the speed and efficiency of Washington State Department of Transportation (WSDOT) post-earthquake response and recovery efforts. The researchers upgraded the Pacific Northwest Seismograph Network (PNSN) ground-motion processing software to rapidly generate and disseminate "ShakeMaps," which are maps of earthquake intensity. The researchers also implemented two procedures to estimate the likelihood of slight (or greater) bridge damage; these procedures are based on the intensity of earthquake shaking (obtained from the ShakeMaps) and on each bridge's location, year of construction, and bridge type (obtained from the Washington State Bridge Inventory). The first procedure, developed at the University of Washington, is based on observations of bridge damage from the 2001 Nisqually earthquake. The second procedure is contained in the Federal Emergency Management Agency HAZUS software for predicting the lowest level of damage. Shortly following an earthquake, e-mail and pager alert messages will be sent to WSDOT personnel notifying them of the preliminary earthquake magnitude and epicenter. ShakeMaps and a prioritized list of bridges (ranked by likelihood of bridge damage) will be available on a Web server at the University of Washington and will be pushed to a WSDOT FTP server.

Authors:
Malone,S., Eberhard,M. O., LaBelle,J., Ranf,T.

Keywords:
bridges, damage, earthquakes, fragilities, inspection, ShakeMap, Washington, speed, Washington state, transportation, WSDOT, software, earthquake, bridge, construction, management


Download Report:
External Links:
http://www.wsdot.wa.gov/research/reports/fullreports/602.1.pdf http://wsdot.wa.gov/Research/Reports/600/602.1.htm
Kopf,J. WA-RD 606.1 ATIS Evaluation Framework 2005 TRAC/UW
Abstract:
This report documents the results of five Advanced Traveler Information System (ATIS) project evaluations performed for the Washington State Department of Transportation. The projects encompass a range of devices in both urban and rural environments. Guidelines and lessons learned for planning and operating ATIS programs were then developed from the evaluation results. These observations were clustered into common themes in the areas of maintenance, rural projects, project management, staffing, training, support, and customer response. As part of this effort, a standardized evaluation approach for ATIS projects was developed. The approach was designed to focus on technical, management, and organizational lessons learned. The method was effective in producing useful information about ATIS benefits and deployment issues. Using that approach, an additional nineteen required ATIS evaluations will be performed in a second project phase. The additional evaluations will also provide an opportunity to further verify and strengthen the initial lessons learned, as well as to expand the method.

Authors:
Kopf,J., Nee,J., Ishimaru,J. M., Hallenbeck,M. E.

Keywords:
advanced traveler information systems, ATIS, benefit, benefits, environment, evaluation, framework, Intelligent transportation system, ITS, maintenance, management, planning, program, project evaluation, project management, rural, training, transportation, traveler information, urban, Washington, Washington state


Download Report:
External Links:
http://www.wsdot.wa.gov/research/reports/fullreports/606.1.pdf http://wsdot.wa.gov/Research/Reports/600/606.1.htm
Hill,K. WA-RD 621.1 Roadside Vegetation Management Study: Literature Review, Interview Summaries, and Decision Framework 2005 TRAC/UW
Abstract:
This study was conducted for the Washington State Department of Transportation (WSDOT) to explore both the need for and the variety of alternatives to the use of an annual application of herbicides for removing vegetation in the area immediately adjacent to the pavement edge. Our study approached these questions in two different ways, developing both a literature review and a set of interviews with people who have specific knowledge or views of these issues. We conducted interviews with three groups of people to identify issues, maintenance alternatives, and significant literature references: (1) staff at other federal, state, and county transportation agencies, (2) staff and volunteers who work with advocacy groups, and (3) researchers at academic institutions who specialize in related areas. Our literature review contains a set of citations that present related management issues and alternative practices. The abstracts for these references were included when available. To summarize what we learned from the interviews and literature sources, we developed a decision framework that could be used to guide WSDOT district maintenance staff in formulating management plans for vegetation. The decision framework differs from current practice primarily in that it begins with the assumption that maintenance of the area immediately adjacent to the pavement is not necessary unless some particular, observable condition triggers the need for such maintenance.

Authors:
Hill,K., Horner,R. R.

Keywords:
agencies, Alternative, Annual, best practices, condition, counties, developed, environmental management, framework, group, herbicides, integrated vegetation management (IVM), interviews, Issues, maintenance, management, pavement, pavement edge, research, review, road ecology, roadside, roadside maintenance, roadside vegetation, Study, transportation, vegetation management, Washington, Washington state, weeds, WSDOT, Zone 1


Download Report:
External Links:
http://www.wsdot.wa.gov/research/reports/fullreports/621.1.pdf http://wsdot.wa.gov/Research/Reports/600/621.1.htm
Li, J. WA-RD 588.1 Application of HDM-4 in the WSDOT Highway System 2004 TRAC/UW
Abstract:
This project performed extensive study and systematic research on the application of the Highway Development and Management system (HDM-4) to the Washington State Department of Transportation (WSDOT) highway system. Data processing, testing, calibration, and analysis were executed to provide the WSDOT with a new budget planning tool. HDM-4 flexible pavement deterioration models were calibrated with the assistance of the Washington State Pavement Management System. A method to calibrate concrete pavement distress models is proposed. This research also explored the application of HDM-4 analysis at the project, program, and strategic levels. The applications include prediction of pavement conditions during a defined analysis period, calculation of required budgets for optimal pavement conditions and maximum economic indicators, establishment of optimized work programs under varying levels of constrained budgets, and other applications for WSDOT.

Authors:
Li, J., Muench, S.T., Mahoney, J.P., Pierce, L., Sivaneswaran, N.

Keywords:
HDM-4, models, pavement maintenance, pavement management, pavement performance, Pavement preservation, vehicle operating costs, research, highway, development, management, management system, Washington, Washington state, transportation, WSDOT, data, calibration, analysis, planning, pavement, deterioration, concrete, program, applications, prediction, condition, indicators


Download Report:
External Links:
http://www.wsdot.wa.gov/research/reports/fullreports/588.1.pdf http://wsdot.wa.gov/Research/Reports/500/588.1.htm
Avery,R. P. WA-RD 563.1 Central Puget Sound Freeway Network Usage and Performance, 2001 Update 2003 TRAC/UW
Abstract:
This summary report presents an overview of the level of traveler usage (e.g., how many vehicles use the freeways) and travel performance (e.g., how fast they are traveling, where and how often congestion ocurs) on the principal urban freeways in the central Puget Sound area. The freeways studied in this project are managed by the Washington State Department of Transportation (WSDOT) using its FLOW system, a coordinated network of traffic monitoring, measuring, information dissemination, and control devices that operates on urban state and Interstate highways in the central Puget Sound region. Data presented in this report were collected by the WSDOT's freeway surveillance system. The project that led to this report is intended to meet two separate purposes: 1) to enhance WSDOT's ability to monitor and improve its traffic management efforts on Seattle-area highways, and 2) to provide useful information to the public and decision makers about the status of the freeway system's operational performance. This report is primarily intended to meet the second of these objectives. However, the software developed to assist in freeway data analysis for this project and many of the graphics presented in this report are directly applicable to the first objective.

Authors:
Avery,R. P., Ishimaru,J. M., Nee,J., Hallenbeck,M. E.

Keywords:
analysis, Archived Data User Services (ADUS), congestion, congestion monitoring, control, data, flow, freeway, freeway performance, highway, information dissemination, ITS, management, monitoring, performance, public, research, surveillance, traffic, traffic management, traffic monitoring, transportation, urban, Washington, Washington state, WSDOT


Download Report:
External Links:
http://www.wsdot.wa.gov/research/reports/fullreports/563.1.pdf http://wsdot.wa.gov/Research/Reports/500/563.1.htm
Ishimaru,J. M. WA-RD 555.1 North Seattle Advanced Traffic Management System (NSATMS) Project Evaluation 2002 TRAC/UW
Abstract:
This report documents the findings of the evaluation of the North Seattle Advanced Traffic Management System (NSATMS) Project. The evaluation was originally designed to analyze the potential transportation benefits and costs of a regional arterial traffic data sharing system that would obtain traffic signal system information (volumes, signal timing plans, etc.) from participating agencies and then share the data among those agencies. The operational goal was to allow each agency to make better control decisions by providing it with real-time knowledge of traffic conditions outside of its own control system boundaries. Because of a series of technical and project management issues, the system as originally envisioned was not successfully implemented. As a result, this evaluation does not include an analysis of direct operational benefits. It does, however, include a discussion of the expected institutional benefits, as well as an extensive "lessons learned" section based on the project team's review of the NSATMS effort. Of particular note were the importance of effective and ongoing lines of project communication, and the critical need to properly evaluate the fundamental nature of the project and provide a well-matched project management structure. The lessons learned from this project provide instructive guidelines for those who are contemplating future ITS system development efforts of comparable scope and complexity. Despite the limited successes of the NSATMS effort, the evaluation team found continued support for the regional arterial ATMS concept within the Puget Sound region. Follow-on research that contributes to a better understanding of the benefits, costs, and technical requirements of an arterial traffic management system is desired by many of the project participants.

Authors:
Ishimaru,J. M., Hallenbeck,M. E.

Keywords:
intelligent transportation systems, advanced traffic management systems, arterial signal control systems, traffic control strategies, Archived Data User Services (ADUS), data sharing, evaluation, seattle, advanced traffic management systems, traffic, traffic management, management, management system, transportation, transportation benefit, benefits, benefit, costs, cost, arterial, traffic data, data, volume, control, condition, ITS, project management, analysis, line, development, ATMS, research


Download Report:
External Links:
http://www.wsdot.wa.gov/research/reports/fullreports/555.1.pdf http://wsdot.wa.gov/Research/Reports/500/555.1.htm
Lomax, T. Traffic Congestion and Travel Reliability: How Bad Is the Situation and What Is Being Done About It? 2001 TRAC/UW / TTI
Mahoney, J.P. WA-RD 487.1 Summary Report On The State Pavement Technology Consortium 2000 TRAC/UW
Abstract:
This report documents the first year results of a pooled fund study among four states (California, Minnesota, Texas, and Washington State) and describes the structure and objectives. The planned continuation of this collaboration during the next two years is described. The pooled fund project established a working relationship among the four State DOT organizations. Under this agreement, each state allocated funding to allow selected DOT personnel and university researchers to participate in a series of technical meetings. Washington acted as the lead state for this pooled fund project, and produced the minutes and other documentation.Four technical meetings were held between July 1999 and January 2000, one in each of the four participating states. The general format for these meetings included presentations from the host DOT and associated research institutions, followed by specific topics of common interest to the four states. The four states quickly identified topics of mutual interest via this process. To provide the ability to study these topics and those identified in the future, the State DOT research managers agreed to establish a management framework to continue information sharing, to plan funding commitments and assure proper oversight and management of the collaborative studies.described.

Authors:
Mahoney, J.P., Pietz, M.D., Anderson, K.W.

Keywords:
California, Consortium, framework, management, Meeting, Minnesota, objectives, pavement, project, research, Study, technology, Texas, Washington, Washington state


Download Report:
Baker, M.J. WA-RD 437.1 Identification And Assessment Of Superior And Inferior Performing WSDOT Pavements 2000 TRAC/UW
Abstract:
The Washington State Pavement Management System (WSPMS) offers an organized methodology that WSDOT decision makers use to determine optimum strategies for providing and maintaining pavements in a serviceable condition over a given period of time. It also helps improve decision-making efficiency, provide feedback on the consequences of decisions, and ensure the consistency of decisions made at different management levels within WSDOT. Unfortunately, it is not possible, by simply scanning the WSPMS, to pinpoint reasons why pavement sections made of the same general surface materials and subjected to similar traffic and climatic conditions differ in performance. What the WSPMS can do is assist engineers in developing a candidate list of pavement sections with superior and inferior performance. Common characteristics that linkmultiple pavement sections are of particular interest, in part because they may reflect a common practice(e-g., nighttime construction) that leads to superior or inferior performance.This study undertook various extensive analyses and comparisons to help illustrate common attributes of Washington state pavements with superior and inferior performance. The research also reviewed field performance data for Interstate 90 within the 1999 version of the WSPMS. The purpose was to examine all pavement segments on the 480 km of Interstate 90 within Washington state.Reducing variability will allow WSDOT to produce more consistent pavement performance and will allow increasingly effective planning and forecasting. An almost certain byproduct of this increased planning effectiveness will be a more efficient allocation of available funding.

Authors:
Baker, M.J., Mahoney, J.P.

Keywords:
Assessment, condition, construction, data, effectiveness, forecasting, management, management system, materials, methodology, pavement, pavement management, pavement performance, pavement section, pavements, performance, planning, research, superior inferior, System, traffic, Washington, Washington state, WSDOT


Download Report:
Weston,R. F. WA-RD 364.2 Washington Integrated Networked Geo-Based System (Wings) Implementation Plan 1994
Abstract:
The purpose of this study is to provide the Washington State Department of Transportation, Aviation Division (WSDOT/AD) with the broad-based vision needed to apply new and emerging technology in geographic information systems (GIS) to aviation planning and reporting systems.The purpose of this study is to provide the Washington State Department of Transportation, Aviatior Division with the broad-based vision needed to apply new and emerging technology ir geographic information systems to aviation planning and systems. This is the second two reports. report documented the user needs, established data and application priorities, and presented a conceptual design for sharing geographic information pertaining to Washington\'s airports with airport sponsors, the Aviation Administration (FAA), and other WSDOT divisions. report provides an implementation plan. This report builds upon the conceptual design to provide a broad-based implementation plan. Three implementation activities are described in phases. Project organization and staffing requirements for policy, management, technical operations, and technical support are discussed in Section 3. Section 4 addresses the estimated resource requirements for WSDOT to make the implementation of WINGS a success. Included are requirements for personnel, data conversion from a manual to a computer-based system, and hardware. The of the report discusses issues and what next steps are required to begin the implementation of WINGS.

Authors:
Weston,R. F., Sandersen,J., Walker,L. A., Middleton,R.

Keywords:
airports, aviation, aviation planning, data, design, geographic information system, geographic information systems, GIS, implementation plan, information systems, management, manual, planning, policy, project, System, systems, technology, transportation, Washington, Washington state, WINGS, WSDOT


Download Report:
Kilian,A. P. WA-RD 239.1 Long-Term Performance Evaluation of Wood Fibre Fills 1992
Abstract:
This paper presents the results of a research project to determine the long-term performance of wood fibre embankments, that were constructed by the Washington State Department of Transportation (WSDOT) beginning in 1972. At the time of their construction, concern existed that wood fibre fills would only provide a 15 to 20 year service life.Performance of existing wood fibre fills was evaluated based on thequality of the wood fibre material, quality of the effluent, and condition ofthe pavement. A visual classification system rating the wood fibre from freshto completely decomposed was developed and used in order to establish acriteria from which all wood fibre mater.ia1 could be -rated.. Visual examinationin conjunction with laboratory tests were used as determining aspects for theeffluent quality. The WSDOT Pavement Management System was used to evaluate relative pavement performance. Site descriptions are presented giving specificcharacteristics and properties of the fills inventoried, An analysis of t h i sinformation was done to determine the effectiveness of the fills.Over half the wood fibre samples were found to be nearly fresh or freshand none w e found to be completely decomposed. In all but one case, thepavement quality over the wood fibre fills surpassed the comparative highwaysegment rating indicating the wood fill\'s performance exceeded thatof the surrounding area. Generally, the surface water in the vicinity of thewood fibre was found to be clean and pure indicating no adverse impact ofeffluent. Given the above findings, embankments constructed of wood fibre werefound to perform well over ahnost a 20. year period. Service life in excess of50 years can be expected - of wood fibre fills.

Authors:
Kilian,A. P., Ferry,C. D.

Keywords:
analysis, condition, construction, developed, effectiveness, Embankments, evaluation, impact, Leachate, management, management system, pavement, pavement management, pavement performance, pavements, performance, performance evaluation, project, quality, research, tests, transportation, Washington, Washington state, Wood fibre, WSDOT


Download Report:
Roper,T. H. WA-RD 149.1 Pacific Avenue O\'Xing Evazote 50 Expansion Joint Seal / Bridge #5/332 1990
Abstract:
Bridge expansion joints pose a special problem in the Washington State Department of Transportation (WSDOT) bridge deck management system. These devices are subject to repeated heavy dynamic loading, and premature failure has occurred in many cases. It is WSDOT policy, as part of the Bridge Deck Management System, to make expansion joints watertight in order to reduce the potential of substructure corrosion induced by roadway deicing salts and other contaminants.Expansion joint seals play an important role in keeping expansion joints watertight. A relatively new material, Evazote 50, looks promising in its performance characteristics as an expansion joint seal. It is able to accommodate considerable joint movement, its durability and corrosion resistant properties are excellent, and it is resistant to absorption of oils and greases. The purpose of this experimental project is to gain knowledge about the material\'s effectiveness over time and to gain knowledge about field installation techniques. It was very beneficial to have the manufacturer\'s representative on the job during installation. This was required by special provision and is a practice that should be continued on future projects.In-place performance will determine acceptance of Evazote 50 for general use.

Authors:
Roper,T. H., Henley,E. H. Jr

Keywords:
absorption, bridge, bridge deck, bridge deck rehabilitation, corrosion, Deck, durability, effectiveness, expansion joints, experimental, in-place, ITS, Joints, management, management system, performance, policy, roadway, salt, transportation, Washington, Washington state, WSDOT


Download Report:
Khisty, C.J. WA-RD 197.1 Freeway Incident Management in the Spokane Area 1989 TRAC/UW
Abstract:
The Washington State Department of Transportation (WSDOT) has embarked on a Freeway and Arterial Management Effort (FAME). This effort includes the collection of data, assessment of incident-related impacts, and the generation of incident management strategies across the state. This report focuses its attention on the effectiveness of existing incident management strategies applicable to the Spokane I-90 urban section, from the Four Lakes Interchange (Exit 270) on the west to the Idaho State Line on the east, covering a length of 30 miles. With direction and assistance from technical advisory committee data and information were gathered and analyzed to include roadway and accident characteristics of this urban section of I-90 and existing incident detection, response, servicing, and coordination practiced by several agencies serving the area. From this analysis, sections of I-90 that had a high potential for incidents were identified. As a result of this research, several useful products were developed, such that it would be necessary to carry this research forward to enhance the existing incident Management methods practiced in the Spokane area. Five specific actions are recommended (i) Structure the database and, if necessary, identify and complete any missing data needed, (ii) prepare an incident management manual capable of being updated on a regular basis, (iii) form an incident management team, (iv) format the data/information for use in a knowledge-based expert system (KBES) and (v) adopt KBES for Spokane.

Authors:
Khisty, C.J., Anderson, R.Q., Granberg, R.L.

Keywords:
Incident management, accidents, detection, freeway, incident, management, mitigation


Download Report:
Hallenbeck, M.E. Freeway Management Working Paper: Current Development of Traffic Models 1988 TRAC/UW
Abstract:
This paper provides an overview of traffic models that are available for use by WSDOT. It is intended to provide a general review of modeling capabilities that exist today, and present a future vision of what these capabilities will be in the near future. The information collected for this paper was used to select models to be tested for improving the departments ability to manage traffic during construction projects as well as during normal operation. Material presented in this document is based primarily on an extensive literature search, supplemented by the review of the documentation for a limited number of models, and the experience of project staff. Many of the models reviewed are still undergoing modification and refinement and many of these changes are not addressed in the literature. Thus, the reader should be aware that some models discussed within have capabilities not mentioned.

Authors:
Hallenbeck, M.E., Lin, C.

Keywords:
Traffic, management, modeling, construction,

Babaei, K. WA-RD 152.1 Development of a Bridge Deck Management System for Washington State Department of Transportation 1988 TRAC/UW
Abstract:
This report documents development of a systematic bridge deck management system ofr the Washington State Department of Transportation. This system determines present and future bridge deck condition, estimates required reconstruction and its associated costs, and priortizes and selects reconstruction while considering either budget constraints or condition level constraints.

Authors:
Babaei, K.

Keywords:
Bridge deck, management, concrete, deterioration, rehabilitation, protection


Download Report:
Toney,C. A. WA-RD 111.1 National Experimental and Evaluation Program: Washington State\'s Experience 1987
Abstract:
This document presents a summary of Washington State Department of Transportation\\\'s experience with the 28 projects of the National Experimental and Evaluation Program (NEEP).

Authors:
Toney,C. A.

Keywords:
counties, evaluation, experimental, management, management system, microcomputer, NEEP, pavement, pavement management, program, transportation, Washington, Washington state


Download Report:
Nihan,N. L. WA-RD 109.1 TeleCommunications Link Implementation 1987
Abstract:
The Telecom Link established between the University of Washington and the WSDOT Traffic Systems Management Center (TSMC) was updated during this project in order to handle the shift made by the TSMC from a 1700 loop surveillance system to a 2200 loop system. Special computer programs were also written to provide specialized summary statistics for key stations. The new software allowed statistics for key stations to be collected and summarized during data transfer. The entire transfer retrieval system was streamlined during the Telecom project to reduce costs. Finally, freeway incident analysis was performed with a data set to demonstrate the use of the new system for TSM research.

Authors:
Nihan,N. L.

Keywords:
analysis, computer, computer program, cost, costs, data, data management, data transfer, freeway, freeway surveillance and control, incident, management, program, ramp metering, research, software, statistics, surveillance, systems, telecommunications, telecommunications link, traffic, traffic systems management, transportation systems management, TSM, Washington, WSDOT


Download Report:
Sannes,S. WA-RD 089.1 Database Management System 1986
Abstract:


Authors:
Sannes,S., Rutherford,G. S.

Keywords:
research development, database, management, transportation management


Download Report:
Nihan,N. L. WA-RD 063.1 Telecommunications Link: Traffic Systems Management Center and University of Washington 1984
Abstract:
This report describes a newly established telecommunications link between Seattle\'s Traffic System Management Center (TSMC) and the University of Washington\'s (UW) Information Retrieval System. Volume data in five-minute intervals collected by the TSMC is transferred to the UW computer system. The reports contains a description of this 1 ink and a User\'s Guide for those who wish to access the data.

Authors:
Nihan,N. L.

Keywords:
computer, data, freeway surveillance, information retrieval, management, seattle, System, systems, telecommunications, telecommunications link, traffic, traffic systems management, traffic volumes, volume, Washington


Download Report:
Kulkarni,R. B. WA-RD 062.1 Feasibility Study of a Pavement Management System for Washington Counties 1984
Abstract:
The feasibility of adopting the Washington State Pavement Management System(WSPMS) for use by Washington counties was established. The WSPMS designoffers a great deal of flexibility for adjusting the system to satisfy thecounties needs. Some modifications to computer programs will be necessaryand can be accomplished with relatively modest effort. The major adjustmentswill be in those counties input data. The only data that are absolutelyessential are those for determining and evaluating pavement condition andthe most cost effective rehabilitation strategies.The state computer system has an adequate storage capacity to support usageof the WSPMS by a large number of counties. Dial-up capability i s availablefor use of WSPMS from remote terminals. Data processing hardware optionsavailable to counties range from no data processing equipment to stand alonecomputer system,A t r i a l demonstration is recommended, Two counties, one large with in-housecomputer f a c i l i t i e s and one small with no or minimal f a c i l i t i e s would bechosen to test the system.Significant. benefits are anticipated from the use of WSPMS. Washingtoncounties desiring to improve the process o f pavement management may findadopting and operating the WSPMS to feasible and desirable.

Authors:
Kulkarni,R. B., Finn,F. N., Lamot,A.

Keywords:
benefit, benefits, computer, computer program, condition, cost, cost effective, counties, data, design, equipment, maintenance, management, management system, Operating, pavement, pavement condition, pavement management, pavement repair, program, rehabilitation, Study, System, Washington, Washington state


Download Report:
Nelson,T. L. WA-RD 050.3 Development And Implementation Of Washington State's Pavement System - Executive Summary 1983
Abstract:
This report summarizes the pavement management system developed by WSDOT staff over a period of five years. Included is a description of what the system does in terms of the considerable amount of useful output data produced. A discussion is given on how the system was developed, what the pavement rating procedures involve and cost, what computer requirements are, and what typical data processing costs are. The report concludes with comments on how other agencies can use the Washington State Pavement Management System.

Authors:
Nelson,T. L., LeClerc,R. V.

Keywords:
agencies, computer, cost, costs, data, developed, development, Executive, Executive Summary, management, management system, pavement, pavement data file, pavement management, pavement performance, System, Washington, Washington state, WSDOT


Download Report:
Public Transportation and Planning Division WA-RD 045.2 Impacts Of Trucks And Railroad Deregulation On Transportation Operation And Economic Activity In The State Of Washinton ... 1982
Abstract:
The Motor Carrier Act of 1980 and the Staggers Act of 1980 have partially set aside decades of rigid regulations of interstate freight movement. These actions have the potential to bring forth significant changes to the networks of interstate freight transportation. The object of this research was to ascertain the impacts of deregulation of the Washington State transportation system. Information was obtained by surveying and interviewing shippers and freight transportation providers throughout the state. Anticipated impacts, e.g. accelerated rail abandonment or lost of motor carrier service to small communities were not present. The study reflects a relative increase in truck service and decrease in rail service since deregulation. Indications are this may be further amplified in certain regions of the state. The study recommends that potential highway impacts be incorporated into pavement management systems. Transportation officials are enjoined to treat issues relative to truck size and weight, highway cost allocation and deregulation as a single issue. Also, the Local Rail Service Assistance Program should be considered for use to offset any adverse impacts resulting from deregulation. During this period of the study, general economic conditions were poor. This resulted in a decrease in freight shipments and would suggest that some impacts of deregulation have been suppressed.

Authors:
Public Transportation and Planning Division, Washington State Department of Transportation

Keywords:
condition, cost, Deregulation, freight, highway, highway impacts, impact, impacts, management, management system, management systems, motor carrier, networks, pavement, pavement management, pavement management systems, program, rail service, railroads, regulation, research, System, systems, transportation, truck, trucking, trucks, Washington, Washington state, weight


Download Report:
Nelson,Thomas L. WA-RD 050.1 Development And Implementation Of Washington State's Pavement System 905 1982
Abstract:
This report describes the pavement management system developed by WSDOT staff over a period of five years. Both project-level and network-level pavement management are represented within the four broad areas of data processing which combine to constitute the foundation of the system.The design of a pavement data file is laid out together with the process of assembling it. Also shown are the methods used to analyze and convert the file data from pavement condition ratings to pavement performance curves for each project. The performance curves are then used, together with appropriate cost data, to determine the most cost-effective type and time to fix. The network-level program then summarized the need work for each year of a rehabilitation program. Mean are provided for adjusting the program to fit budget constraints or minimum acceptable levels of average pavement condition.It is concluded that the system, operating on biennial pavement condition ratings, provides a good solid framework for orderly analysis to estimate the economic benefits of the type, timing, and sequence of rehabilitation activities applied to a pavement.

Authors:
Nelson,Thomas L., LeClerc,R. V.

Keywords:
analysis, benefit, benefits, condition, cost, data, design, developed, development, foundation, framework, management, management system, methods, Operating, pavement, pavement condition, pavement data file, pavement management, pavement performance, performance, program, project, rehabilitation, System, Washington, Washington state, WSDOT


Download Report:
Nelson,Thomas L. WA-RD 050.2 Development And Implementation Of Washington State's Pavement System - Summary 906 1982
Abstract:
This report describes the pavement system developed by staff over a period of five years. Both project-level and network-level pavement are represented within the four broad areas of data processing which combine to constitute the foundation of the system. The design of a pavement data file is laid out together with the process of assembling it. Also shown are the methods used to analyze and convert the file data pavement condition ratings to pavement performance curves for each project. The performance curves are then used, together with appropriate cost data, to determine the most cost-effective type and of fix. The network-level program then the needed work for each year of a rehabilitation program. Means are provided for adjusting the program to fit budget constraints or acceptable levels of average pavement condition It is concluded that the system, operating on biennial pavement condition ratings, provides a good solid framework for orderly analysis to estimate the economic benefits of the type, timing, and sequence of rehabilitation activities apply to a pavement.

Authors:
Nelson,Thomas L., LeClerc,R. V.

Keywords:
analysis, benefit, benefits, condition, cost, cost effective, data, design, developed, development, foundation, framework, management, management system, methods, Operating, pavement, pavement condition, pavement data file, pavement management, pavement performance, performance, program, project, rehabilitation, System, Washington, Washington state, WSDOT


Download Report:
Social and Econonomic Planning Section of the WA State Department of Highways WA-RD 025.0 Social Factors In Transportation Planning 1976
Abstract:
This report presents a summary of the research project which resulted in the following guideline reports.25.1 Development and Implementation of Community Involvement Programs25.2 Indentification And Measurement of Social Factors in Transportation Planning25.3 Conducting Surveys Concerning Transportation25.4 Operation of Interdisciplinary Teams25.5 Team Scheduling and Management

Authors:
Social and Econonomic Planning Section of the WA State Department of Highways

Keywords:
Community Involvement, Social Factors, Socio-Economic Surveys, Inter-disciplinary Team Operation and Management, development, Executive Summary, management, planning, project, research, scheduling, survey, Surveys, transportation, transportation planning


Download Report:
Iverson,E. A. WA-RD 025.6 Guidelines For the Identification And Analysis Of Social Factors In Transportation Planning 1976
Abstract:
The objective of study was to develop criteria and procedures for the identification and measurement of social in transportation planning and the process by which such analyses are integrated into the decision-making process. The guidelines developed from this address several related but different parts of the total planning and design process. Two of the reports prepared as a part of this study are concerned with identifying and measuring social factors and conducting social and economic surveys to obtain necessary data. A third report is concerned with the development and implementation of involvement programs. The is made that an effective planning and design process must provide means by which the values and of residents of affected and users of transportation facilities can be incorporated in technical studies and the decision-making process. Two additional reports contain guidelines for the operation of interdisciplinary teams and team scheduling and management. The systematic interdisciplinary approach undertaken in the State of Washington provides a means by which technical data, values and opinions, and planning and design concepts and standards can all be evaluated by the team in reaching a solution to a problem.

Authors:
Iverson,E. A.

Keywords:
analysis, Community Involvement, Social Factors, Socio-Economic Surveys, Inter-disciplinary Team Operation and Management, criteria, data, design, design process, developed, development, facilities, impacts, management, planning, program, scheduling, survey, Surveys, transportation, transportation planning, Washington


Download Report:
Jacobson,R. WA-RD 025.5 Guidelines For Teams Scheduling and Management 1975
Abstract:
The purpose of this document is to present an effective method by which the scheduling and coordination of the activities of interdisciplinary teams can be carried out. A number of more traditional techniques of project control have not met the unique requirements of scheduling and managing the activities of an inter-disciplinary team since the basic logic of task ordering is time sequentiality. Quite a number of the activities of inter-disciplinary team can be carried on simultaneously or at any time within the project's period. The system developed within this document uses the principal of "nested" descriptions of program activities and then proceeds to develop operational procedures. The role of the individual team members as well a the overall project development is described.

Authors:
Jacobson,R., Parker,R.

Keywords:
control, developed, development, management, program, project, scheduling


Download Report:

Previous Next