UW WSU WSDOT

TRAC Reports


To sort the reports, click on a heading: Authors, Report #, Report Title, Year, or Publisher.
To download a report's pdf or see the abstract, click on the report.


Search returned 39 reports containing keyword: 'cost'
clear results
Previous
Search
Next

Authors
Report #
Report Title
Year
Publisher
McCormack,E. D. WA-RD 607.1 Options for Benchmarking Performance Improvements Achieved from Construction of Freight Mobility Projects 2005 TRAC/UW
Abstract:
This report documents the development of data collection methodologies that can be used to cost effectively measure truck movements along specific roadway corridors selected by transportation agencies in Washington State. The intent of this study was to design and test methodologies that could be used to measure the performance of freight mobility roadway improvement projects against benchmarks, or selected standards, that would be used both as part of the project selection process and to report on speed and volume improvements that resulted from completed freight mobility projects. One technology tested was Commercial Vehicle Information System and Networks (CVISN) electronic truck transponders, which are mounted on the windshields of approximately 20,000 trucks in Washington. By using software to link the transponder reads from sites anywhere in the state, the transponder-equipped trucks could become a travel-time probe fleet. The second technology tested involved global positioning systems (GPS) placed in volunteer trucks to collect specific truck movement data at 5-second intervals. With GPS data it was possible to understand when and where the monitored trucks experienced congestion and to generate useful performance statistics. The study found that both data collection technologies could be useful; however, the key to both technologies is whether enough instrumented vehicles pass over the roadways for which data are required. This basic condition affects whether the technologies will be effective at collecting the data required for any given benchmark project. The report also recommends the traffic data that should be collected for a benchmark program and the potential costs of using either data collection technology.

Authors:
McCormack,E. D., Hallenbeck,M. E.

Keywords:
agencies, commercial vehicle, condition, congestion, construction, corridors, cost, costs, data, data collection, design, development, freight, freight mobility, freight movement reliability, global positioning, global positioning systems, GPS, improvement, methodology, mobility, networks, performance, positioning, probe program, project, research, roadway, software, speed, statistics, Study, System, systems, technology, traffic, traffic data, transportation, travel time, truck, truck monitoring, trucks, volume, Washington, Washington state


Download Report:
External Links:
http://www.wsdot.wa.gov/research/reports/fullreports/607.1.pdf http://wsdot.wa.gov/Research/Reports/600/607.1.htm
Kopf,J. WA-RD 619.1 Measurement of Recurring and Non-Recurring Congestion: Phase 2 2005 TRAC/UW
Abstract:
In 2003, the Washington State Department of Transportation (WSDOT) initiated a research effort to develop and test a methodology for estimating congestion delay on Seattle area freeways. The initial phase of the research developed a preliminary methodology for both measuring congestion and assigning that congestion to specific lane blocking incidents. In Phase 2 of this study, that methodology was automated and extended to include an examination of the effects of incidents occurring on the shoulders of the freeway, spillback from incident-caused congestion on one freeway that affects a second freeway that feeds traffic onto the initially congested facility, special events, and weather. Because funding for this effort was extremely limited, only three corridors (with both directions analyzed independently) and two months of data were analyzed. The project found that the Phase 1 methodology works well in assigning traffic congestion that occurs in the immediate time frame and geographic location of incidents to those incidents. It also showed that this process can be automated, making the data preparation effort now the primary determinant of the cost of additional work of this kind. Unfortunately, even with the addition of shoulder incidents, special events, and weather to lane blocking events, the automated process is unable to assign a significant proportion of the non-recurring delay occurring on Seattle freeways. The detailed analysis of freeway performance showed that much of the delay caused by specific incidents occurs in places or at times removed from the incident itself. The result is that much of the observed non-recurring delay can not be assigned to specific causes by the current analytical process. New analytical procedures will need to be developed in Phase 3 of this work. The Phase 2 analysis also confirmed that the congestion effects of specific incidents and other traffic disruptions are highly dependent on the background traffic conditions at the time of the disruption. While the Phase 2 analysis did not produce all of the results desired, the additional analyses showed that the summary statistics output from the Phase 2 software are useful as input to other analytical procedures.

Authors:
Kopf,J., Nee,J., Ishimaru,J. M., Hallenbeck,M. E.

Keywords:
congestion causes, freeway performance, traffic congestion, Washington, Washington state, transportation, WSDOT, research, methodology, congestion, seattle, freeway, developed, incident, Study, effects, traffic, facilities, corridors, data, project, cost, analysis, performance, in-place, condition, statistics, software


Download Report:
External Links:
http://www.wsdot.wa.gov/research/reports/fullreports/619.1.pdf http://wsdot.wa.gov/Research/Reports/600/619.1.htm
Hieber,D. G. WA-RD 611.1 Precast Concrete Pier Systems for Rapid Construction of Bridges in Seismic Regions 2005 TRAC/UW
Abstract:
Increasing traffic volumes and a deteriorating transportation infrastructure have stimulated the development of new systems and methods to accelerate the construction of highway bridges. Precast concrete bridge components offer a potential alternative to conventional reinforced, cast-in-place concrete components. The use of precast components has the potential to minimize traffic disruptions, improve work zone safety, reduce environmental impacts, improve constructability, increase quality, and lower life-cycle costs. This study compared two precast concrete bridge pier systems for rapid construction of bridges in seismic regions. One was a reinforced concrete system, in which mild steel deformed bars connect the precast concrete components and provide the flexural strength of the columns. The other was a hybrid system, which uses a combination of unbonded post-tensioning and mild steel deformed bars to make the connections. A parametric study of the two types of systems was conducted using nonlinear finite element models to investigate the global response and likelihood of damage for various frame configurations. On the basis of this study, a practical method was developed to estimate maximum seismic displacements from the cracked section properties of the columns, the elastic design displacement response spectrum, and the base-shear strength ratio. The results of the global nonlinear finite element analyses suggest that the systems have the potential for good seismic performance. Further analytical and experimental research is needed to investigate the constructability and seismic performance of the connection details.

Authors:
Hieber,D. G., Wacker,J. M., Eberhard,M. O., Stanton,J. F.

Keywords:
Alternative, bridge, bridges, columns, concrete, concrete bridge, connections, constructability, construction, cost, costs, damage, design, developed, development, environmental, environmental impact experimental, finite element, highway, impact, impacts, infrastructure, methods, models, performance piers, precast, precast concrete, prestressed concete, quality, Rapid construction, Regions, reinforce concrete, research, response spectra, response spectrum, safety, seismic, seismic performance, steel strength, Study, substructures, System, systems, traffic, traffic volumes, trasportation, volume


Download Report:
External Links:
http://www.wsdot.wa.gov/research/reports/fullreports/611.1.pdf http://wsdot.wa.gov/Research/Reports/600/611.1.htm
McCormack,E. D. Options for Benchmarking Performance Improvements Achieved from Construction of Freight Mobility Strategic Investment Bo... 2004 TRAC/UW
Abstract:
This report documents the development of data collection methodologies that can be used to cost effectively measure truck movements along specific roadway corridors selected by the Freight Mobility Strategic Investment Board (FMSIB.) The intent of this study was to design and test methodologies that could be used to measure the performance of freight mobility roadway improvement projects against benchmarks, or selected standards, which would be used both as part of the project selection process and to report on speed and volume improvements that resulted from completed FMSIB projects. One technology tested was Commercial Vehicle Information System and Networks (CVISN) electronic truck transponders, which are mounted on the windshields of approximately 20,000 trucks traveling in Washington. These transponders are used at weigh stations across the state to improve the efficiency of truck regulatory compliance checks. By using software to link the transponder reads from sites anywhere in the state, the transponder-equipped trucks could become a travel time probe fleet. The second technology tested involved global positioning systems (GPS) placed in volunteer trucks recruited for this project to collect specific truck movement data at 5-second intervals. With GPS data it was possible to understand when and where the monitored trucks experienced congestion. By aggregating this information over time, it was possible to generate performance statistics related to the reliability of truck trips, and even examine changes in route choice for trips between high volume origin/destination pairs. The study found that both data collection technologies could be useful; however, the key to both technologies is whether enough instrumented vehicles pass over the roadways for which data are required. This basic condition significantly affects whether the transponder and GPS technologies will be effective at collecting the data required for any given FMSIB benchmark project . The report also recommends the traffic data that should be collected for a benchmark program and the potential costs of using either data collection technology.

Authors:
McCormack,E. D., Hallenbeck,M. E.

Keywords:
freight movement reliability, truck monitoring, development, data, data collection, methodology, cost, truck, roadway, corridors, freight, freight mobility, mobility, design, performance, speed, volume, commercial vehicle, networks, trucks, Washington, software, travel time, probe, global positioning, global positioning systems, positioning, systems, GPS, congestion, statistics, reliability, condition, traffic, traffic data, program, costs


Download Report:
Kristof,T. WA-RD 597.1 Assessing the Benefits of Traveler and Transportation Information Systems 2004 TRAC/UW
Abstract:
The goal of advanced traveler information systems (ATIS) is to provide travelers with information that will facilitate their decisions concerning route choice, departure time, trip delay or elimination, and mode of transportation. The benefits of ATIS projects can be evaluated through field studies, simulation software, and surveys. An evaluation method called the ITS Deployment Analysis System (IDAS) is suggested for use by the Washington State Department of Transportation (WSDOT). IDAS is a "sketch" planning tool intended for screening and prioritizing all intelligent transportation systems (ITS) projects (not just ATIS projects). The software evaluates a number of benefits. These are determined by changes attributable to the deployment of ITS in vehicle miles traveled (VMT), vehicle hours traveled (VHT), volume-capacity (v/c) ratios, and vehicle speeds throughout a given network. The IDAS evaluation depends on a number of assumptions that affect the calculations of costs and benefits. The IDAS developers recommend that these assumptions be inspected by local agencies and adjusted to better represent local conditions. The assumptions about the impacts on VMT, VHT, v/c ratios, and vehicle speed are particularly important. Consequently, suggestions are made within this report for adjustments that WSDOT should make to these default values. These values will allow the WSDOT to successfully employ IDAS for ATIS evaluation.

Authors:
Kristof,T., Lowry,M., Rutherford,G. S.

Keywords:
advanced traveler information systems, agencies, analysis, Assessing, ATIS, ATIS benefits, ATIS evaluation, benefit, benefits, condition, cost, costs, Deployment, evaluation, IDAS, impact, impacts, information systems, Intelligent transportation system, intelligent transportation systems, ITS, ITS Deployment Analysis System, planning, prioritizing, project, research, software, speed, Study, survey, Surveys, System, systems, transportation, traveler information, Washington, Washington state, WSDOT


Download Report:
External Links:
http://www.wsdot.wa.gov/research/reports/fullreports/597.1.pdf http://wsdot.wa.gov/Research/Reports/500/597.1.htm
Igharo,P. O. WA-RD 580.1 In-Service Performance of Guardrail Terminals in Washington State 2004 St. Martin's College/WSDOT
Abstract:
This research study was conducted to evaluate the in-service performance of existing guardrail end treatments and unrestrained pre-cast concrete barrier in Washington State. For a selected area of the state highway system over a one-year period, local area maintenance personnel were tasked to document incidents, including extent of damage and repair costs, into a database using NCHRP Project 22-13 methodology. Additional information (accident severity, e.g.) from police reports was gathered from the incidents and added to the database. The installation characteristics measured for Breakaway Cable Terminals (BCT) and Slotted Rail Terminals (SRT), along with the related crash data for these devices, showed overall acceptable performance when struck. Review of the incident severities, together with the displacement and damage data on struck barriers in the study area, revealed no significant difference in BCT and SRT performance. The installation, damage, and displacement characteristics examined on struck concrete barrier showed that the pin and loop connections were holding well in incidents, and the barrier displacements during incidents were within the WSDOT design specification for such systems.

Authors:
Igharo,P. O., Murphy,J., Glad,R. W.

Keywords:
performance, guardrail, Washington, Washington state, guardrail end treaments, breakaway cable terminal (BCT), roadside safety, slotted rail terminal (SRT), research, end treatment, precast concrete, concrete, concrete barrier, highway, maintenance, incident, damage, repair, costs, cost, database, methodology, accident severity, data, barriers, WSDOT, design, specification, systems


Download Report:
External Links:
http://www.wsdot.wa.gov/research/reports/fullreports/580.1.pdf http://wsdot.wa.gov/Research/Reports/500/580.1.htm
Ishimaru,J. M. WA-RD 555.1 North Seattle Advanced Traffic Management System (NSATMS) Project Evaluation 2002 TRAC/UW
Abstract:
This report documents the findings of the evaluation of the North Seattle Advanced Traffic Management System (NSATMS) Project. The evaluation was originally designed to analyze the potential transportation benefits and costs of a regional arterial traffic data sharing system that would obtain traffic signal system information (volumes, signal timing plans, etc.) from participating agencies and then share the data among those agencies. The operational goal was to allow each agency to make better control decisions by providing it with real-time knowledge of traffic conditions outside of its own control system boundaries. Because of a series of technical and project management issues, the system as originally envisioned was not successfully implemented. As a result, this evaluation does not include an analysis of direct operational benefits. It does, however, include a discussion of the expected institutional benefits, as well as an extensive "lessons learned" section based on the project team's review of the NSATMS effort. Of particular note were the importance of effective and ongoing lines of project communication, and the critical need to properly evaluate the fundamental nature of the project and provide a well-matched project management structure. The lessons learned from this project provide instructive guidelines for those who are contemplating future ITS system development efforts of comparable scope and complexity. Despite the limited successes of the NSATMS effort, the evaluation team found continued support for the regional arterial ATMS concept within the Puget Sound region. Follow-on research that contributes to a better understanding of the benefits, costs, and technical requirements of an arterial traffic management system is desired by many of the project participants.

Authors:
Ishimaru,J. M., Hallenbeck,M. E.

Keywords:
intelligent transportation systems, advanced traffic management systems, arterial signal control systems, traffic control strategies, Archived Data User Services (ADUS), data sharing, evaluation, seattle, advanced traffic management systems, traffic, traffic management, management, management system, transportation, transportation benefit, benefits, benefit, costs, cost, arterial, traffic data, data, volume, control, condition, ITS, project management, analysis, line, development, ATMS, research


Download Report:
External Links:
http://www.wsdot.wa.gov/research/reports/fullreports/555.1.pdf http://wsdot.wa.gov/Research/Reports/500/555.1.htm
Nee,J. WA-RD 518.1 Evaluation of the Service Patrol Program in the Puget Sound Region 2001 TRAC/UW
Abstract:
The Service Patrol pilot demonstration in Seattle and Tacoma was managed by the Washington State Department of Transportation (WSDOT) and operated by Washington State Patrol (WSP) cadets and contracted registered tow truck operators (RTTOs). Two other roving services, not funded as part of this pilot effort but included to a limited extent in this evaluation, were the roving patrol service provided by WSDOT on the SR 520 and I-90 floating bridges and the privately sponsored motor assistance vehicle from AAA's RescueVan. The evaluation examines how the similarities and differences among the different service delivery modes (e.g., the intensity of deployment, equipment choices, service delivery, costs) affect the impact of the Service Patrol operation on traffic conditions (e.g., reductions in delay) and the level of motorist satisfaction. This report also discusses feedback by the agencies participating in the Service Patrol program on institutional and operational issues that contribute to or hinder the success of the program. Operational characteristics and operating statistics are reported to convey factors that describe program effectiveness. The results of the study indicate that the use of a combination of service providers has benefits that no single provider can duplicate, and the cost implications of changing the program are small enough that any potential savings would be fairly minor. The pilot project resulted in a variety of intangible benefits, such as improved interagency coordination and cooperation, more efficient utilization of personnel, and a better understanding of each partner's roles and contributions toward congestion relief. The positive viewpoint toward the Service Patrol was uniform, regardless the service mode. Therefore, no significant changes to the existing pilot program are recommended at this time.

Authors:
Nee,J., Hallenbeck,M. E.

Keywords:
service patrols, incident response time, traffic delay, traffic safety, research, seattle, Washington, Washington state, transportation, WSDOT, truck, evaluation, floating bridge, bridges, bridge, costs, cost, traffic, condition, program, statistics, benefits, benefit, congestion


Download Report:
Lewis,L. WA-RD 491.1 Soil Bioengineering for Upland Slope Stabilization 2001 TRAC/National Riparian Service Team, USDA, Fo
Abstract:
The objective of the study was to provide alternatives called soil bioengineering methods for slope and shallow rapid landslide stabilization along different roadside environments. Additional objectives were to educate WSDOT personnel in site selection, soil bioengineering techniques, and construction; to provide soil bioengineering decision-making skills. Three study sites were selected, based upon the following criteria: safety, visibility, accessibility, representation of disparate moisture conditions, climate, and erosion types, illustration of different techniques, availability of additional funding, and WSDOT input. Three different combinations of soil bioengineering techniques were used to stabilize upland slopes on the roadside. Results indicate soil bioengineering is an effective means of upland slope stabilization on erosional slopes and shallow rapid landslides and is practical and economical. Composted biosolids improved soil workability and enhanced the native plant community during the first year.

Authors:
Lewis,L., Salisbury,S. L., Hagen,S., Maurer,M.

Keywords:
benefit, biosolids, branchpacking, brush layering, cordon, cost, cribwall, erosion, erosion control, fascine, landslides, live cribwall, live gully repair, live staking, native plants, research, slope stabilization, soil bioengineering, willow wall


Download Report:
Allen,T. M. WA-RD 528.1 Application of the K 0-Stiffness Method to Reinforced Soil Wall Limit States Design 2001 Washington State Dept. of Transportation
Abstract:
A new design methodology for estimating reinforcement loads in reinforced soil walls, termed the K 0-Stiffness Method, has been developed. This new method has been demonstrated to more accurately estimate reinfocement loads and strains in reinforced soil walls than do current design methodologies. Step-by-step procedures are provided to lead the designer through the reinforced soil wall internal stability design process using this new methodology. These step-by-step design procedures have been developed with a limit states design approach consistent with current design codes (in North America this is termed Load and Resistance Factor Design, or LRFD). Specifically, consideration has been given to strength and serviceability limit states. Load and resistance factors, based on statistical data where feasible, have been developed for use with this method. The results of examples from actual wall case histories were summarized and analyzed to assess how well the new methodology performs relative to current design practice. From this analysis of the design examples, the following was observed: For geosynthetic walls, the K 0-Stiffness Method has the potential to reduce required backfill reinforcement capacity relative to current design methodology by a factor of 1.2 to 3. For steel reinforced soil walls, the reduction in the reinforcement capacity relative to what is required by current design methodology is more modest, on the order of 1.0 to 2.1. Given these findings, use of the K 0-Stiffness Method can result in substantial cost savings, especially for geosynthetic walls, because of reduced reinforcement needs.

Authors:
Allen,T. M., Bathurst,R. J.

Keywords:
reinforcement, walls, loads, strains, creep, design, research, methodology, soil, developed, stability, design process, codes, North, resistance, strength, data, analysis, geosynthetic, steel, cost


Download Report:
External Links:
http://www.wsdot.wa.gov/research/reports/fullreports/528.1.pdf http://wsdot.wa.gov/Research/Reports/500/528.1.htm
Wetherby,B. WA-RD 462.6 SWIFT - Evaluation Summary 1999
Abstract:
The SWIFT (Seattle Wide-area for Travelers) project was a field operational test of a wide area ITS communications system using a flexible FM sub-carrier High Speed Data System (HSDS). The test was conducted in a partnership with WSDOT, King County Metro Transit, Delco Electronics, Inc., IBM, Seiko Communications Systems, Metro Traffic Control and the Federal Highway Administration. Three devices were used, by the public, to receive the traveler a Delco car radio (capable of providing vector navigation in addition to personal paging and the messages); a Seiko wrist watch pager; and a portable computer (capable of providing graphic displays of traffic advisories and bus positions). After the 15-month test, interviews with the 600 Seattle commuters/participants were conducted to assess user acceptance. A communications study evaluated the adequacy of the HSDS system to disseminate traveler information. Architecture study assessed the effectiveness of the various components to carry out SWIFT operations. institutional issues study documented the history of the project and assessed the institutional issues confronted. A deployment cost study investigated the cost of deployment of a SWIFT system and assessment of potential profitability. The first five reports in this series detail individual aspects of the project.

Authors:
Wetherby,B., Perez,W.

Keywords:
Acceptance, Assessment, bus, computer, control, cost, counties, data, Deployment, effectiveness, evaluation, highway, Institutional, interviews, Issues, ITS, Miscellaneous Library, paging, portable computer, project, public, seattle, speed, Study, SWIFT, System, systems, traffic, traffic advisories, traffic control, transit, traveler information, WSDOT


Download Report:
Wetherby,B. WA-RD 462.4 SWIFT - Institutional Issues 1998
Abstract:
The Seattle Wide-area Information for Travelers (SWIFT) project was a highly successful Intelligent Transportation System (ITS) Field Operational Test (FOT) that was conducted over a four-year period from 1993 to 1997. The purpose of the project was to test the efficacy of a High Speed Data System (HSDS), or FM Sub-carrier, to disseminate incident, bus and speed congestion information via three different end-user devices: pager watch, portable computer and in-vehicle navigation device. Six hundred ninety (690) commuters, many with route- or mode-choice options, participated in the FOT and provided user-acceptance evaluations. Other evaluation components examined the system architecture, communications coverage, deployment cost and institutional issues that affected the project.The primary purpose of the SWIFT Institutional Issues Study evaluation was to collect information regarding the institutional issues (e.g., policies, jurisdictional issues, internal and external factors) that affected design, development, testing, deployment and conduct of the SWIFT Field Operational Test (FOT); determine how these issues were overcome and what lessons could be learned. A secondary purpose of the evaluation was to document the history of the SWIFT project.The methodology for the SWIFT Institutional Issues Study consisted of two sets of questionnairesand two sets of semi-structured interviews that were conducted with fourteen (14) SWIFT team memberrepresentatives at two different points during the conduct of the SWIFT FOT: about midway through the conduct of the test and after the test was completed. All SWIFT team member responses were independently collected and SWIFT institutional issues were primarily identified by determining which topics were addressed by two or more individuals. Historical information was collected from various sources throughout the project.SWIFT represents one of the first ATIS FOTs conducted in this country. Earlier tests were conducted in Orlando, FL (TravTek) and Minneapolis St. Paul (Genesis) among others, yet the SWIFT FOT appears to have extended considerably the available database of information regarding ATIS effectiveness and acceptance. The addition of real-time bus information, in particular, has set the SWIFT FOT apart from others already conducted.One of the significant aspects of the SWIFT teaming agreement was the long-term interest in ITS and commitment of the organizations involved. For instance, the majority of the SWIFT team members articulated a long-term interest in ITS deployments. In addition, three organizations-Seiko, Etak and Metro Traffic Control-+ommitted themselves to fielding a \"SWIFT-like\" system after the project was completed. This degree of interest and commitment resulted in all of the SWIFT team members working together in a very effective, cooperative fashion throughout the FOT.A critical organizational structure that was instituted to implement SWIFT was the weeklyteleconference. This simple, yet cost-effective method of managing and discussing the technicalissues involved with the project was attributed by many of the SWIFT team members to aprimary instrument of the project\'s success. In particular, the SWIFT teleconferences enabledthe representatives of each organization to keep abreast of the developmental status of theproject, to brainstorm solutions to encountered problems and to develop scheduling sense.

Authors:
Wetherby,B.

Keywords:
ATIS, bus, computer, congestion, congestion information, cost, data, database, design, development, effectiveness, evaluation, incident, Institutional, Intelligent transportation system, interviews, Issues, ITS, methodology, mode choice, policy, portable computer, project, scheduling, seattle, speed, SWIFT, System, tests, traffic, transportation


Download Report:
Jensen,M. WA-RD 462.3 SWIFT - Deployment Cost Study 1998
Abstract:
The Seattle Wide-area Information For Travelers (SWIFT) project was a highly successful Intelligent Transportation System (ITS) Field Operational Test (FOT) that was conducted over a four-year period from 1993 to 1997. The purpose of the project was to test the efficacy of a High Speed Data System (HSDS), or FM Sub-carrier, to disseminate incident, bus and speedlcongestion information via three different end-user devices: pager watch, portable computer and in-vehicle navigation device. Six hundred ninety (690) commuters, many with route- or mode-choice options, participated in the FOT and provided user-acceptance evaluations. Other evaluation components examined the system architecture, communications coverage, institutional issues, and consumer acceptance. The primary purpose of the SWIFT Deployment Cost Study was to provide an independent Life Cycle Cost Estimate (LCCE) of an operational and fully deployed SWIFT system. Moreover, it is intended to provide both the SWIFT participants and the FHWA with a measure of the commercial viability of \"SWIFT-like\" systems nationwide. Table ES- 1 shows the organizations that were included in the SWIFT Deployment Cost Study LCCE and commercial viability analysis.Table ES-1. Deployed SWIFT Participants (CostIRevenue Participants).Industry Government/InstitutionaISeiko Communications Systems, Inc. (SCS) King CountyMetro Networks University of WashingtonEtak, Inc.IBM (FOT Development Only)Delco Electronics (FOT Development Only)The methodology for the SWlFT Deployment Cost Study LCCE relied on standard proven costestimation and data collection and analysis techniques to provide cost estimates for each SWIFTparticipant shown above across the following three life-cycle phases:1) FOT development (costs of current SWIFT Test)King County Metro TransitUniversity of Washington (UW)2) Commercial Development (additional development and procurement costs for fullydeploying an operational SWIFT system (follows the completion of the SWIFT test)3) Annual Commercial Operations (annual operations costs for a fully deployed SWIFTsystem)A summary of the resulting life cycle cost estimate (LCCE) for the deployed SWIFT system ispresented in Table ES-2. Here, the FOT Development phase (based on SWIFT test actuals) wasestimated to cost $6.4 Million, the Commercial Development phase was estimated to cost $1.5Million, and the Annual Commercial Operations costs were estimated to be $0.8 Million.-- -SWIFT Deployment Cost Study I

Authors:
Jensen,M.

Keywords:
Acceptance, analysis, Annual, bus, computer, Consumer, cost, costs, counties, data, data collection, Deployment, development, evaluation, incident, Institutional, Intelligent transportation system, Issues, ITS, methodology, Miscellaneous Library, mode choice, networks, portable computer, project, seattle, speed, Study, SWIFT, System, systems, transportation, Washington


Download Report:
Trowbridge,A. WA-RD 415.1 The Potential for Freight Productivity Improvements Along Urban Corridors 1996 TRAC/UW
Abstract:
The impacts that would result from providing "reserved capacity" for trucks rather than restricting trucks are considered in this study. In the extreme case, trucks would be allowed to travel in a dedicated or exclusive lane. A more moderate approach would be to provide a cooperative dedicated lane in which vehicles such as trucks and buses could share a common lane and yet be separated from general traffic.The study determined the following. Reserved-capacity strategies for trucks would offer (1) nearly $10 million in annual travel time savings for the trucking industry, (2) a savings of about 2.5 minutes per average truck trip (less than 8 percent savings in trip travel time), and (3) almost $30 million in annual travel time savings for single-occupancy vehicles in the Seattle region. The difference in travel times between the reserved-capacity strategy that would add trucks to the existing HOV lanes and the one that would add an exclusive truck lane would be insignificant, providing little justification for the construction of an exclusive truck lane. In all likelihood, the impact of reserved-capacity strategies on safety would be small, depending on the particular reserved capacity strategy. Reserved capacity strategies for trucks would accelerate pavement deterioration in the reserved lanes, but the reduction in the pavement deterioration rates of the general purpose lanes might help to balance future reconstruction costs. Surveys of the general public and subsequent statistical analysis showed considerable resistance to reserved-capacity strategies for trucks. However, this resistance is not unlike that encountered when HOV lanes were first considered.It is the recommendation of this study that the idea of reserved-capacity strategies for trucks continue to be presented to the trucking industry, to the public, and to other impacted agencies for discussion and consideration. The study showed that the adverse impacts of such strategies are easily manageable and there is at least potential for freight-productivity improvements.

Authors:
Trowbridge,A., Nam,D., Mannering,F. L., Carson,J.

Keywords:
agencies, analysis, Annual, buses, construction, corridors, cost, costs, deterioration, exclusive truck lanes, freight, freight mobility, HOV, HOV lanes, impact, impacts, improvement, lanes, pavement, public, reconstruction, research, resistance, safety, seattle, statistical analysis, survey, Surveys, travel, travel time, travel times, truck, trucking, trucks, urban


Download Report:
Swearigen,D. L. WA-RD 252.1 Use of Recycled Materials in Highway Construction 1992
Abstract:
The major objectives of this study were to examine: (1) the types of recycled materials that are appropriate and feasible as alternative paving materials such as glass and tires; and (2) the types of recycled materials, such as mixed-plastics and compost, that can be utilized in all types of transportation applications other than pavements. Seven key products are investigated: tires; glass; asphalt concrete fly ash; compost; mixed plastics; and sign stock. Performance and cost data for pavements is documented for both in-state and nationwide applications. The national experience \'with the use of waste glass as an additive to asphalt concrete and its use in unbound base material is so highlighted. Programs for experimental use of recycled material are outlined. Recommendations for staffing and program changes to deal with recycling are also discussed.

Authors:
Swearigen,D. L., Jackson,N. C.

Keywords:
additive, Alternative, applications, asphalt, asphalt concrete, base, base materials, concrete, construction, cost, data, experimental, fly ash, Glasphalt, highway, highway construction, ITS, materials, objectives, pavement, pavements, performance, program, recycled ACP, recycling, Rubber-asphalt, tire, tires, transportation


Download Report:
Carney III,J. F. WA-RD 308.1 Development of Maintenance-Free Safety Appurtenances 1992
Abstract:
This final report demonstrates the feasibility of employing high molecular weight/high density polyethylene cylinders as the energy dissipating medium in highway safety appurtenances. It is shown that this polymer can dissipate large amounts of kinetic energy, undergo large deformations and strains without fracturing, and essentially restore itself to its original size, shape, and energy dissipation potential when the forcing function is removed.This research involves a quasi-static and impact loading experimentalinvestigation to determine the energy dissipation characteristics of HMW HDPEtubes as functions of temperature, radius to wall thickness ratio, strain,strain-rate, deformation, and repeated and cyclic loading. The results ofthis experimental program are analyzed to develop analytic energy dissipationexpressions which are then employed in the design of truck mountedattenuators (TMA), Finally, an expert system computer program, CADS, ismodified to use HMW HDPE tubes in the generalized design of crash cushions.The potential financial, legal, and safety payoffs for highway operationsassociated with developing highway safety devices which are essentiallymaintenance free are significant. Maintenance costs associated with therepair of impacted safety devices would be greatly reduced or eliminated.Tort liability exposure related to damaged or collapsed hardware would besignificantly decreased. Finally, the safety of the motoring public and themaintenance personnel involved in maintaining and repairing damaged hardwarewould be enhanced.

Authors:
Carney III,J. F.

Keywords:
computer, computer program, cost, costs, cyclic loading, density, design, development, Energy, experimental, expert system, exposure, highway, highway safety, impact, impact attenuation devices, ITS, maintenance, maintenance free, polyethylene, polymer, program, public, research, reusable, safety, self-restoration, strains, temperature, truck


Download Report:
Ernst,D. D. WA-RD 113.1 Alternative Deicing (CMA Research) 1988
Abstract:
As part of the pooled fund research project, the Washington State Department of Transportation was selected to field-test approximately 100 tons of Calcium Magnesium Acetate (CMA) to evaluate its potential as a deicing chemical with direct comparison to salt (Sodium Chloride) and Urea. Evaluation included all aspects of storage, handling, use, and performance. CMA was applied whenever necessary at each test site, using the same application rates as presently used for salt. Typical equipment consisted of front dump trucks with the spinner ahead of the rear axle, and rear discharge hopper trucks. All equipment was used without modification.The use of CMA at the beginning of a storm reduced the amount of bonding of snow to the roadway surface. This effect of keeping the roadway surface bare for longer periods of time reduced the cost of snow fighting. This was accomplished with chemical application rate of 125 Ibs. per lane mile.The addition of sand to CMA reduced the problems of dust, caking and uneven distribution. The sand provided moisture and weight to the application resulting in a smoother, more even distribution. CMA spread above was excessively dusty creating problems in the spreading and distribution. CMA is slower to react on compact snow and ice than salt or Urea. This delay in reaction time was not considered a handicap in the overall snow fighting procedure.The conclusion was that CMA shows promise as a deicing-melting chemical. The problems of dust, light-weight and brittleness need further work and may be significantly alleviated by development of a hydrated compound.

Authors:
Ernst,D. D.

Keywords:
Alternative, axle, chloride, cost, Deicing (CMA Research), development, evaluation, field test, ITS, lightweight, performance, research, roadway, salt, snow, transportation, truck, trucks, Washington, Washington state, weight


Download Report:
Peters,A. J. WA-RD 127.1 Plusride Asphalt Pavement 1987
Abstract:
This is the final report of PlusRide being used as the wearing course on a bridge deck overlay.A Class D Asphalt Concrete pavement which is an open graded friction course was used on an adjacent bridge as a control for the PlusRide. The PlusRide claims were high friction resistance, reduced noise, increased fatigue properties and deicing characteristics. The PlusRide cost 50 percent more that the Class D and the friction resistance, noise levels and fatigue properties were the same for the PlusRide and Class D. The deicing characteristics could not be confirmed due to the absence of surface icing on highways in the Yakima area.

Authors:
Peters,A. J., Schultz,R. L.

Keywords:
asphalt, asphalt concrete, Asphalt Concrete pavement, asphalt pavement, bridge, bridge deck, bridge deck overlay, claims, Class D, concrete, control, cost, Deck, fatigue, friction, highway, Highways, noise, overlay, pavement, PlusRide, resistance


Download Report:
Nihan,N. L. WA-RD 109.1 TeleCommunications Link Implementation 1987
Abstract:
The Telecom Link established between the University of Washington and the WSDOT Traffic Systems Management Center (TSMC) was updated during this project in order to handle the shift made by the TSMC from a 1700 loop surveillance system to a 2200 loop system. Special computer programs were also written to provide specialized summary statistics for key stations. The new software allowed statistics for key stations to be collected and summarized during data transfer. The entire transfer retrieval system was streamlined during the Telecom project to reduce costs. Finally, freeway incident analysis was performed with a data set to demonstrate the use of the new system for TSM research.

Authors:
Nihan,N. L.

Keywords:
analysis, computer, computer program, cost, costs, data, data management, data transfer, freeway, freeway surveillance and control, incident, management, program, ramp metering, research, software, statistics, surveillance, systems, telecommunications, telecommunications link, traffic, traffic systems management, transportation systems management, TSM, Washington, WSDOT


Download Report:
Itani,R. WA-RD 155.1 Design of Continuous Bridges Using Precast, Prestressed Concrete Girders without Endblocks 1987
Abstract:
This study investigated the feasibility of eliminating endblocks from pretensioned continuos bridge girders. The removal of endblocks is estimated to reduce girder costs by 5 to 10 percent. The girders studied were the Washington State Department of Transportation\'s \"Series 14\". These girders are characterized by 5 inch thick webs and are prestressed with both harped and straight 1/2 inch diameter grade 270 stands. Previous research had recommended the elimination of endblocks for simple span bridges. This study dealt with continuous bridges.The research consisted test and a destructive laboratory test. The field test was used identify bases for the destructive testing. \"Series14 \" girder with endblocks and \"Series 60\" girders without endblocks were instrumented with strain gages and monitored from the time they manufactured to the time thel oads were tested on the bridge. The laboratory test was performed with a balanced cantilever arrangement using two \"14\" girders without without endblocks. The joint at the support was made continuous by providing deck reinforcement in a manner similar to reinforcing details used by WSDOT. Concentrated incrementally applied at a distance of 13 ft.10 inches from the continuous support. The modified girders performed effectively under applied loads. Therefore, endblocks may be removedfrom continuous Series \"14\" girders with normal diaphragms. The study recommends that one \"Series 14\" continuous girder without endblocks be designed and monitored through the various stages ofconstruction and service in another bridge.

Authors:
Itani,R., Hiremath,G. S., Vasisth,U.

Keywords:
base, bridge, bridges, concrete, construction, cost, costs, Deck, design, diaphragms, endblocks, field test, girders, loads, prestressed, prestressed concrete, Prestressing, pretensioned, reinforcement, research, span, transportation, Washington, Washington state, WSDOT


Download Report:
Hallenbeck,M. E. WA-RD 112.2 Ferry Systems Data, Scheduling and Billing, Scheduling Systems Analysis 1987
Abstract:
This report describes the feasibility, costs and benefits of automating the vessel and crew scheduling functions of the Marine Division of the Washington State Department of Transportation. The project examined the needs of the Marine Division, reviewed its current procedures, and compared available commercial and public domain software packages. Some existing packages intended for use by the transit and airline industries offer promise, but all the packages examined require considerable modification to meet the needs of the Marine Division.

Authors:
Hallenbeck,M. E.

Keywords:
analysis, automated toll collection, automated vehicle identification, AVI, benefit, benefits, billing, cost, costs, crew scheduling, data, ferry, ferry system, ITS, marine, public, scheduling, scheduling systems, software, systems, transit, transportation, vessel, Washington, Washington state


Download Report:
Ritchie,S. G. WA-RD 083.1 Statewide Highway Data Rationalization Study 1986
Abstract:
This study involved an in-depth evaluation of the Washington State Department of Transportation highway data development and analysis activities. It developed statistically-based procedures and recommendations for a streamlined highway data collection program. Opportunities to reduce manpower and equipment costs, streamline work activities, improve the quality of data collection and provide accurate and timely data for the various users were identified. Given the focus on highway data, the major effort was devoted to the Department's traffic counting program. However, many data items and programs were considered, with the following receiving particular attention: traffic volume counting, including estimation of annual average daily traffic at any location throughout the state highway system; associated seasonal, axle and growth factors; vehicle classification; truck weights; and the relationship between the statistical sampling requirements recommended for these items and those associated with the FHWA Highway Performance Monitoring System in the state.

Authors:
Ritchie,S. G., Hallenbeck,M. E.

Keywords:
analysis, Annual, axle, cost, costs, data, data collection, developed, development, equipment, evaluation, highway, monitoring, performance, performance monitoring, program, quality, sampling, seasonal, Study, System, traffic, traffic counting, transportation, truck, vehicle classification, volume, Washington, Washington state, weight, weights


Download Report:
Peters,A. J. WA-RD 098.1 Hot Mix Recycling Evaluation In Washington State 1986
Abstract:
The Washington State Department of Transportation (WSDOT) has completed construction of twenty-four hot-mix recycle projects as of January, 1985. At the begining of this study there were sixteen completed projects that were to be examined. Evaluation of the laboratory and pavement performance data shows that WSDOT\'s initial two projects, Renslow to Ryegrass (1977) and Yakima River to West Ellensburg Interchange (1978), are still performing very we1l. Although the other fourteed projects have been constructed only within the last two and a half years, the early data indicates equally promising results. Because of the impressive pavement performance exhibited by the recycled pavements, together with hot-mix recycle benefits such as conservation of natural resources, feasibility of construction, and its cost advantage over new ACP, hot-mix recycling has become an attractive addition to the WSDOT paving program.

Authors:
Peters,A. J., Gietz,R. H., Walter,J. P.

Keywords:
asphalt, asphalt concrete, benefit, benefits, construction, cost, data, evaluation, ITS, pavement, pavement performance, pavements, performance, program, project, recycling, rejuvenating agents, Study, transportation, Washington, Washington state, WSDOT


Download Report:
Malsch,D. A. WA-RD 085.1 Evaluating The Effectiveness Of Liquid Anti-Strip Additives In Asphalt Cement 1986
Abstract:
The use of liquid anti-stripping additives (LAA) for reducing moisture damage in asphalt concrete pavements was evaluated using pavement cores from pairs of projects with-and-without LAA. Results were analyzed using the tensile strength ratio (TSR). In addition, a diazo-dye for determining the presence and concentration of LAA was attempted to access the value or the test as a field procedure. The chemical additive detection tests proved inclusive, but the TSR analysis gave a positive indication of the need for the use of LAA in the wetter environments of the state, For drier environments and for low traffic volumes, use of LAA may not be cost effective. The indirect tensile test was judged to be a potentially valuable tool for statewide use in the evaluation of stripping additive needs.

Authors:
Malsch,D. A.

Keywords:
additive, analysis, anti-stripping agents, asphalt, asphalt concrete, Asphalt Concrete pavement, bituminous concrete, Chemical, concrete, cost, cost effective, damage, detection, diazo-dye test, effectiveness, environment, evaluation, indirect tension test, moisture damage, pavement, pavement life, pavements, project, strength, stripping, tests, traffic, traffic volumes, volume


Download Report:
Limotti,Brian WA-RD 042.2 Response of Washington State Residents to Changing transit conditions 882 1984
Abstract:
This study was undertaken to measure and assess current transportation behavior, attitudes, and adjustments people have made or are planning to make to cope with higher costs of transportation and energy shortages. A secondary objective was to develop an effective and inexpensive system to collect a sizeable amount of multimodal data for various types of travel from a statistically reliable sample of modal data for various types of travel from a statistically reliable sample of households in the State of Washington. Telephone interviews of approximately 15 minutes in length were conducted with 2,500 households in 1980 and 2,000 homes in 1983, with both samples having a 95 percent confidence level. Residents of metropolitan, urban and rural areas were included. The households interviewed were selected by a random computer search of telephone numbers. Respondents were screened to ensure that an adult member (18 years or older) of the household was interviewed. The questionnaire dealt with the travel habits of the household rather than just the person being interviewed. Travel to work, local travel, long distance travel, recreational travel, use of public transit and other modes of travel, as well as vehicle ownership trends were topics covered in the interviews. The household's travel patterns two years prior to the interview, as well as current behavior and future plans were included. The replies to the questions indicated that people were concerned about transportation problems and were willing to provide detailed facts and opinions about their household's transportation behavior.

Authors:
Limotti,Brian, Iverson,Evan, Jacobson,Robert

Keywords:
attitudes, behavior, computer, condition, cost, costs, data, data collection, Energy, energy shortages, households, interviews, multimodal, planning, public, public transit, Recreational travel, ridership, rural, Surveys, System, transit, transportation, travel, travel patterns, urban, Washington, Washington state


Download Report:
Kulkarni,R. B. WA-RD 062.1 Feasibility Study of a Pavement Management System for Washington Counties 1984
Abstract:
The feasibility of adopting the Washington State Pavement Management System(WSPMS) for use by Washington counties was established. The WSPMS designoffers a great deal of flexibility for adjusting the system to satisfy thecounties needs. Some modifications to computer programs will be necessaryand can be accomplished with relatively modest effort. The major adjustmentswill be in those counties input data. The only data that are absolutelyessential are those for determining and evaluating pavement condition andthe most cost effective rehabilitation strategies.The state computer system has an adequate storage capacity to support usageof the WSPMS by a large number of counties. Dial-up capability i s availablefor use of WSPMS from remote terminals. Data processing hardware optionsavailable to counties range from no data processing equipment to stand alonecomputer system,A t r i a l demonstration is recommended, Two counties, one large with in-housecomputer f a c i l i t i e s and one small with no or minimal f a c i l i t i e s would bechosen to test the system.Significant. benefits are anticipated from the use of WSPMS. Washingtoncounties desiring to improve the process o f pavement management may findadopting and operating the WSPMS to feasible and desirable.

Authors:
Kulkarni,R. B., Finn,F. N., Lamot,A.

Keywords:
benefit, benefits, computer, computer program, condition, cost, cost effective, counties, data, design, equipment, maintenance, management, management system, Operating, pavement, pavement condition, pavement management, pavement repair, program, rehabilitation, Study, System, Washington, Washington state


Download Report:
Nelson,T. L. WA-RD 050.3 Development And Implementation Of Washington State's Pavement System - Executive Summary 1983
Abstract:
This report summarizes the pavement management system developed by WSDOT staff over a period of five years. Included is a description of what the system does in terms of the considerable amount of useful output data produced. A discussion is given on how the system was developed, what the pavement rating procedures involve and cost, what computer requirements are, and what typical data processing costs are. The report concludes with comments on how other agencies can use the Washington State Pavement Management System.

Authors:
Nelson,T. L., LeClerc,R. V.

Keywords:
agencies, computer, cost, costs, data, developed, development, Executive, Executive Summary, management, management system, pavement, pavement data file, pavement management, pavement performance, System, Washington, Washington state, WSDOT


Download Report:
Kiernan,K. WA-RD 060.1 Recreational vehicle waste disposal stations at highway rest areas 1983
Abstract:
A study of recreational vehicle waste disposal at highway rest areas was conducted from RV wastewater is significantly stronger than wastewater in BOD, COD, and suspended solids. It also contains preservative compounds, most of which contain formaldehyde or a formaldehyde derivative. With adequate dilution, these wastes should not interfere with waste by mixed cultures of aerobic or anaerobic bacteria or There that waste treatment facilities be affected by improper use of the disposal stations, such as for disposal of hazardous wastes. In addition, improper use may lead to temporary unsanitary conditions around the station. Equations to estimate disposal station use and loading factors, and design equations for treatment of wastes are presented. The public perceives the stations to be and cost-effective provided they are paid for by RV owners. RV owners are willing to pay an annual fee which will cover the costs of construction, operation and maintenance of the stations.

Authors:
Kiernan,K., Brown,C., Benjamin,M., Ferguson,J. F.

Keywords:
Annual, biological waste treatment, condition, construction, cost, cost effective, costs, design, disposal, equations, facilities, fee, Formaldehyde Toxcity, Hazardous, hazardous wastes, highway, maintenance, public, recreational vehicles, rest area, rest areas, Study, suspended solids


Download Report:
Public Transportation and Planning Division WA-RD 045.2 Impacts Of Trucks And Railroad Deregulation On Transportation Operation And Economic Activity In The State Of Washinton ... 1982
Abstract:
The Motor Carrier Act of 1980 and the Staggers Act of 1980 have partially set aside decades of rigid regulations of interstate freight movement. These actions have the potential to bring forth significant changes to the networks of interstate freight transportation. The object of this research was to ascertain the impacts of deregulation of the Washington State transportation system. Information was obtained by surveying and interviewing shippers and freight transportation providers throughout the state. Anticipated impacts, e.g. accelerated rail abandonment or lost of motor carrier service to small communities were not present. The study reflects a relative increase in truck service and decrease in rail service since deregulation. Indications are this may be further amplified in certain regions of the state. The study recommends that potential highway impacts be incorporated into pavement management systems. Transportation officials are enjoined to treat issues relative to truck size and weight, highway cost allocation and deregulation as a single issue. Also, the Local Rail Service Assistance Program should be considered for use to offset any adverse impacts resulting from deregulation. During this period of the study, general economic conditions were poor. This resulted in a decrease in freight shipments and would suggest that some impacts of deregulation have been suppressed.

Authors:
Public Transportation and Planning Division, Washington State Department of Transportation

Keywords:
condition, cost, Deregulation, freight, highway, highway impacts, impact, impacts, management, management system, management systems, motor carrier, networks, pavement, pavement management, pavement management systems, program, rail service, railroads, regulation, research, System, systems, transportation, truck, trucking, trucks, Washington, Washington state, weight


Download Report:
Nelson,Thomas L. WA-RD 050.1 Development And Implementation Of Washington State's Pavement System 905 1982
Abstract:
This report describes the pavement management system developed by WSDOT staff over a period of five years. Both project-level and network-level pavement management are represented within the four broad areas of data processing which combine to constitute the foundation of the system.The design of a pavement data file is laid out together with the process of assembling it. Also shown are the methods used to analyze and convert the file data from pavement condition ratings to pavement performance curves for each project. The performance curves are then used, together with appropriate cost data, to determine the most cost-effective type and time to fix. The network-level program then summarized the need work for each year of a rehabilitation program. Mean are provided for adjusting the program to fit budget constraints or minimum acceptable levels of average pavement condition.It is concluded that the system, operating on biennial pavement condition ratings, provides a good solid framework for orderly analysis to estimate the economic benefits of the type, timing, and sequence of rehabilitation activities applied to a pavement.

Authors:
Nelson,Thomas L., LeClerc,R. V.

Keywords:
analysis, benefit, benefits, condition, cost, data, design, developed, development, foundation, framework, management, management system, methods, Operating, pavement, pavement condition, pavement data file, pavement management, pavement performance, performance, program, project, rehabilitation, System, Washington, Washington state, WSDOT


Download Report:
Nelson,Thomas L. WA-RD 050.2 Development And Implementation Of Washington State's Pavement System - Summary 906 1982
Abstract:
This report describes the pavement system developed by staff over a period of five years. Both project-level and network-level pavement are represented within the four broad areas of data processing which combine to constitute the foundation of the system. The design of a pavement data file is laid out together with the process of assembling it. Also shown are the methods used to analyze and convert the file data pavement condition ratings to pavement performance curves for each project. The performance curves are then used, together with appropriate cost data, to determine the most cost-effective type and of fix. The network-level program then the needed work for each year of a rehabilitation program. Means are provided for adjusting the program to fit budget constraints or acceptable levels of average pavement condition It is concluded that the system, operating on biennial pavement condition ratings, provides a good solid framework for orderly analysis to estimate the economic benefits of the type, timing, and sequence of rehabilitation activities apply to a pavement.

Authors:
Nelson,Thomas L., LeClerc,R. V.

Keywords:
analysis, benefit, benefits, condition, cost, cost effective, data, design, developed, development, foundation, framework, management, management system, methods, Operating, pavement, pavement condition, pavement data file, pavement management, pavement performance, performance, program, project, rehabilitation, System, Washington, Washington state, WSDOT


Download Report:
Anderson,K. W. WA-RD 046.1 Permanent Lane Markings - Recessed Edge Stripe 1981
Abstract:
The project goal was to evaluate different methods of cutting recessed skip stripe grooves, and to evaluate various pavement marking materials placed into the recesses. The project objective was to find a marking system for our mountain pass highways that would tolerate snowplowing and sanding operations, studded tires, and chain wear.Three methods of pavement grooving and three types of making material were evaluated over a four-year period. The grooving methods were evaluated with regard to production rate, the quality of the finished groove, and cost. The marking materials were checked for ease of installation, cost durability, and visibility.Only one method of grooving was found that produced the desired recess shape at a reasonable cost and in a timely manner. All three of the making materials were durable enough to survive for three years, but none produced the desired wet-daytime or wet-night visibility needed for adequate lane delineation. This loss of visibility under wet conditions was due to the lack of retroreflectance from the marking materials.

Authors:
Anderson,K. W.

Keywords:
chains, condition, cost, delineation, durability, grooves, grooving, highway, highway delineation, Highways, lane lines, materials, methods, night visibility, pavement, project, quality, rainfall, retroreflectance, snowplows, striping, studded tire, studded tires, System, tire, tires, Traffic markings


Download Report:
Clark,David L. WA-RD 039.4 Composite Sampling Of Highway Runoff Year Two, Interim Report 935 1980
Abstract:
A composite sampling device was developed that can be installed at less than ten percent of the cost of automatic sampling systems currently used in Federal highway runoff studics. This dcvi ce was operated for one year, along-side an automatic sampler at the 1-5 side, to demonstrate that the two systems provide statistically identical storm composites.

Authors:
Clark,David L., Mar,B. W.

Keywords:
cost, developed, highway, highway runoff, Interim, runoff, sampling, System, systems, Water Pollutants, Washington State Monitoring


Download Report:
Chaplin,Bernard L. WA-RD 029.1 Native Vegetatioin Development 956 1977
Abstract:
A five-year study was initiated in 1972 to study propagation procedures, artificial soil mixes and season of planting for two types of tube ling containers. A cost comparison, based on plant survival was also made between plant materials grown in the two types of tube ling containers.

Authors:
Chaplin,Bernard L.

Keywords:
cost, development, Landscape plant establishment, materials, plant survival, season, soil, Tubelings


Download Report:
Rossano,A. T. WA-RD 012.1 A Critical Review Of Mathematical Diffusion Modeling Techniques For Predicting Air Quality With Relation To Motor Vehicl... 1973
Abstract:
Federal and State laws require highway departments to prepare statements assessing the impact that proposed highway improvements or construction may have on the environment. An important consideration in the preparation of an impact statement is the anticipated effect the proposed activity will have on air quality since highway transportation is a source of several major air pollutants: particulate matter, nitrogen oxides, carbon monoxide, hydrocarbons, and photochemical oxidants which are formed in the atmosphere in the presence of sunlight. Comprehensive physical studies to predict the air quality impact at proposed sites are generally prohibitive due to the time required to obtain suitable data, the cost of such studies and the number of impact statements that must be considered by most highway departments.Methods have been developed to predict the air quality impact of new highway construction through the use of mathematical atmospheric diffusion models. Once they are properly calibrated these models can be used to test alternative locations and designs. Basically models use meteorological conditions and emission rates to predict downwind concentrations as illustrated in Figure 1.The principal objective of this research project has been to conduct a search of the literature to identify state-of-the-art air quality predictive schemes applicable to motor vehicle transportation. The available models have been analyzed in detail and evaluated in terms of selected characteristics that serve to describe the predictive capabilities of each. Limitations in the models have also been noted where appropriate.Section 2.0 o f this report describes the methods used in conducting the research. Sections 3.0 and 4.0 present the models analyzed and a general discussion of applicability, in both narrative and tabular form. Section 5.0 summarizes the study and presents the recommendations for future consideration.

Authors:
Rossano,A. T., Lamb,Donna V., Badgley,Franklin

Keywords:
air quality, Alternative, carbon monoxide, Concentrations, condition, construction, cost, data, design, environment, highway, highway construction, Highways, hydrocarbons, impact, model, modeling, models, nitrogen, particulate matter, Pollutants, quality, research, state-of-the-art, transportation, Washington, Washington state


Download Report:
Van Zandt,E. Jack WA-RD 002.1 Guidelines For Joint Development On State Highway Transportation Ways 1001 1972
Abstract:
The objective of this study was to present criteria and procedures for evaluation of Joint Development (JD) above, below, or beside s t a t e highways. Application of the procedures a re-illustrated over a wide range of joint development situations, both (1) for establishing state or local J D policy, and (2) for making decisions about JD projects in a more timely and comprehensive manner, and in a way that will contribute toward improving the quality or urban life or the enhancement of rural environments. The approach taken in the Guidelines is sequential, systematic, and interdisciplinary; that is, it uses a series of successively more detailed and comprehensive planning and evaluation procedures for JD decision-making, relying on a wide range of specified physical, economic, social, and legal criteria. In use, the Guidelines envision a three- stage planning and evaluation process:(1) identification of the need or potential for J D projects, (2) comparison of project proposals against policies, criteria and standards designed t o avoid or minimize negative impacts and increase favorable impacts; and (3) refined definition of costs and benefits when warranted.

Authors:
Van Zandt,E. Jack

Keywords:
benefit, benefits, cost, costs, criteria, development, Enviromental impact, environment, evaluation, highway, Highway planning, Highways, impact, impacts, joint development, Multiple use, planning, policy, quality, rural, urban


Download Report:
Van Zandt,E. Jack WA-RD 002.1A Guidelines For Joint Development On State Highway Transportation Ways Research Project - Interstate 5 Cases - Supplement... 1972
Abstract:
The objective of this study was to present criteria and procedures for evaluation of Joint Development (JD) above, below, or beside state highways. Application of the procedures are illustrated over a wide range of joint development situations, both (1) for establishing state or local JD policy, and (2) for making decisions about JD projects in a more timely and comprehensive manner, and in a way that will contribute toward iwro;ing the quality of urban life or the enhancement of rural environments. The approach taken in the Guidelines is sequential, systematic, and interdisciplinary; that is, it uses a series of successively more detailed and comprehensive planning and evaluation procedures for JD decision making relying on a wide range of specified physical, economic, social and legal criteria. In use, the Guidelines envision a three-stage planning and evaluation process:(1) identification of the need or potential for JD projects; (2) comparison of project proposals against policies, criteria, and standards designed to avoid or minimize negative impacts and increase favorable impacts; and (3) refined definition of costs and benefits when warranted. This supplement to the Guidelines report (described above) presents the results of analyzing seven actual JD proposals, located along Interstate 5 in the State of Washington, according to the procedures suggested in the Guidelines,

Authors:
Van Zandt,E. Jack

Keywords:
benefit, benefits, cost, costs, criteria, development, environment, evaluation, highway, Highways, impact, impacts, joint development, Joint Development, Multiple Use, Highway Planning, Enviromental Impact, planning, policy, quality, research, rural, transportation, urban, Washington


Download Report:
Seabloom,Robert W. WA-RD 009.4 Rest Area Wastewater Disposal 1005 1972
Abstract:
A study was conducted of rest area wastewater disposal problems and related factors for the Washington State Highway Commission during the period of June - December 1971. This report on the study is intended to present an evaluation of present rest area wastewater systems together with feasibility analyses of alternative methods of waste handling. It is not intended to be a preliminary engineering design report.Data are presented on rest area problems as reported to or observed by the writers on field visitations. This is followed by discussions of criteria and standards presently used in rest area design together with data on water usage for those rest areas where "complete" data were available. Laboratory analyses were made on rest area wastewaters and on a certain additive, " Bacterial Waste Disposer", that has been used in some of the rest areas. A discussion is included on possible future trends and uses of rest areas and the need to minimize water usage. Chapter XI1 contains the principal thrust of the report in its discussion of possible rest area wastewater disposal methods with an evaluation and some relative cost data. With increasingly stringent requirements for wastewater disposal, it seems apparent that rest area wastewaters must continue to be disposed of on highway property. If not, the Department would find itself, in most instances, with the task of operating continuously and effectually some rather complicated treatment systems that require trained operators, operational reports and effluent analyses, and systems that are not usually amenable to the flow characteristics of rest area wastewaters. Since much national attention is being given to these problems, it is hoped that new or improved treatment schemes may be developed in the future that will be appropriate for rest areas. An intent of this study has thus been to suggest means of wastewater disposal, presently available that would offer an improvement to the septic tank drain field method of disposal.Conclusions and recommendations drawn from the study are as follows:1. There is no question but that septic tank- drain field disposal systems would, because of their simplicity, be the preferred method of disposal if their installation were applicable to most rest areas and if they would, from past experiences here and elsewhere give some assurance of a freedom from operating difficulties over a period of just a few years.

Authors:
Seabloom,Robert W.

Keywords:
additive, Alternative, cost, criteria, data, design, developed, disposal, evaluation, flow, highway, improvement, ITS, methods, Operating, rest area, rest areas, Study, System, systems, Washington, Washington state


Download Report:
Sylvester,R. O. WA-RD 027.1 A Study Of Wastewater Handling, Holding and Disposal From Washington State Ferries 953
Abstract:
Alternatives to control wastewater odors on board Washington State ferries and during discharge of the wastewater to sewerage systems were formulated, evaluated and tested.Holding tank aeration, using compressed air injection to a recycle line is an effective method. Sulfide is microbially oxidized, and anaerobic sulfate reducing bacteria are suppressed. Engineering and lab studies and a simulation model of the process were used to estimate suitable design parameters and costs. A prototype installation is recommended for optimization of operation. The addition of slug dosages of H202 was also found to be effective in laboratory and on-board vessels. The twice daily dose of about 50 mg/ should be stirred into the holding tank using recycle mixing. Peroxide was found to oxidize sulfide, increase dissolved oxygen and suppress sulfate reducing bacteria. Bottom suction sludge hoppers must be installed to prevent accumulation of sludge in tank bottom.Other alternatives, including chlorine addition, pH increase, iron sulfide precipitation and toxic odor control compounds, were found ineffective and/or uneconomic.Other finds are that sulfide is produced primarily from reduction of sulfates from the saltwater flushing water. Production is primarily in the slime layer on the bottom and sides of the holding tanks. On-shore force mains are sites of sulfide production during stagnant periods between tank pumpouts. These force mains should tanks was evaluated for hydraulic, organic loading, and salt toxicity effects on existing and planned sewage plants. No significant impacts were found.

Authors:
Sylvester,R. O., Ferguson,J. F., Parish,K. B., Brown,D. W., Leuelid,S.

Keywords:
control, cost, costs, design, disposal, dissolved oxygen, effects, ferries, ferry, impact, impacts, line, Marine wastewater holding tanks, odor control, wastewater aeration, hydrogen peroxide, model, Precipitation, salt, sewerage, Study, System, systems, Toxicity, vessel, vessels, Washington, Washington state


Download Report:

Previous Next


TRAC