TRAC Reports
To sort the reports, click on a heading: Authors, Report #, Report Title, Year, or Publisher.
To download a report's pdf or see the abstract, click on the report.
Search returned 33 reports containing keyword: 'developed'
clear results
Previous |
Search
|
Next |
Authors |
Report # |
Report Title |
Year |
Publisher |
---|
Pearson,W. H. | WA-RD 614.1 | Protocols for Evaluation of Upstream Passage of Juvenile Salmonids in an Experimental Culvert Test Bed | 2005 | WSDOT |
Abstract:
The Washington State Department of Transportation (WSDOT) and its partner agencies developed a research program to design new and retrofit culverts. The goal of this program is to identify culvert bed configurations, designs, and associated hydraulic conditions that allow successful movement of juvenile salmonids upstream, while safely passing water, sediment, and debris downstream. WSDOT, in cooperation with the Washington Department of Fish and Wildlife (WDFW), constructed a culvert test bed at the WDFS's Skookumchuck Hatchery in western Washington State. Battelle conducted experiments to establish protocols for future research on bed conditions, culvert shape, etc. This technical report describes various protocols, such as time of day, duration of test, and density of test fish, and provides hydraulic and biological characterizations of a baseline culvert.
Authors:
Pearson,W. H., Richmond,M., Johnson,G., Sargeant,S. L.
Keywords:
agencies, condition, culvert, culvert passage, culvert test bed, culverts, density, design, developed, evaluation, experimental, fish, ITS, juvenile salmonid, juvenile salmonid passage, program, research, retrofit, salmonids, transportation, Washington, Washington state, wildlife, WSDOT
The Washington State Department of Transportation (WSDOT) and its partner agencies developed a research program to design new and retrofit culverts. The goal of this program is to identify culvert bed configurations, designs, and associated hydraulic conditions that allow successful movement of juvenile salmonids upstream, while safely passing water, sediment, and debris downstream. WSDOT, in cooperation with the Washington Department of Fish and Wildlife (WDFW), constructed a culvert test bed at the WDFS's Skookumchuck Hatchery in western Washington State. Battelle conducted experiments to establish protocols for future research on bed conditions, culvert shape, etc. This technical report describes various protocols, such as time of day, duration of test, and density of test fish, and provides hydraulic and biological characterizations of a baseline culvert.
Authors:
Pearson,W. H., Richmond,M., Johnson,G., Sargeant,S. L.
Keywords:
agencies, condition, culvert, culvert passage, culvert test bed, culverts, density, design, developed, evaluation, experimental, fish, ITS, juvenile salmonid, juvenile salmonid passage, program, research, retrofit, salmonids, transportation, Washington, Washington state, wildlife, WSDOT
|
http://www.wsdot.wa.gov/research/reports/fullreports/614.1.pdf http://wsdot.wa.gov/Research/Reports/600/614.1.htm |
Kopf,J. | WA-RD 619.1 | Measurement of Recurring and Non-Recurring Congestion: Phase 2 | 2005 | TRAC/UW |
Abstract:
In 2003, the Washington State Department of Transportation (WSDOT) initiated a research effort to develop and test a methodology for estimating congestion delay on Seattle area freeways. The initial phase of the research developed a preliminary methodology for both measuring congestion and assigning that congestion to specific lane blocking incidents. In Phase 2 of this study, that methodology was automated and extended to include an examination of the effects of incidents occurring on the shoulders of the freeway, spillback from incident-caused congestion on one freeway that affects a second freeway that feeds traffic onto the initially congested facility, special events, and weather. Because funding for this effort was extremely limited, only three corridors (with both directions analyzed independently) and two months of data were analyzed. The project found that the Phase 1 methodology works well in assigning traffic congestion that occurs in the immediate time frame and geographic location of incidents to those incidents. It also showed that this process can be automated, making the data preparation effort now the primary determinant of the cost of additional work of this kind. Unfortunately, even with the addition of shoulder incidents, special events, and weather to lane blocking events, the automated process is unable to assign a significant proportion of the non-recurring delay occurring on Seattle freeways. The detailed analysis of freeway performance showed that much of the delay caused by specific incidents occurs in places or at times removed from the incident itself. The result is that much of the observed non-recurring delay can not be assigned to specific causes by the current analytical process. New analytical procedures will need to be developed in Phase 3 of this work. The Phase 2 analysis also confirmed that the congestion effects of specific incidents and other traffic disruptions are highly dependent on the background traffic conditions at the time of the disruption. While the Phase 2 analysis did not produce all of the results desired, the additional analyses showed that the summary statistics output from the Phase 2 software are useful as input to other analytical procedures.
Authors:
Kopf,J., Nee,J., Ishimaru,J. M., Hallenbeck,M. E.
Keywords:
congestion causes, freeway performance, traffic congestion, Washington, Washington state, transportation, WSDOT, research, methodology, congestion, seattle, freeway, developed, incident, Study, effects, traffic, facilities, corridors, data, project, cost, analysis, performance, in-place, condition, statistics, software
In 2003, the Washington State Department of Transportation (WSDOT) initiated a research effort to develop and test a methodology for estimating congestion delay on Seattle area freeways. The initial phase of the research developed a preliminary methodology for both measuring congestion and assigning that congestion to specific lane blocking incidents. In Phase 2 of this study, that methodology was automated and extended to include an examination of the effects of incidents occurring on the shoulders of the freeway, spillback from incident-caused congestion on one freeway that affects a second freeway that feeds traffic onto the initially congested facility, special events, and weather. Because funding for this effort was extremely limited, only three corridors (with both directions analyzed independently) and two months of data were analyzed. The project found that the Phase 1 methodology works well in assigning traffic congestion that occurs in the immediate time frame and geographic location of incidents to those incidents. It also showed that this process can be automated, making the data preparation effort now the primary determinant of the cost of additional work of this kind. Unfortunately, even with the addition of shoulder incidents, special events, and weather to lane blocking events, the automated process is unable to assign a significant proportion of the non-recurring delay occurring on Seattle freeways. The detailed analysis of freeway performance showed that much of the delay caused by specific incidents occurs in places or at times removed from the incident itself. The result is that much of the observed non-recurring delay can not be assigned to specific causes by the current analytical process. New analytical procedures will need to be developed in Phase 3 of this work. The Phase 2 analysis also confirmed that the congestion effects of specific incidents and other traffic disruptions are highly dependent on the background traffic conditions at the time of the disruption. While the Phase 2 analysis did not produce all of the results desired, the additional analyses showed that the summary statistics output from the Phase 2 software are useful as input to other analytical procedures.
Authors:
Kopf,J., Nee,J., Ishimaru,J. M., Hallenbeck,M. E.
Keywords:
congestion causes, freeway performance, traffic congestion, Washington, Washington state, transportation, WSDOT, research, methodology, congestion, seattle, freeway, developed, incident, Study, effects, traffic, facilities, corridors, data, project, cost, analysis, performance, in-place, condition, statistics, software
|
http://www.wsdot.wa.gov/research/reports/fullreports/619.1.pdf http://wsdot.wa.gov/Research/Reports/600/619.1.htm |
Hill,K. | WA-RD 621.1 | Roadside Vegetation Management Study: Literature Review, Interview Summaries, and Decision Framework | 2005 | TRAC/UW |
Abstract:
This study was conducted for the Washington State Department of Transportation (WSDOT) to explore both the need for and the variety of alternatives to the use of an annual application of herbicides for removing vegetation in the area immediately adjacent to the pavement edge. Our study approached these questions in two different ways, developing both a literature review and a set of interviews with people who have specific knowledge or views of these issues. We conducted interviews with three groups of people to identify issues, maintenance alternatives, and significant literature references: (1) staff at other federal, state, and county transportation agencies, (2) staff and volunteers who work with advocacy groups, and (3) researchers at academic institutions who specialize in related areas. Our literature review contains a set of citations that present related management issues and alternative practices. The abstracts for these references were included when available. To summarize what we learned from the interviews and literature sources, we developed a decision framework that could be used to guide WSDOT district maintenance staff in formulating management plans for vegetation. The decision framework differs from current practice primarily in that it begins with the assumption that maintenance of the area immediately adjacent to the pavement is not necessary unless some particular, observable condition triggers the need for such maintenance.
Authors:
Hill,K., Horner,R. R.
Keywords:
agencies, Alternative, Annual, best practices, condition, counties, developed, environmental management, framework, group, herbicides, integrated vegetation management (IVM), interviews, Issues, maintenance, management, pavement, pavement edge, research, review, road ecology, roadside, roadside maintenance, roadside vegetation, Study, transportation, vegetation management, Washington, Washington state, weeds, WSDOT, Zone 1
This study was conducted for the Washington State Department of Transportation (WSDOT) to explore both the need for and the variety of alternatives to the use of an annual application of herbicides for removing vegetation in the area immediately adjacent to the pavement edge. Our study approached these questions in two different ways, developing both a literature review and a set of interviews with people who have specific knowledge or views of these issues. We conducted interviews with three groups of people to identify issues, maintenance alternatives, and significant literature references: (1) staff at other federal, state, and county transportation agencies, (2) staff and volunteers who work with advocacy groups, and (3) researchers at academic institutions who specialize in related areas. Our literature review contains a set of citations that present related management issues and alternative practices. The abstracts for these references were included when available. To summarize what we learned from the interviews and literature sources, we developed a decision framework that could be used to guide WSDOT district maintenance staff in formulating management plans for vegetation. The decision framework differs from current practice primarily in that it begins with the assumption that maintenance of the area immediately adjacent to the pavement is not necessary unless some particular, observable condition triggers the need for such maintenance.
Authors:
Hill,K., Horner,R. R.
Keywords:
agencies, Alternative, Annual, best practices, condition, counties, developed, environmental management, framework, group, herbicides, integrated vegetation management (IVM), interviews, Issues, maintenance, management, pavement, pavement edge, research, review, road ecology, roadside, roadside maintenance, roadside vegetation, Study, transportation, vegetation management, Washington, Washington state, weeds, WSDOT, Zone 1
|
http://www.wsdot.wa.gov/research/reports/fullreports/621.1.pdf http://wsdot.wa.gov/Research/Reports/600/621.1.htm |
Hieber,D. G. | WA-RD 611.1 | Precast Concrete Pier Systems for Rapid Construction of Bridges in Seismic Regions | 2005 | TRAC/UW |
Abstract:
Increasing traffic volumes and a deteriorating transportation infrastructure have stimulated the development of new systems and methods to accelerate the construction of highway bridges. Precast concrete bridge components offer a potential alternative to conventional reinforced, cast-in-place concrete components. The use of precast components has the potential to minimize traffic disruptions, improve work zone safety, reduce environmental impacts, improve constructability, increase quality, and lower life-cycle costs. This study compared two precast concrete bridge pier systems for rapid construction of bridges in seismic regions. One was a reinforced concrete system, in which mild steel deformed bars connect the precast concrete components and provide the flexural strength of the columns. The other was a hybrid system, which uses a combination of unbonded post-tensioning and mild steel deformed bars to make the connections. A parametric study of the two types of systems was conducted using nonlinear finite element models to investigate the global response and likelihood of damage for various frame configurations. On the basis of this study, a practical method was developed to estimate maximum seismic displacements from the cracked section properties of the columns, the elastic design displacement response spectrum, and the base-shear strength ratio. The results of the global nonlinear finite element analyses suggest that the systems have the potential for good seismic performance. Further analytical and experimental research is needed to investigate the constructability and seismic performance of the connection details.
Authors:
Hieber,D. G., Wacker,J. M., Eberhard,M. O., Stanton,J. F.
Keywords:
Alternative, bridge, bridges, columns, concrete, concrete bridge, connections, constructability, construction, cost, costs, damage, design, developed, development, environmental, environmental impact experimental, finite element, highway, impact, impacts, infrastructure, methods, models, performance piers, precast, precast concrete, prestressed concete, quality, Rapid construction, Regions, reinforce concrete, research, response spectra, response spectrum, safety, seismic, seismic performance, steel strength, Study, substructures, System, systems, traffic, traffic volumes, trasportation, volume
Increasing traffic volumes and a deteriorating transportation infrastructure have stimulated the development of new systems and methods to accelerate the construction of highway bridges. Precast concrete bridge components offer a potential alternative to conventional reinforced, cast-in-place concrete components. The use of precast components has the potential to minimize traffic disruptions, improve work zone safety, reduce environmental impacts, improve constructability, increase quality, and lower life-cycle costs. This study compared two precast concrete bridge pier systems for rapid construction of bridges in seismic regions. One was a reinforced concrete system, in which mild steel deformed bars connect the precast concrete components and provide the flexural strength of the columns. The other was a hybrid system, which uses a combination of unbonded post-tensioning and mild steel deformed bars to make the connections. A parametric study of the two types of systems was conducted using nonlinear finite element models to investigate the global response and likelihood of damage for various frame configurations. On the basis of this study, a practical method was developed to estimate maximum seismic displacements from the cracked section properties of the columns, the elastic design displacement response spectrum, and the base-shear strength ratio. The results of the global nonlinear finite element analyses suggest that the systems have the potential for good seismic performance. Further analytical and experimental research is needed to investigate the constructability and seismic performance of the connection details.
Authors:
Hieber,D. G., Wacker,J. M., Eberhard,M. O., Stanton,J. F.
Keywords:
Alternative, bridge, bridges, columns, concrete, concrete bridge, connections, constructability, construction, cost, costs, damage, design, developed, development, environmental, environmental impact experimental, finite element, highway, impact, impacts, infrastructure, methods, models, performance piers, precast, precast concrete, prestressed concete, quality, Rapid construction, Regions, reinforce concrete, research, response spectra, response spectrum, safety, seismic, seismic performance, steel strength, Study, substructures, System, systems, traffic, traffic volumes, trasportation, volume
|
http://www.wsdot.wa.gov/research/reports/fullreports/611.1.pdf http://wsdot.wa.gov/Research/Reports/600/611.1.htm |
Al-Yagout, M.A. | WA-RD 600.1 | Improving Traffic Characterization to Enhance Pavement Design and Performance: Load Spectra Development | 2005 | TRAC/UW |
Abstract:
This research addresses the understanding of, and need for, load spectra in future pavement design procedures and as a stepping stone toward more complete pavement design. The primary objective of this project was to develop truck axle load spectra for Washington State. To do this, axle load data collected at WIM stations throughout Washington State were used. The developed load spectra encompass the principal truck axles on the roadway network: single, tandem, and tridem. Achieving this objective allows the Washington State Department of Transportation, or any state highway agency with analogous traffic patterns, to accommodate the requirements of the 2002 Design Guide, developed through NCHRP Project 1-37A. A secondary objective of this project was to determine whether ESALs obtained from the developed load spectra are significantly different from historical values. Because the developed load spectra are transformable to ESALs, state highway agencies that decide not to use the new guide can still choose to employ the ESALs produced with the load spectra. The project concluded that the developed load spectra are reasonable. For single axles they are comparable to the 2002 Design Guide and MnROAD defaults. For tandem and tridem axles, they are slightly more conservative than defaults of the 2002 Design Guide and MnROAD, but they are still within reason. In addition, the ESALs per vehicle class associated with the developed load spectra are comparable to Washington State historical ESALs for vehicle classes 9, 10, and 13. The use of the newly developed ESALs per vehicle will generally increase design ESALs, but that increase will be due to inclusion of the less predominant vehicle classes (4, 6, 7, 8, and 11).
Authors:
Al-Yagout, M.A., Mahoney, J. P., Pierce, L., Hallenbeck, M.E.
Keywords:
Agencies, axle, data, design, developed, development, equivalent single axel load, ESAL, highway, load spectra, pavement, pavement design, performance, project, research, roadway, single axle, traffic, transportation, truck, Washington, Washington state, weigh-in-motion, WIM
This research addresses the understanding of, and need for, load spectra in future pavement design procedures and as a stepping stone toward more complete pavement design. The primary objective of this project was to develop truck axle load spectra for Washington State. To do this, axle load data collected at WIM stations throughout Washington State were used. The developed load spectra encompass the principal truck axles on the roadway network: single, tandem, and tridem. Achieving this objective allows the Washington State Department of Transportation, or any state highway agency with analogous traffic patterns, to accommodate the requirements of the 2002 Design Guide, developed through NCHRP Project 1-37A. A secondary objective of this project was to determine whether ESALs obtained from the developed load spectra are significantly different from historical values. Because the developed load spectra are transformable to ESALs, state highway agencies that decide not to use the new guide can still choose to employ the ESALs produced with the load spectra. The project concluded that the developed load spectra are reasonable. For single axles they are comparable to the 2002 Design Guide and MnROAD defaults. For tandem and tridem axles, they are slightly more conservative than defaults of the 2002 Design Guide and MnROAD, but they are still within reason. In addition, the ESALs per vehicle class associated with the developed load spectra are comparable to Washington State historical ESALs for vehicle classes 9, 10, and 13. The use of the newly developed ESALs per vehicle will generally increase design ESALs, but that increase will be due to inclusion of the less predominant vehicle classes (4, 6, 7, 8, and 11).
Authors:
Al-Yagout, M.A., Mahoney, J. P., Pierce, L., Hallenbeck, M.E.
Keywords:
Agencies, axle, data, design, developed, development, equivalent single axel load, ESAL, highway, load spectra, pavement, pavement design, performance, project, research, roadway, single axle, traffic, transportation, truck, Washington, Washington state, weigh-in-motion, WIM
|
http://www.wsdot.wa.gov/research/reports/fullreports/600.1.pdf http://wsdot.wa.gov/Research/Reports/600/600.1.htm |
Rowland,E. R. | WA-RD 545.1 | Modeling Hydrology For Design Of Fish Passage Structures 50 | 2002 |
Abstract:
An estimated 2,400 to 4,000 hydraulic structures are barriers to fish passage in Washington State. Many are culverts inadequately sized for fish Recently, the Washington Department of Fish and Wildlife established statewide guidelines to incorporate fish migration into culvert design by providing two approaches: stream simulation and hydraulic design. Stream simulation involves culverts to be wider than the natural channel under bank-full conditions. The hydraulic design option requires culverts to satisfy minimum depth and maximum hydraulic drop constraints ranging from 0.8 to 1.0 A and permissible velocities from 2.0 to 6.0 depending on species and culvert length. The permissible velocity criterion is to be met during fish passage design flow. A new model is presented for fish passage design flows at streams in Eastern Washington. The model is founded on two key concepts: a unique definition of fish passage design flow and an area based approach for estimating flow at ungaged streams. The fish design flow was developed by combining the concepts of allowable fish delay, established to be 3 days, with a consecutive day analysis. This design flow ensures that fish are not delayed for than 3 consecutive days during a water year. A fish passage design flow per area is assigned to previously delineated subwatersheds in Eastern Washington. Similarity relationships, derived basin characteristics, relate Geological Survey gaging stations to sub-watersheds in Eastern Washington. These relationships form the basis for a value of fish passage design flow per unit area to each sub-watershed in Eastern Washington. The percent standard error for this model was calculated as 36%. This is a significant improvement the 75% standard error calculated for the model that previously addressed fish passage design flows in Eastern Washington.
Authors:
Rowland,E. R., Hotchkiss,R. H., Barber,M. E.
Keywords:
analysis, barrier, barriers, Channel, condition, culvert, design, design flows, developed, Error, fish, fish passage, flow, hydrologic models, improvement, model, modeling, structural safety, structures, survey, velocity, Washington, Washington state, wildlife
An estimated 2,400 to 4,000 hydraulic structures are barriers to fish passage in Washington State. Many are culverts inadequately sized for fish Recently, the Washington Department of Fish and Wildlife established statewide guidelines to incorporate fish migration into culvert design by providing two approaches: stream simulation and hydraulic design. Stream simulation involves culverts to be wider than the natural channel under bank-full conditions. The hydraulic design option requires culverts to satisfy minimum depth and maximum hydraulic drop constraints ranging from 0.8 to 1.0 A and permissible velocities from 2.0 to 6.0 depending on species and culvert length. The permissible velocity criterion is to be met during fish passage design flow. A new model is presented for fish passage design flows at streams in Eastern Washington. The model is founded on two key concepts: a unique definition of fish passage design flow and an area based approach for estimating flow at ungaged streams. The fish design flow was developed by combining the concepts of allowable fish delay, established to be 3 days, with a consecutive day analysis. This design flow ensures that fish are not delayed for than 3 consecutive days during a water year. A fish passage design flow per area is assigned to previously delineated subwatersheds in Eastern Washington. Similarity relationships, derived basin characteristics, relate Geological Survey gaging stations to sub-watersheds in Eastern Washington. These relationships form the basis for a value of fish passage design flow per unit area to each sub-watershed in Eastern Washington. The percent standard error for this model was calculated as 36%. This is a significant improvement the 75% standard error calculated for the model that previously addressed fish passage design flows in Eastern Washington.
Authors:
Rowland,E. R., Hotchkiss,R. H., Barber,M. E.
Keywords:
analysis, barrier, barriers, Channel, condition, culvert, design, design flows, developed, Error, fish, fish passage, flow, hydrologic models, improvement, model, modeling, structural safety, structures, survey, velocity, Washington, Washington state, wildlife
|
http://www.wsdot.wa.gov/research/reports/fullreports/545.1.pdf http://wsdot.wa.gov/Research/Reports/500/545.1.htm |
Orsborn,J. F. | WA-RD 545.2 | Culvert Design Flows For Fish Passage And Structural Safety In Ease Cascade and Blue Mountain Streams 51 | 2002 |
Abstract:
The pervasive problem of restoring fish runs to their natal streams is characterized in many regions of Washington by improperly placed culverts. The replacement of these fish migration barriers requires knowledge of design flows: floods for structural safety and migration season high and low flows. High flows block fish passage with velocities that exceed their swimming capabilities. During low flows, the migration barrier is caused by a lack of enough water depth to support the bodies of the fish. The estimation of these fish passage and safety flows in ungaged streams is impeded in eastern Washington due to: the wide range of conditions (5 to 110 inches per year of precipitation); diverse geology and soils; a lack of stream-gaging stations with long-term records; changes in land use; and the seasonal impacts of irrigation diversions and well on the remnant flows. Past efforts to estimate these flows have not been successful. Therefore, the WSU project was undertaken to model the high migration season flow in all of eastern Washington. In addition, WSU established 20 stream-gaging stations on salmon streams along the east side of the Cascade Mountains plus the Blue Mountains. Our complementary project was developed to estimate other design flows in the Water Resource Inventory Areas and 49, in which the WSU gage sites are located. United States Geological Survey (USGS) gage records in those (and in and 47) were used to develop our models that estimate the following statistical flows: 100-year, 25-year and 2-year daily and peak floods; the average annual flow and its variability; ranges of mean monthly flows (maximum, average and low); the 7-day average, 2-year, 10-year, 20-year low flow; and the 30- and 60-day average low flows. The model results are, for the most part, very good. The standard error of estimate ranges are: for floods, 2 -37%; average annual flow, 10-37%; maximum annual flow, 6 -14%; annual flow, 13 -23%; and flows, 3 -22%. Monthly average flows reflected the strong influences of seasonal variability and irrigation withdrawals: due to winter frozen Iowa flows (3%)in the Entiat,-Wenatchee Region, and August low flows (242%) in the Blue Mountains due to irrigation. All flow estimation equations were based on USGS stream-gaging data from continuous located in the located in the WRIA'S.
Authors:
Orsborn,J. F., Orsborn,M. T.
Keywords:
Annual, barrier, barriers, condition, culvert, culverts, data, design, design flows, developed, equations, Error, fish, fish passage, flood, flow, hydrologic models, impact, impacts, ITS, land use, land-use, model, models, project, safety, salmon, season, seasonal, soil, structural safety, survey, velocity, Washington, winter
The pervasive problem of restoring fish runs to their natal streams is characterized in many regions of Washington by improperly placed culverts. The replacement of these fish migration barriers requires knowledge of design flows: floods for structural safety and migration season high and low flows. High flows block fish passage with velocities that exceed their swimming capabilities. During low flows, the migration barrier is caused by a lack of enough water depth to support the bodies of the fish. The estimation of these fish passage and safety flows in ungaged streams is impeded in eastern Washington due to: the wide range of conditions (5 to 110 inches per year of precipitation); diverse geology and soils; a lack of stream-gaging stations with long-term records; changes in land use; and the seasonal impacts of irrigation diversions and well on the remnant flows. Past efforts to estimate these flows have not been successful. Therefore, the WSU project was undertaken to model the high migration season flow in all of eastern Washington. In addition, WSU established 20 stream-gaging stations on salmon streams along the east side of the Cascade Mountains plus the Blue Mountains. Our complementary project was developed to estimate other design flows in the Water Resource Inventory Areas and 49, in which the WSU gage sites are located. United States Geological Survey (USGS) gage records in those (and in and 47) were used to develop our models that estimate the following statistical flows: 100-year, 25-year and 2-year daily and peak floods; the average annual flow and its variability; ranges of mean monthly flows (maximum, average and low); the 7-day average, 2-year, 10-year, 20-year low flow; and the 30- and 60-day average low flows. The model results are, for the most part, very good. The standard error of estimate ranges are: for floods, 2 -37%; average annual flow, 10-37%; maximum annual flow, 6 -14%; annual flow, 13 -23%; and flows, 3 -22%. Monthly average flows reflected the strong influences of seasonal variability and irrigation withdrawals: due to winter frozen Iowa flows (3%)in the Entiat,-Wenatchee Region, and August low flows (242%) in the Blue Mountains due to irrigation. All flow estimation equations were based on USGS stream-gaging data from continuous located in the located in the WRIA'S.
Authors:
Orsborn,J. F., Orsborn,M. T.
Keywords:
Annual, barrier, barriers, condition, culvert, culverts, data, design, design flows, developed, equations, Error, fish, fish passage, flood, flow, hydrologic models, impact, impacts, ITS, land use, land-use, model, models, project, safety, salmon, season, seasonal, soil, structural safety, survey, velocity, Washington, winter
|
http://www.wsdot.wa.gov/research/reports/fullreports/545.2.pdf http://wsdot.wa.gov/Research/Reports/500/545.2.htm |
Allen,T. M. | WA-RD 528.1 | Application of the K 0-Stiffness Method to Reinforced Soil Wall Limit States Design | 2001 | Washington State Dept. of Transportation |
Abstract:
A new design methodology for estimating reinforcement loads in reinforced soil walls, termed the K 0-Stiffness Method, has been developed. This new method has been demonstrated to more accurately estimate reinfocement loads and strains in reinforced soil walls than do current design methodologies. Step-by-step procedures are provided to lead the designer through the reinforced soil wall internal stability design process using this new methodology. These step-by-step design procedures have been developed with a limit states design approach consistent with current design codes (in North America this is termed Load and Resistance Factor Design, or LRFD). Specifically, consideration has been given to strength and serviceability limit states. Load and resistance factors, based on statistical data where feasible, have been developed for use with this method. The results of examples from actual wall case histories were summarized and analyzed to assess how well the new methodology performs relative to current design practice. From this analysis of the design examples, the following was observed: For geosynthetic walls, the K 0-Stiffness Method has the potential to reduce required backfill reinforcement capacity relative to current design methodology by a factor of 1.2 to 3. For steel reinforced soil walls, the reduction in the reinforcement capacity relative to what is required by current design methodology is more modest, on the order of 1.0 to 2.1. Given these findings, use of the K 0-Stiffness Method can result in substantial cost savings, especially for geosynthetic walls, because of reduced reinforcement needs.
Authors:
Allen,T. M., Bathurst,R. J.
Keywords:
reinforcement, walls, loads, strains, creep, design, research, methodology, soil, developed, stability, design process, codes, North, resistance, strength, data, analysis, geosynthetic, steel, cost
A new design methodology for estimating reinforcement loads in reinforced soil walls, termed the K 0-Stiffness Method, has been developed. This new method has been demonstrated to more accurately estimate reinfocement loads and strains in reinforced soil walls than do current design methodologies. Step-by-step procedures are provided to lead the designer through the reinforced soil wall internal stability design process using this new methodology. These step-by-step design procedures have been developed with a limit states design approach consistent with current design codes (in North America this is termed Load and Resistance Factor Design, or LRFD). Specifically, consideration has been given to strength and serviceability limit states. Load and resistance factors, based on statistical data where feasible, have been developed for use with this method. The results of examples from actual wall case histories were summarized and analyzed to assess how well the new methodology performs relative to current design practice. From this analysis of the design examples, the following was observed: For geosynthetic walls, the K 0-Stiffness Method has the potential to reduce required backfill reinforcement capacity relative to current design methodology by a factor of 1.2 to 3. For steel reinforced soil walls, the reduction in the reinforcement capacity relative to what is required by current design methodology is more modest, on the order of 1.0 to 2.1. Given these findings, use of the K 0-Stiffness Method can result in substantial cost savings, especially for geosynthetic walls, because of reduced reinforcement needs.
Authors:
Allen,T. M., Bathurst,R. J.
Keywords:
reinforcement, walls, loads, strains, creep, design, research, methodology, soil, developed, stability, design process, codes, North, resistance, strength, data, analysis, geosynthetic, steel, cost
|
http://www.wsdot.wa.gov/research/reports/fullreports/528.1.pdf http://wsdot.wa.gov/Research/Reports/500/528.1.htm |
Davids, W.G. | WA-RD 455.1 | Modeling of Rigid pavements: Joint Shear Transfer Mechanisms and Finite Element Solution Strategies | 1998 | TRAC/UW |
Abstract:
This report documents the moldeling strategy and associated verification which permits analysis of multiple PCC plain jointed slabs. Several subbase/soil layers below the slabs and separation of the slab and base layer are considered. Load effects include those associated with both multiple tire and linear temperature gradients. A technique for modeling aggregate interlock shear transfer across PCC pavement joints is developed and verified. The overall development is contained in the computer program EverFE. The computer program uses a graphical user interface which aids its use.
Authors:
Davids, W.G., Turkiyyah, G.M., Mahoney, J.P.
Keywords:
Aggregate, aggregate interlock, analysis, base, computer, computer program, developed, development, EverFE, finite element, Finite elements, ITS, Joints, joints load transfer, modeling, pavement, pavements, PCC, permits, program, rigid pavement, temperature, tire
This report documents the moldeling strategy and associated verification which permits analysis of multiple PCC plain jointed slabs. Several subbase/soil layers below the slabs and separation of the slab and base layer are considered. Load effects include those associated with both multiple tire and linear temperature gradients. A technique for modeling aggregate interlock shear transfer across PCC pavement joints is developed and verified. The overall development is contained in the computer program EverFE. The computer program uses a graphical user interface which aids its use.
Authors:
Davids, W.G., Turkiyyah, G.M., Mahoney, J.P.
Keywords:
Aggregate, aggregate interlock, analysis, base, computer, computer program, developed, development, EverFE, finite element, Finite elements, ITS, Joints, joints load transfer, modeling, pavement, pavements, PCC, permits, program, rigid pavement, temperature, tire
|
Livingston,J. | WA-RD 347.1 | Rubber Modified and PBA-6 Asphalt Binder Pavements, SR-5, Lewis County Line to SR-12 368 | 1994 |
Abstract:
This report documents the construction of two experimental test sections of asphalt concrete pavement containing polymer and ground rubber additives. The two sections are located on I-5 south of Olympia, Washington and were constructed in the summer of 1992.The test sections were paved with an open-graded using PBA-6 and asphalt cement binders. PBA-6 is a performance based asphalt cement with a polymer additive. is a performance based asphalt cement but with ground tires as the additive. The is a for a new product developed by the U.S. Oil and Refining Company of Tacoma, Washington. The completed test sections are performing well, although the PBA-6GR section is flushing due to too high of an initial asphalt content. The sections will be monitored of 10 years to determine long-term performance.
Authors:
Livingston,J., Anderson,K. W.
Keywords:
additive, asphalt, asphalt concrete, Asphalt Concrete pavement, Asphalt content, asphalt pavement, concrete, construction, counties, crumb-rubber, developed, experimental, line, open-graded, pavement, pavements, performance, performance based specifications, polymer, rubber, tire, tires, Washington
This report documents the construction of two experimental test sections of asphalt concrete pavement containing polymer and ground rubber additives. The two sections are located on I-5 south of Olympia, Washington and were constructed in the summer of 1992.The test sections were paved with an open-graded using PBA-6 and asphalt cement binders. PBA-6 is a performance based asphalt cement with a polymer additive. is a performance based asphalt cement but with ground tires as the additive. The is a for a new product developed by the U.S. Oil and Refining Company of Tacoma, Washington. The completed test sections are performing well, although the PBA-6GR section is flushing due to too high of an initial asphalt content. The sections will be monitored of 10 years to determine long-term performance.
Authors:
Livingston,J., Anderson,K. W.
Keywords:
additive, asphalt, asphalt concrete, Asphalt Concrete pavement, Asphalt content, asphalt pavement, concrete, construction, counties, crumb-rubber, developed, experimental, line, open-graded, pavement, pavements, performance, performance based specifications, polymer, rubber, tire, tires, Washington
|
Herman,L. A. | WA-RD 327.1 | Noise Mitigation Strategies - Final 454 | 1993 |
Abstract:
Noise mitigation strategies involving both noise reduction at the source of transportation noise and at the receiver of transportation noise are reviewed. The following major sources of noise within a motor vehicle considered: engine, intake, exhaust, cooling fan, transmission, and tire noise. Current research intended to address methods of reducing noise far each of these sources is discussed. It was found that vehicle manufacturer efforts in the U.S. to reduce vehicle noise is currently being motivated marketplace for quiet vehicles. In addition to the potentialnoise reduction from specific components of the vehicle, it was found that the type of roadway pavement can have a significant effect on noise. A key strategy for reducing transportation noise at the receiver of the noise is land use compatibility planning. local agencies who have successfully implemented and use compatibility planning programs were interviewed. These programs fall into two broad The first category is land use compatibility brought about by zoning. this category, land uses that are inherently with transportation noise sources are adjacent to the sources. The second category, referred to as proponent mi involves a process of mitigation needed to make the use with transportation noise through mitigation efforts funded by the proponent of the development. It was found that noise and land use compatibility programs were most beneficial to communities in the earlier stages of development whereas the use of a local noise ordinance was found to be more beneficial to communities that are more fully developed.
Authors:
Herman,L. A., Bowlby,W.
Keywords:
agencies, developed, development, land use, land use compatibility, land-use, methods, mitigation, noise, noise abatement, noise barriers, noise reduction, pavement, planning, program, research, roadway, tire, tire noise, traffic noise, transportation, vehicle noise, zoning
Noise mitigation strategies involving both noise reduction at the source of transportation noise and at the receiver of transportation noise are reviewed. The following major sources of noise within a motor vehicle considered: engine, intake, exhaust, cooling fan, transmission, and tire noise. Current research intended to address methods of reducing noise far each of these sources is discussed. It was found that vehicle manufacturer efforts in the U.S. to reduce vehicle noise is currently being motivated marketplace for quiet vehicles. In addition to the potentialnoise reduction from specific components of the vehicle, it was found that the type of roadway pavement can have a significant effect on noise. A key strategy for reducing transportation noise at the receiver of the noise is land use compatibility planning. local agencies who have successfully implemented and use compatibility planning programs were interviewed. These programs fall into two broad The first category is land use compatibility brought about by zoning. this category, land uses that are inherently with transportation noise sources are adjacent to the sources. The second category, referred to as proponent mi involves a process of mitigation needed to make the use with transportation noise through mitigation efforts funded by the proponent of the development. It was found that noise and land use compatibility programs were most beneficial to communities in the earlier stages of development whereas the use of a local noise ordinance was found to be more beneficial to communities that are more fully developed.
Authors:
Herman,L. A., Bowlby,W.
Keywords:
agencies, developed, development, land use, land use compatibility, land-use, methods, mitigation, noise, noise abatement, noise barriers, noise reduction, pavement, planning, program, research, roadway, tire, tire noise, traffic noise, transportation, vehicle noise, zoning
|
Herman,L. A. | WA-RD 327.2 | Noise Mitigation Strategies - Technical 455 | 1993 |
Abstract:
Noise mitigation strategies involving both noise reduction at the source of transportation noise at the receiver of transportation noise are reviewed. The following major sources of noise within a motor vehicle were considered: engine, intake, exhaust, cooling fan, transmission, and tire noise. Current research intended to address methods of reducing noise far each of these sources is discussed. It was found that vehicle manufacturer efforts in the U.S. to reduce vehicle noise is currently being motivated marketplace for quiet vehicles. In addition to the potential noise reduction from specific components of the vehicle, it was found that the type of roadway pavement can have a significant effect on noise. A key strategy for reducing transportation noise at the receiver of the noise is land use compatibility planning. Local agencies who have successfully implemented and use compatibility planning programs were interviewed. These programs fall into two broad categories. The first category is land use compatibility brought about by zoning. In this category, land uses that are inherently with transportation noise sources are adjacent to the sources. The second category, referred to as proponent mitigation, involves a process of mitigation needed to make the use with transportation noise through mitigation efforts funded by the proponent of the development. It was found that noise and land use compatibility programs were most beneficial to communities in the earlier stages of development whereas the use of a local noise ordinance was found to be more beneficial to communities that are more fully developed.
Authors:
Herman,L. A., Bowlby,W.
Keywords:
agencies, developed, development, land use, land use compatibility, land-use, methods, mitigation, noise, noise abatement, noise barriers, noise reduction, pavement, planning, program, research, roadway, tire, tire noise, traffic noise, transportation, vehicle noise, zoning
Noise mitigation strategies involving both noise reduction at the source of transportation noise at the receiver of transportation noise are reviewed. The following major sources of noise within a motor vehicle were considered: engine, intake, exhaust, cooling fan, transmission, and tire noise. Current research intended to address methods of reducing noise far each of these sources is discussed. It was found that vehicle manufacturer efforts in the U.S. to reduce vehicle noise is currently being motivated marketplace for quiet vehicles. In addition to the potential noise reduction from specific components of the vehicle, it was found that the type of roadway pavement can have a significant effect on noise. A key strategy for reducing transportation noise at the receiver of the noise is land use compatibility planning. Local agencies who have successfully implemented and use compatibility planning programs were interviewed. These programs fall into two broad categories. The first category is land use compatibility brought about by zoning. In this category, land uses that are inherently with transportation noise sources are adjacent to the sources. The second category, referred to as proponent mitigation, involves a process of mitigation needed to make the use with transportation noise through mitigation efforts funded by the proponent of the development. It was found that noise and land use compatibility programs were most beneficial to communities in the earlier stages of development whereas the use of a local noise ordinance was found to be more beneficial to communities that are more fully developed.
Authors:
Herman,L. A., Bowlby,W.
Keywords:
agencies, developed, development, land use, land use compatibility, land-use, methods, mitigation, noise, noise abatement, noise barriers, noise reduction, pavement, planning, program, research, roadway, tire, tire noise, traffic noise, transportation, vehicle noise, zoning
|
Kilian,A. P. | WA-RD 239.1 | Long-Term Performance Evaluation of Wood Fibre Fills | 1992 |
Abstract:
This paper presents the results of a research project to determine the long-term performance of wood fibre embankments, that were constructed by the Washington State Department of Transportation (WSDOT) beginning in 1972. At the time of their construction, concern existed that wood fibre fills would only provide a 15 to 20 year service life.Performance of existing wood fibre fills was evaluated based on thequality of the wood fibre material, quality of the effluent, and condition ofthe pavement. A visual classification system rating the wood fibre from freshto completely decomposed was developed and used in order to establish acriteria from which all wood fibre mater.ia1 could be -rated.. Visual examinationin conjunction with laboratory tests were used as determining aspects for theeffluent quality. The WSDOT Pavement Management System was used to evaluate relative pavement performance. Site descriptions are presented giving specificcharacteristics and properties of the fills inventoried, An analysis of t h i sinformation was done to determine the effectiveness of the fills.Over half the wood fibre samples were found to be nearly fresh or freshand none w e found to be completely decomposed. In all but one case, thepavement quality over the wood fibre fills surpassed the comparative highwaysegment rating indicating the wood fill\'s performance exceeded thatof the surrounding area. Generally, the surface water in the vicinity of thewood fibre was found to be clean and pure indicating no adverse impact ofeffluent. Given the above findings, embankments constructed of wood fibre werefound to perform well over ahnost a 20. year period. Service life in excess of50 years can be expected - of wood fibre fills.
Authors:
Kilian,A. P., Ferry,C. D.
Keywords:
analysis, condition, construction, developed, effectiveness, Embankments, evaluation, impact, Leachate, management, management system, pavement, pavement management, pavement performance, pavements, performance, performance evaluation, project, quality, research, tests, transportation, Washington, Washington state, Wood fibre, WSDOT
This paper presents the results of a research project to determine the long-term performance of wood fibre embankments, that were constructed by the Washington State Department of Transportation (WSDOT) beginning in 1972. At the time of their construction, concern existed that wood fibre fills would only provide a 15 to 20 year service life.Performance of existing wood fibre fills was evaluated based on thequality of the wood fibre material, quality of the effluent, and condition ofthe pavement. A visual classification system rating the wood fibre from freshto completely decomposed was developed and used in order to establish acriteria from which all wood fibre mater.ia1 could be -rated.. Visual examinationin conjunction with laboratory tests were used as determining aspects for theeffluent quality. The WSDOT Pavement Management System was used to evaluate relative pavement performance. Site descriptions are presented giving specificcharacteristics and properties of the fills inventoried, An analysis of t h i sinformation was done to determine the effectiveness of the fills.Over half the wood fibre samples were found to be nearly fresh or freshand none w e found to be completely decomposed. In all but one case, thepavement quality over the wood fibre fills surpassed the comparative highwaysegment rating indicating the wood fill\'s performance exceeded thatof the surrounding area. Generally, the surface water in the vicinity of thewood fibre was found to be clean and pure indicating no adverse impact ofeffluent. Given the above findings, embankments constructed of wood fibre werefound to perform well over ahnost a 20. year period. Service life in excess of50 years can be expected - of wood fibre fills.
Authors:
Kilian,A. P., Ferry,C. D.
Keywords:
analysis, condition, construction, developed, effectiveness, Embankments, evaluation, impact, Leachate, management, management system, pavement, pavement management, pavement performance, pavements, performance, performance evaluation, project, quality, research, tests, transportation, Washington, Washington state, Wood fibre, WSDOT
|
Roper,T. H. | WA-RD 087.1 | Cathodic Protection For Reinforced Concrete Bridge Decks - Woodinville Interchange, Post Construction Report | 1986 |
Abstract:
Under FHWA Demonstration Project No. 34, \"Cathodic Protection for Reinforced Concrete Bridge Decks,\" a slotted cathodic protection system was installed on the ES ramp in the Woodinville Interchange during the summer of 1985. The slotted cathodic protection system involves sawing by slots longitudinally in the existing deck at one-foot centers. Platinum wire or carbon strand wire is placed in the cut slots first and then conductive polymer is filled in the slots. Electric power from a rectifier supplies current to the wire and conductive polymer. The current then flows to the top mat reinforcing steel, giving the steel protection from further corrosion. The objective of the demonstration project was to familiarize the Washington State DOT with this new technology. This objective was fulfilled. Some problem areas with the system were identified during the work:1.A more positive method of finding grounding locations from the anode to nicks, ties, etc. needs to be developed. Perhaps an instrument can be used to supplement visual inspection. 2.The necessity for having a minimum of 112-inch cover from the bottom of the slot to the top of the needs to be resolved. 3.A better method of installing the conductive polymer needs to be developed. Hand spreading of the material from plastic bags results in sloppy work. 4.Procurement time for the rectifier needs to be shortened. 5.The project, once it has started, moves along very rapidly, there is very little time for on-the-job training of workers. Workmen should have prior experience at this work. In remote areas, sources of electrical power may not be available. It will be necessary for sources of power, such as solar panels or long-lasting batteries to be developed for this system.
Authors:
Roper,T. H., Henley,E. H. Jr
Keywords:
bridge, bridge deck, bridge decks, cathodic protection, concrete, concrete bridge, construction, corrosion, Deck, developed, flow, inspection, plastic, polymer, project, protection, reinforced concrete, reinforced concrete bridge, reinforcing, reinforcing steel, steel, steel protection, supply, System, technology, training, Washington, Washington state
Under FHWA Demonstration Project No. 34, \"Cathodic Protection for Reinforced Concrete Bridge Decks,\" a slotted cathodic protection system was installed on the ES ramp in the Woodinville Interchange during the summer of 1985. The slotted cathodic protection system involves sawing by slots longitudinally in the existing deck at one-foot centers. Platinum wire or carbon strand wire is placed in the cut slots first and then conductive polymer is filled in the slots. Electric power from a rectifier supplies current to the wire and conductive polymer. The current then flows to the top mat reinforcing steel, giving the steel protection from further corrosion. The objective of the demonstration project was to familiarize the Washington State DOT with this new technology. This objective was fulfilled. Some problem areas with the system were identified during the work:1.A more positive method of finding grounding locations from the anode to nicks, ties, etc. needs to be developed. Perhaps an instrument can be used to supplement visual inspection. 2.The necessity for having a minimum of 112-inch cover from the bottom of the slot to the top of the needs to be resolved. 3.A better method of installing the conductive polymer needs to be developed. Hand spreading of the material from plastic bags results in sloppy work. 4.Procurement time for the rectifier needs to be shortened. 5.The project, once it has started, moves along very rapidly, there is very little time for on-the-job training of workers. Workmen should have prior experience at this work. In remote areas, sources of electrical power may not be available. It will be necessary for sources of power, such as solar panels or long-lasting batteries to be developed for this system.
Authors:
Roper,T. H., Henley,E. H. Jr
Keywords:
bridge, bridge deck, bridge decks, cathodic protection, concrete, concrete bridge, construction, corrosion, Deck, developed, flow, inspection, plastic, polymer, project, protection, reinforced concrete, reinforced concrete bridge, reinforcing, reinforcing steel, steel, steel protection, supply, System, technology, training, Washington, Washington state
|
Roper,T. H. | WA-RD 087.2 | Cathodic Protection For Reinforced Concrete Bridge Decks - Yakima River Bridge, Post Construction Report | 1986 |
Abstract:
Under FHWA Demonstration Project No. 34, \"Cathodic Protection for Reinforced Concrete Decks,\" a non-slotted cathodic protection system was installed on the deck of the Yakima Bridge near Yakima, Washington, in the summer of 1985. The project involved repairing deck, then fastening Raychem pre-manufactured anodes to the deck to impress current to the mat rebar. Impressing current through the concrete to the top mat steel prevents corrosion of the steel. A latex modified concrete overlay was placed over the deck anode. The objective of the demonstration project to familiarize the Washington State DOT with new technology. This objective was fulfilled. Some problem areas with the system were identified during the work: 1.A more positive method of finding electrical grounding locations from the anode to nicks, ties, etc., needs to be developed. Some ties were exposed during the scarifying operation Perhaps an instrument can be used to supplement visual inspection. 2. An effective technique of allowing concrete trucks to drive on the anode without damaging needs to be developed. 3.An effective method needs to be developed to locate breaks in the anode as well as shorts. 4. In remote areas, sources of electrical power may not be available. It will be necessary sources of power, such as solar panels or long-lasting batteries to be developed for this system. 5. Since the project, once it has started, moves along very rapidly, there is very little time on-the-job training of workers. Workmen should have prior experience at this work. These problems need to be overcome to obtain a better quality product.
Authors:
Roper,T. H., Henley,E. H. Jr
Keywords:
bridge, bridge deck, bridge decks, cathodic protection, concrete, concrete bridge, construction, corrosion, Deck, developed, inspection, latex modified concrete, overlay, project, protection, quality, reinforced concrete, reinforced concrete bridge, steel, System, technology, training, truck, trucks, Washington, Washington state
Under FHWA Demonstration Project No. 34, \"Cathodic Protection for Reinforced Concrete Decks,\" a non-slotted cathodic protection system was installed on the deck of the Yakima Bridge near Yakima, Washington, in the summer of 1985. The project involved repairing deck, then fastening Raychem pre-manufactured anodes to the deck to impress current to the mat rebar. Impressing current through the concrete to the top mat steel prevents corrosion of the steel. A latex modified concrete overlay was placed over the deck anode. The objective of the demonstration project to familiarize the Washington State DOT with new technology. This objective was fulfilled. Some problem areas with the system were identified during the work: 1.A more positive method of finding electrical grounding locations from the anode to nicks, ties, etc., needs to be developed. Some ties were exposed during the scarifying operation Perhaps an instrument can be used to supplement visual inspection. 2. An effective technique of allowing concrete trucks to drive on the anode without damaging needs to be developed. 3.An effective method needs to be developed to locate breaks in the anode as well as shorts. 4. In remote areas, sources of electrical power may not be available. It will be necessary sources of power, such as solar panels or long-lasting batteries to be developed for this system. 5. Since the project, once it has started, moves along very rapidly, there is very little time on-the-job training of workers. Workmen should have prior experience at this work. These problems need to be overcome to obtain a better quality product.
Authors:
Roper,T. H., Henley,E. H. Jr
Keywords:
bridge, bridge deck, bridge decks, cathodic protection, concrete, concrete bridge, construction, corrosion, Deck, developed, inspection, latex modified concrete, overlay, project, protection, quality, reinforced concrete, reinforced concrete bridge, steel, System, technology, training, truck, trucks, Washington, Washington state
|
Ritchie,S. G. | WA-RD 083.1 | Statewide Highway Data Rationalization Study | 1986 |
Abstract:
This study involved an in-depth evaluation of the Washington State Department of Transportation highway data development and analysis activities. It developed statistically-based procedures and recommendations for a streamlined highway data collection program. Opportunities to reduce manpower and equipment costs, streamline work activities, improve the quality of data collection and provide accurate and timely data for the various users were identified. Given the focus on highway data, the major effort was devoted to the Department's traffic counting program. However, many data items and programs were considered, with the following receiving particular attention: traffic volume counting, including estimation of annual average daily traffic at any location throughout the state highway system; associated seasonal, axle and growth factors; vehicle classification; truck weights; and the relationship between the statistical sampling requirements recommended for these items and those associated with the FHWA Highway Performance Monitoring System in the state.
Authors:
Ritchie,S. G., Hallenbeck,M. E.
Keywords:
analysis, Annual, axle, cost, costs, data, data collection, developed, development, equipment, evaluation, highway, monitoring, performance, performance monitoring, program, quality, sampling, seasonal, Study, System, traffic, traffic counting, transportation, truck, vehicle classification, volume, Washington, Washington state, weight, weights
This study involved an in-depth evaluation of the Washington State Department of Transportation highway data development and analysis activities. It developed statistically-based procedures and recommendations for a streamlined highway data collection program. Opportunities to reduce manpower and equipment costs, streamline work activities, improve the quality of data collection and provide accurate and timely data for the various users were identified. Given the focus on highway data, the major effort was devoted to the Department's traffic counting program. However, many data items and programs were considered, with the following receiving particular attention: traffic volume counting, including estimation of annual average daily traffic at any location throughout the state highway system; associated seasonal, axle and growth factors; vehicle classification; truck weights; and the relationship between the statistical sampling requirements recommended for these items and those associated with the FHWA Highway Performance Monitoring System in the state.
Authors:
Ritchie,S. G., Hallenbeck,M. E.
Keywords:
analysis, Annual, axle, cost, costs, data, data collection, developed, development, equipment, evaluation, highway, monitoring, performance, performance monitoring, program, quality, sampling, seasonal, Study, System, traffic, traffic counting, transportation, truck, vehicle classification, volume, Washington, Washington state, weight, weights
|
Nelson,T. L. | WA-RD 050.3 | Development And Implementation Of Washington State's Pavement System - Executive Summary | 1983 |
Abstract:
This report summarizes the pavement management system developed by WSDOT staff over a period of five years. Included is a description of what the system does in terms of the considerable amount of useful output data produced. A discussion is given on how the system was developed, what the pavement rating procedures involve and cost, what computer requirements are, and what typical data processing costs are. The report concludes with comments on how other agencies can use the Washington State Pavement Management System.
Authors:
Nelson,T. L., LeClerc,R. V.
Keywords:
agencies, computer, cost, costs, data, developed, development, Executive, Executive Summary, management, management system, pavement, pavement data file, pavement management, pavement performance, System, Washington, Washington state, WSDOT
This report summarizes the pavement management system developed by WSDOT staff over a period of five years. Included is a description of what the system does in terms of the considerable amount of useful output data produced. A discussion is given on how the system was developed, what the pavement rating procedures involve and cost, what computer requirements are, and what typical data processing costs are. The report concludes with comments on how other agencies can use the Washington State Pavement Management System.
Authors:
Nelson,T. L., LeClerc,R. V.
Keywords:
agencies, computer, cost, costs, data, developed, development, Executive, Executive Summary, management, management system, pavement, pavement data file, pavement management, pavement performance, System, Washington, Washington state, WSDOT
|
Nielsen,Robert S. | WA-RD 043.1 | Allocation Of Transportation Resources: Development Of An Evaluation Method 904 | 1982 |
Abstract:
The objective of this report is to develop an effective transportation resource allocation technique that is flexible and can be applied to various areas. Allocation procedures were developed and tested for apportioning resources to transportation services in relation to community transportation objectives. Procedures were developed and applied that measured the effectiveness of candidate transportation service proposals in terms of a transportation resource allocation index (TRAI). The extent to which a transportation proposal achieves the community objectives is defined as its effectiveness. The transportation index was computed on the basis of the projects scorings for eight selected determinants, multiplied by the weighing assigned to each determinant in accordance with their relative effectiveness.The TRAI for eight transportation service proposals including transit, were computed as a pilot study and as a working test of the techniques in the Tri-Cities area of Richland, Kennewick, and Pasco, WA. There appears to be no complication in implementing this technique for allocations in any local urban area providing the concepts are correctly evaluated and applied.
Authors:
Nielsen,Robert S., Shea,Daniel J., Yandon,Keith E.
Keywords:
Allocation of resources, developed, development, effectiveness, evaluation, index, ITS, Objective and goals, objectives, project, transit, transportation, transportation resource/allocation, transportation service, urban
The objective of this report is to develop an effective transportation resource allocation technique that is flexible and can be applied to various areas. Allocation procedures were developed and tested for apportioning resources to transportation services in relation to community transportation objectives. Procedures were developed and applied that measured the effectiveness of candidate transportation service proposals in terms of a transportation resource allocation index (TRAI). The extent to which a transportation proposal achieves the community objectives is defined as its effectiveness. The transportation index was computed on the basis of the projects scorings for eight selected determinants, multiplied by the weighing assigned to each determinant in accordance with their relative effectiveness.The TRAI for eight transportation service proposals including transit, were computed as a pilot study and as a working test of the techniques in the Tri-Cities area of Richland, Kennewick, and Pasco, WA. There appears to be no complication in implementing this technique for allocations in any local urban area providing the concepts are correctly evaluated and applied.
Authors:
Nielsen,Robert S., Shea,Daniel J., Yandon,Keith E.
Keywords:
Allocation of resources, developed, development, effectiveness, evaluation, index, ITS, Objective and goals, objectives, project, transit, transportation, transportation resource/allocation, transportation service, urban
|
Nelson,Thomas L. | WA-RD 050.1 | Development And Implementation Of Washington State's Pavement System 905 | 1982 |
Abstract:
This report describes the pavement management system developed by WSDOT staff over a period of five years. Both project-level and network-level pavement management are represented within the four broad areas of data processing which combine to constitute the foundation of the system.The design of a pavement data file is laid out together with the process of assembling it. Also shown are the methods used to analyze and convert the file data from pavement condition ratings to pavement performance curves for each project. The performance curves are then used, together with appropriate cost data, to determine the most cost-effective type and time to fix. The network-level program then summarized the need work for each year of a rehabilitation program. Mean are provided for adjusting the program to fit budget constraints or minimum acceptable levels of average pavement condition.It is concluded that the system, operating on biennial pavement condition ratings, provides a good solid framework for orderly analysis to estimate the economic benefits of the type, timing, and sequence of rehabilitation activities applied to a pavement.
Authors:
Nelson,Thomas L., LeClerc,R. V.
Keywords:
analysis, benefit, benefits, condition, cost, data, design, developed, development, foundation, framework, management, management system, methods, Operating, pavement, pavement condition, pavement data file, pavement management, pavement performance, performance, program, project, rehabilitation, System, Washington, Washington state, WSDOT
This report describes the pavement management system developed by WSDOT staff over a period of five years. Both project-level and network-level pavement management are represented within the four broad areas of data processing which combine to constitute the foundation of the system.The design of a pavement data file is laid out together with the process of assembling it. Also shown are the methods used to analyze and convert the file data from pavement condition ratings to pavement performance curves for each project. The performance curves are then used, together with appropriate cost data, to determine the most cost-effective type and time to fix. The network-level program then summarized the need work for each year of a rehabilitation program. Mean are provided for adjusting the program to fit budget constraints or minimum acceptable levels of average pavement condition.It is concluded that the system, operating on biennial pavement condition ratings, provides a good solid framework for orderly analysis to estimate the economic benefits of the type, timing, and sequence of rehabilitation activities applied to a pavement.
Authors:
Nelson,Thomas L., LeClerc,R. V.
Keywords:
analysis, benefit, benefits, condition, cost, data, design, developed, development, foundation, framework, management, management system, methods, Operating, pavement, pavement condition, pavement data file, pavement management, pavement performance, performance, program, project, rehabilitation, System, Washington, Washington state, WSDOT
|
Nelson,Thomas L. | WA-RD 050.2 | Development And Implementation Of Washington State's Pavement System - Summary 906 | 1982 |
Abstract:
This report describes the pavement system developed by staff over a period of five years. Both project-level and network-level pavement are represented within the four broad areas of data processing which combine to constitute the foundation of the system. The design of a pavement data file is laid out together with the process of assembling it. Also shown are the methods used to analyze and convert the file data pavement condition ratings to pavement performance curves for each project. The performance curves are then used, together with appropriate cost data, to determine the most cost-effective type and of fix. The network-level program then the needed work for each year of a rehabilitation program. Means are provided for adjusting the program to fit budget constraints or acceptable levels of average pavement condition It is concluded that the system, operating on biennial pavement condition ratings, provides a good solid framework for orderly analysis to estimate the economic benefits of the type, timing, and sequence of rehabilitation activities apply to a pavement.
Authors:
Nelson,Thomas L., LeClerc,R. V.
Keywords:
analysis, benefit, benefits, condition, cost, cost effective, data, design, developed, development, foundation, framework, management, management system, methods, Operating, pavement, pavement condition, pavement data file, pavement management, pavement performance, performance, program, project, rehabilitation, System, Washington, Washington state, WSDOT
This report describes the pavement system developed by staff over a period of five years. Both project-level and network-level pavement are represented within the four broad areas of data processing which combine to constitute the foundation of the system. The design of a pavement data file is laid out together with the process of assembling it. Also shown are the methods used to analyze and convert the file data pavement condition ratings to pavement performance curves for each project. The performance curves are then used, together with appropriate cost data, to determine the most cost-effective type and of fix. The network-level program then the needed work for each year of a rehabilitation program. Means are provided for adjusting the program to fit budget constraints or acceptable levels of average pavement condition It is concluded that the system, operating on biennial pavement condition ratings, provides a good solid framework for orderly analysis to estimate the economic benefits of the type, timing, and sequence of rehabilitation activities apply to a pavement.
Authors:
Nelson,Thomas L., LeClerc,R. V.
Keywords:
analysis, benefit, benefits, condition, cost, cost effective, data, design, developed, development, foundation, framework, management, management system, methods, Operating, pavement, pavement condition, pavement data file, pavement management, pavement performance, performance, program, project, rehabilitation, System, Washington, Washington state, WSDOT
|
Mar,B. W. | WA-RD 039.16 | Summary Of Runoff Water Quality Study 1977-82 907 | 1982 |
Abstract:
A highway storm water runoff pollutant loading. model has been developed based on results from con3posire sampling of approximately 600 storms at nine locations in the State of Washington over five years. The model expresses total suspended solids (TSS) loading in proportion to the product of highway segment length, average runoff coefficient, and vehicles traveling during storm periods. It was dem-onstrated that loadings of contaminants such as chemical oxygen demand, nutrients and trace metals could be estimated from TSS loadings using ratios derived from the data, The model described was developed and validated for assessing total loadings over a time span encompassing a number of storms (monthly or annually). To predict pollutant concentrations and loadings in runoff from a given storm, cumulative distributions were plotted and analyzed to determine the probability of exceeding specific concentration and loading values in a given case. Bioassay studies using highway runoff indicated toxicity to aquatic life when elevated metals deposition from high traffic volumes (in excess of 10,000 -20,000 vehicles per day) or high metals concentrations in rainfall caused runoff concentrations to exceed lethal levels. Draining highway runoff through grass channels 60 meters in length greatly reduced TSS and metals concentrations and the consequent toxic effects. The major product of this research is a guide to assessing and mitigating the impacts of highway runoff to receiving waters.
Authors:
Mar,B. W., Horner,R. R., Spyridakis,D. E., Welch,E. B.
Keywords:
Assessment, Channel, Chemical, Concentrations, data, demand, deposition, developed, highway, highway runoff, impact, impacts, Loadings, Highway runoff, metals, mitigation, model, models, pollutant loading, Pollutants, quality, rainfall, research, runoff, sampling, span, stormwater, suspended solids, Toxicity, traffic, traffic volumes, volume, Washington, Washington state, water quality
A highway storm water runoff pollutant loading. model has been developed based on results from con3posire sampling of approximately 600 storms at nine locations in the State of Washington over five years. The model expresses total suspended solids (TSS) loading in proportion to the product of highway segment length, average runoff coefficient, and vehicles traveling during storm periods. It was dem-onstrated that loadings of contaminants such as chemical oxygen demand, nutrients and trace metals could be estimated from TSS loadings using ratios derived from the data, The model described was developed and validated for assessing total loadings over a time span encompassing a number of storms (monthly or annually). To predict pollutant concentrations and loadings in runoff from a given storm, cumulative distributions were plotted and analyzed to determine the probability of exceeding specific concentration and loading values in a given case. Bioassay studies using highway runoff indicated toxicity to aquatic life when elevated metals deposition from high traffic volumes (in excess of 10,000 -20,000 vehicles per day) or high metals concentrations in rainfall caused runoff concentrations to exceed lethal levels. Draining highway runoff through grass channels 60 meters in length greatly reduced TSS and metals concentrations and the consequent toxic effects. The major product of this research is a guide to assessing and mitigating the impacts of highway runoff to receiving waters.
Authors:
Mar,B. W., Horner,R. R., Spyridakis,D. E., Welch,E. B.
Keywords:
Assessment, Channel, Chemical, Concentrations, data, demand, deposition, developed, highway, highway runoff, impact, impacts, Loadings, Highway runoff, metals, mitigation, model, models, pollutant loading, Pollutants, quality, rainfall, research, runoff, sampling, span, stormwater, suspended solids, Toxicity, traffic, traffic volumes, volume, Washington, Washington state, water quality
|
Vause,Kurt H. | WA-RD 039.1 | Water Quality Impacts Associated With Leacheates From Highway Woodwaste Embankments 932 | 1980 |
Abstract:
An extensive literature review , laboratory column study and field observations indicated that leaching of soluble pollutants from woodwaste submerged in groundwater will be completed within a few years. Longer periods of leaching will be generated by woodfills above groundwater exposed to precipitation or infiltration of runoff. Expressions to model the quantity and characteristics quality of leachate from woodwaste fills used for road embankments were developed, and mitigating measures to reduce the impact of leachates are proposed.
Authors:
Vause,Kurt H., Ferguson,John F., Mar,B. W.
Keywords:
column studies, developed, embankment, Embankments, highway, impact, impacts, infiltration, Leachate, model, Pollutants, quality, review, runoff, water quality, Woodwaste fills
An extensive literature review , laboratory column study and field observations indicated that leaching of soluble pollutants from woodwaste submerged in groundwater will be completed within a few years. Longer periods of leaching will be generated by woodfills above groundwater exposed to precipitation or infiltration of runoff. Expressions to model the quantity and characteristics quality of leachate from woodwaste fills used for road embankments were developed, and mitigating measures to reduce the impact of leachates are proposed.
Authors:
Vause,Kurt H., Ferguson,John F., Mar,B. W.
Keywords:
column studies, developed, embankment, Embankments, highway, impact, impacts, infiltration, Leachate, model, Pollutants, quality, review, runoff, water quality, Woodwaste fills
|
Clark,David L. | WA-RD 039.4 | Composite Sampling Of Highway Runoff Year Two, Interim Report 935 | 1980 |
Abstract:
A composite sampling device was developed that can be installed at less than ten percent of the cost of automatic sampling systems currently used in Federal highway runoff studics. This dcvi ce was operated for one year, along-side an automatic sampler at the 1-5 side, to demonstrate that the two systems provide statistically identical storm composites.
Authors:
Clark,David L., Mar,B. W.
Keywords:
cost, developed, highway, highway runoff, Interim, runoff, sampling, System, systems, Water Pollutants, Washington State Monitoring
A composite sampling device was developed that can be installed at less than ten percent of the cost of automatic sampling systems currently used in Federal highway runoff studics. This dcvi ce was operated for one year, along-side an automatic sampler at the 1-5 side, to demonstrate that the two systems provide statistically identical storm composites.
Authors:
Clark,David L., Mar,B. W.
Keywords:
cost, developed, highway, highway runoff, Interim, runoff, sampling, System, systems, Water Pollutants, Washington State Monitoring
|
Brown,C. B. | WA-RD 044.1 | Evergreen Point Bridge Maintenance Problems 936 | 1980 |
Abstract:
The 1974-79 study of the maintenance problems of the drawspan mechanism of the Evergreen Point Bridge across Lake Washington is reported. The approach was to predict the life of elements by Miner's hypothesis. For this the strains at critical points and the wind vector were measured over two sessions. These results were correlated with long term wind data to provide the number of cycles in a year at various stress levels. The fatigue capacity of anchor rods was determined by the Prot test on six specimens. The resulting S-N curve compared to the field measurements to determine the expected life of the rods from the Miner criterion. The methods developed provide useable maintenance procedures for the prevention of fatigue failure of critical structural elements.
Authors:
Brown,C. B.
Keywords:
bridge, data, developed, fatigue, maintenance, methods, reliability, strains, stresses, Washington, wind
The 1974-79 study of the maintenance problems of the drawspan mechanism of the Evergreen Point Bridge across Lake Washington is reported. The approach was to predict the life of elements by Miner's hypothesis. For this the strains at critical points and the wind vector were measured over two sessions. These results were correlated with long term wind data to provide the number of cycles in a year at various stress levels. The fatigue capacity of anchor rods was determined by the Prot test on six specimens. The resulting S-N curve compared to the field measurements to determine the expected life of the rods from the Miner criterion. The methods developed provide useable maintenance procedures for the prevention of fatigue failure of critical structural elements.
Authors:
Brown,C. B.
Keywords:
bridge, data, developed, fatigue, maintenance, methods, reliability, strains, stresses, Washington, wind
|
Veress,S. A. | WA-RD 038.1 | Monitoring By Aerial And Terrestrial Photgrammetry 938 | 1979 |
Abstract:
A photogrammetric monitoring method of structural deformation has been developed during the course of this project. The method is based on a combination of aerial and terrestrial photographs.The theoretical experimentation for formulation of computer programs has beendone on mathematical model s. The combination of aerial and terrestrial photographsprovides a 30% increased accuracy if compared to terrestrial photographsonly. Practical experimentation was done on the existing Gabion Wall and itwas indicated that the achievable accuracy is 1/120,000 o f the photographicdistance. The method is flexible if it can be used for monitoring of an$type of structure as well as f o r aerialtriangulation.
Authors:
Veress,S. A., Hatzopoulos,J. N.
Keywords:
computer, computer program, developed, Gabion, model, monitoring, Photogrammetry monitoring, simultaneous adjustment, statistical analysis and space intersection, resection, program, project
A photogrammetric monitoring method of structural deformation has been developed during the course of this project. The method is based on a combination of aerial and terrestrial photographs.The theoretical experimentation for formulation of computer programs has beendone on mathematical model s. The combination of aerial and terrestrial photographsprovides a 30% increased accuracy if compared to terrestrial photographsonly. Practical experimentation was done on the existing Gabion Wall and itwas indicated that the achievable accuracy is 1/120,000 o f the photographicdistance. The method is flexible if it can be used for monitoring of an$type of structure as well as f o r aerialtriangulation.
Authors:
Veress,S. A., Hatzopoulos,J. N.
Keywords:
computer, computer program, developed, Gabion, model, monitoring, Photogrammetry monitoring, simultaneous adjustment, statistical analysis and space intersection, resection, program, project
|
University of Washington | WA-RD 023.1A | Operating Manual, Methods and Equipment Developed During The Project (Central Avalanche Hazard Forecasting), July 1975-M... | 1978 |
Abstract:
The Central Avalanche Hazard Forecasting project has been funded by the Washington State Highway Commission since July 1975 in order to test the feasibility and effectiveness of central avalanche forecasting for the Cascade Mountain Passes and adjacent territory . Historically, avalanche forecasting in the Cascade Mountains has been done locally on an area-by-area basis by Highway Department personnel and by Forest Rangers and professional ski patrolmen at individual ski areas. This project explored the possibilities of improving both mountain weather and related avalanche forecasts for use by WSDOT during winter operations in the mountain passes and, secondarily, explored the usefulness of anarea-wide forecasting service to other, cooperating agencies. The aim of this work has been to establish the technical and administrative framework for an operational, on-going mountain weather and avalanche forecasting service for Western Washington under the joint support of interested public agencies. This aim has been achieved in autumn 1978 by the operation of an avalanche forecasting office administered by the US Forest Service, housed by the National Weather Service, and supported by WSDT, with additional peripheral support from both the public and private sectors. Previous reports published by the project include: Interim Report, June 1976 (Report No. 23.2); Final Report, June 1977 (Report No. 23.3)Implementation Report, December 1978, which will be published in Spring 1979If you would like to obtain copies of any of these reports, contact WSDOT Public Transportation and Planning Division in Olympia (SCAN 234-61 49) or the Avalanche Research Office on SCAN 323-7180 or Write Avalanche Research,Department of Atmospheric Sciences AK-40, University of Washington, Seattle,Phil Taylor, Research Engineer, has done an outstanding job of developing much of this equipment and devising methods of operation. He is, unfortunately, no longer with the University. He will be working in Autumn 1978 with the US Forest Service as a consultant in addition to his continuing work with the US Geological Survey. This Operating Manual is intended to be an informational document with limited distribution and its format reflects that informality.
Authors:
University of Washington
Keywords:
agencies, avalanche, avalanche forecasting, developed, effectiveness, equipment, forecasting, framework, hazard, highway, Interim, ITS, manual, methods, Operating, planning, project, public, research, survey, transportation, Washington, Washington state, winter
The Central Avalanche Hazard Forecasting project has been funded by the Washington State Highway Commission since July 1975 in order to test the feasibility and effectiveness of central avalanche forecasting for the Cascade Mountain Passes and adjacent territory . Historically, avalanche forecasting in the Cascade Mountains has been done locally on an area-by-area basis by Highway Department personnel and by Forest Rangers and professional ski patrolmen at individual ski areas. This project explored the possibilities of improving both mountain weather and related avalanche forecasts for use by WSDOT during winter operations in the mountain passes and, secondarily, explored the usefulness of anarea-wide forecasting service to other, cooperating agencies. The aim of this work has been to establish the technical and administrative framework for an operational, on-going mountain weather and avalanche forecasting service for Western Washington under the joint support of interested public agencies. This aim has been achieved in autumn 1978 by the operation of an avalanche forecasting office administered by the US Forest Service, housed by the National Weather Service, and supported by WSDT, with additional peripheral support from both the public and private sectors. Previous reports published by the project include: Interim Report, June 1976 (Report No. 23.2); Final Report, June 1977 (Report No. 23.3)Implementation Report, December 1978, which will be published in Spring 1979If you would like to obtain copies of any of these reports, contact WSDOT Public Transportation and Planning Division in Olympia (SCAN 234-61 49) or the Avalanche Research Office on SCAN 323-7180 or Write Avalanche Research,Department of Atmospheric Sciences AK-40, University of Washington, Seattle,Phil Taylor, Research Engineer, has done an outstanding job of developing much of this equipment and devising methods of operation. He is, unfortunately, no longer with the University. He will be working in Autumn 1978 with the US Forest Service as a consultant in addition to his continuing work with the US Geological Survey. This Operating Manual is intended to be an informational document with limited distribution and its format reflects that informality.
Authors:
University of Washington
Keywords:
agencies, avalanche, avalanche forecasting, developed, effectiveness, equipment, forecasting, framework, hazard, highway, Interim, ITS, manual, methods, Operating, planning, project, public, research, survey, transportation, Washington, Washington state, winter
|
Veress,S. A. | WA-RD 031.1 | Photogrammetric Monitoring Of A Gabion Wall 952 | 1977 |
Abstract:
A photogrammetric monitoring method of structural deformation has been developed during the course of this project. The Gabion Wall which is part of the I-90 project has been used as the site for practical tests of the theorectical development. The monitoring consists of photographing the structure from three camera stations with KA-2 f=24" camera. The camera has been modified to a plate camera to provide the maxium accuracy.The methodology consists of the geodetic determination of the camera location and the orientation and photogrammetric determination of targets (natural and artificial) on the structure. During the course of this project more than 100 target locations were determined by three dimensional coordinates. the maximum error was found to be + 3/4 inch; the average, 1/2 inch. This represents a relative accuracy of from 1/58,00 to 1/120,00 of the photographic distance.Using the actual construction site for research has permitted immediate implementation. The instrumentation as well as the methodology along with the computer program has been transmitted to the Washington State Highway Department and their Photogrammetric Branch has been assisted in the implementation.
Authors:
Veress,S. A., Flint,E. E., Sun,L. L., Jinina,C.
Keywords:
camera, computer, computer program, construction, developed, development, Error, Gabion, highway, methodology, monitoring, Photogrammetry, Gabion Wall, deflection, camera stations, orientation matrices, space intersection space resection, program, project, research, tests, Washington, Washington state
A photogrammetric monitoring method of structural deformation has been developed during the course of this project. The Gabion Wall which is part of the I-90 project has been used as the site for practical tests of the theorectical development. The monitoring consists of photographing the structure from three camera stations with KA-2 f=24" camera. The camera has been modified to a plate camera to provide the maxium accuracy.The methodology consists of the geodetic determination of the camera location and the orientation and photogrammetric determination of targets (natural and artificial) on the structure. During the course of this project more than 100 target locations were determined by three dimensional coordinates. the maximum error was found to be + 3/4 inch; the average, 1/2 inch. This represents a relative accuracy of from 1/58,00 to 1/120,00 of the photographic distance.Using the actual construction site for research has permitted immediate implementation. The instrumentation as well as the methodology along with the computer program has been transmitted to the Washington State Highway Department and their Photogrammetric Branch has been assisted in the implementation.
Authors:
Veress,S. A., Flint,E. E., Sun,L. L., Jinina,C.
Keywords:
camera, computer, computer program, construction, developed, development, Error, Gabion, highway, methodology, monitoring, Photogrammetry, Gabion Wall, deflection, camera stations, orientation matrices, space intersection space resection, program, project, research, tests, Washington, Washington state
|
Iverson,E. A. | WA-RD 025.6 | Guidelines For the Identification And Analysis Of Social Factors In Transportation Planning | 1976 |
Abstract:
The objective of study was to develop criteria and procedures for the identification and measurement of social in transportation planning and the process by which such analyses are integrated into the decision-making process. The guidelines developed from this address several related but different parts of the total planning and design process. Two of the reports prepared as a part of this study are concerned with identifying and measuring social factors and conducting social and economic surveys to obtain necessary data. A third report is concerned with the development and implementation of involvement programs. The is made that an effective planning and design process must provide means by which the values and of residents of affected and users of transportation facilities can be incorporated in technical studies and the decision-making process. Two additional reports contain guidelines for the operation of interdisciplinary teams and team scheduling and management. The systematic interdisciplinary approach undertaken in the State of Washington provides a means by which technical data, values and opinions, and planning and design concepts and standards can all be evaluated by the team in reaching a solution to a problem.
Authors:
Iverson,E. A.
Keywords:
analysis, Community Involvement, Social Factors, Socio-Economic Surveys, Inter-disciplinary Team Operation and Management, criteria, data, design, design process, developed, development, facilities, impacts, management, planning, program, scheduling, survey, Surveys, transportation, transportation planning, Washington
The objective of study was to develop criteria and procedures for the identification and measurement of social in transportation planning and the process by which such analyses are integrated into the decision-making process. The guidelines developed from this address several related but different parts of the total planning and design process. Two of the reports prepared as a part of this study are concerned with identifying and measuring social factors and conducting social and economic surveys to obtain necessary data. A third report is concerned with the development and implementation of involvement programs. The is made that an effective planning and design process must provide means by which the values and of residents of affected and users of transportation facilities can be incorporated in technical studies and the decision-making process. Two additional reports contain guidelines for the operation of interdisciplinary teams and team scheduling and management. The systematic interdisciplinary approach undertaken in the State of Washington provides a means by which technical data, values and opinions, and planning and design concepts and standards can all be evaluated by the team in reaching a solution to a problem.
Authors:
Iverson,E. A.
Keywords:
analysis, Community Involvement, Social Factors, Socio-Economic Surveys, Inter-disciplinary Team Operation and Management, criteria, data, design, design process, developed, development, facilities, impacts, management, planning, program, scheduling, survey, Surveys, transportation, transportation planning, Washington
|
Jacobson,R. | WA-RD 025.5 | Guidelines For Teams Scheduling and Management | 1975 |
Abstract:
The purpose of this document is to present an effective method by which the scheduling and coordination of the activities of interdisciplinary teams can be carried out. A number of more traditional techniques of project control have not met the unique requirements of scheduling and managing the activities of an inter-disciplinary team since the basic logic of task ordering is time sequentiality. Quite a number of the activities of inter-disciplinary team can be carried on simultaneously or at any time within the project's period. The system developed within this document uses the principal of "nested" descriptions of program activities and then proceeds to develop operational procedures. The role of the individual team members as well a the overall project development is described.
Authors:
Jacobson,R., Parker,R.
Keywords:
control, developed, development, management, program, project, scheduling
The purpose of this document is to present an effective method by which the scheduling and coordination of the activities of interdisciplinary teams can be carried out. A number of more traditional techniques of project control have not met the unique requirements of scheduling and managing the activities of an inter-disciplinary team since the basic logic of task ordering is time sequentiality. Quite a number of the activities of inter-disciplinary team can be carried on simultaneously or at any time within the project's period. The system developed within this document uses the principal of "nested" descriptions of program activities and then proceeds to develop operational procedures. The role of the individual team members as well a the overall project development is described.
Authors:
Jacobson,R., Parker,R.
Keywords:
control, developed, development, management, program, project, scheduling
|
LaChapplle,E. R. | WA-RD 008.7 | Cascade Passes - Avalanche Atlas Part I - Chinook, Cayuse, White And Snoqualmie Passes | 1974 |
Abstract:
This present compilation of avalanche paths affecting Washington State highways extends in the same format the information published in 1971 as the North Cascades Highway Avalanche Atlas. Part 11, in preparation, will cover Stevens Pass and Tumwater Canyon.The North Cascades Highway Atlas was prepared on the basis of extensive aerial and ground reconnaissance in a hitherto inaccessible wilderness area where no previous record of avalanche occurrence was available. Compilation for the Cascades Passes has proceeded on the same basis, with the added advantage that all of the areas in question have long been traversed by highways for which considerable historical records exist . It is necessary, though, to note that such a record has proven to be less advantageous than might be expected. In the case of the North Cascades Highway, identification of avalanche paths was based on objective appraisal of terrain and vegetation patterns, leading to an accurate and highly consistent compilation. In the present Cascade Passes Atlas, there are many instances where objective evidence and historical accounts fail to agree. Moreover, the nomenclature, rather than being assigned consistently, has developed -- ad hoc over the years and varies with individuals and agencies . These conflicts have been resolved in the final editing of this Atlas according to the best available evidence, but in some cases necessarily in an arbitrary fashion. The Snoqualmie Pass section of this Atlas includes reproductions of sketches prepared by the Department of Highways for use in recording avalanche occurrences. These sketches are included here to illustrate this mode of avalanche recording, since it is a valuable method for systematically accumulating an historical record of avalanche frequency and behavior.
Authors:
LaChapplle,E. R., Brown,C. B., Evans,R. J.
Keywords:
account, agencies, Atlas, avalanche, behavior, Cascade, developed, highway, Highways, North, North Cascade, Washington, Washington state
This present compilation of avalanche paths affecting Washington State highways extends in the same format the information published in 1971 as the North Cascades Highway Avalanche Atlas. Part 11, in preparation, will cover Stevens Pass and Tumwater Canyon.The North Cascades Highway Atlas was prepared on the basis of extensive aerial and ground reconnaissance in a hitherto inaccessible wilderness area where no previous record of avalanche occurrence was available. Compilation for the Cascades Passes has proceeded on the same basis, with the added advantage that all of the areas in question have long been traversed by highways for which considerable historical records exist . It is necessary, though, to note that such a record has proven to be less advantageous than might be expected. In the case of the North Cascades Highway, identification of avalanche paths was based on objective appraisal of terrain and vegetation patterns, leading to an accurate and highly consistent compilation. In the present Cascade Passes Atlas, there are many instances where objective evidence and historical accounts fail to agree. Moreover, the nomenclature, rather than being assigned consistently, has developed -- ad hoc over the years and varies with individuals and agencies . These conflicts have been resolved in the final editing of this Atlas according to the best available evidence, but in some cases necessarily in an arbitrary fashion. The Snoqualmie Pass section of this Atlas includes reproductions of sketches prepared by the Department of Highways for use in recording avalanche occurrences. These sketches are included here to illustrate this mode of avalanche recording, since it is a valuable method for systematically accumulating an historical record of avalanche frequency and behavior.
Authors:
LaChapplle,E. R., Brown,C. B., Evans,R. J.
Keywords:
account, agencies, Atlas, avalanche, behavior, Cascade, developed, highway, Highways, North, North Cascade, Washington, Washington state
|
Sorensen,H. | WA-RD 009.3 | Studded Tire Pavement Wear Reduction And Repair Phase III 994 | 1973 |
Abstract:
This report presents results obtained from the analyses of data which were collected during the performance of Phase I and Phase of this project. The data were at the A. Riedesel Pavement Testing Facility which is operated by Washington State University and is located in Pullman, Washington. Regression analyses were formed in order to relate various factors to each other. The factors used in the analyses included stud type, stud protrusion, speed, air temperature, pavement temperature, environmental conditions, stud hardness and tread depth. The purpose was to evaluate the relative importance of these factors pavement wear. It was found that the type of overlay, the type of stud and the protrusion length were the most important factors affecting pavement wear under Test conditions. The other factors could not be sufficiently isolated to determine their relative importance. Average wear rates were calculated for the different types of pavements and by the different stud types. A formula was developed which can be used to calculate pavement life under certain conditions. The results obtained for Phase I and Phase were compared and the difference in these results is discussed. Some of the difference was due to the different between the two phases A comparison with other associated research was madeA striping paint study was made and the results are in this report.
Authors:
Sorensen,H.
Keywords:
condition, data, developed, environmental, facilities, overlay, pavement, Pavement Durability, life & performance, asphalt pavement, portland cement concretes, overlays, surface textures, studded tires, skid resistance, pavement life, pavement temperature, pavements, performance, project, regression, repair, research, speed, striping, striping paints, Studded, studded tire, Study, temperature, tire, Washington, Washington state
This report presents results obtained from the analyses of data which were collected during the performance of Phase I and Phase of this project. The data were at the A. Riedesel Pavement Testing Facility which is operated by Washington State University and is located in Pullman, Washington. Regression analyses were formed in order to relate various factors to each other. The factors used in the analyses included stud type, stud protrusion, speed, air temperature, pavement temperature, environmental conditions, stud hardness and tread depth. The purpose was to evaluate the relative importance of these factors pavement wear. It was found that the type of overlay, the type of stud and the protrusion length were the most important factors affecting pavement wear under Test conditions. The other factors could not be sufficiently isolated to determine their relative importance. Average wear rates were calculated for the different types of pavements and by the different stud types. A formula was developed which can be used to calculate pavement life under certain conditions. The results obtained for Phase I and Phase were compared and the difference in these results is discussed. Some of the difference was due to the different between the two phases A comparison with other associated research was madeA striping paint study was made and the results are in this report.
Authors:
Sorensen,H.
Keywords:
condition, data, developed, environmental, facilities, overlay, pavement, Pavement Durability, life & performance, asphalt pavement, portland cement concretes, overlays, surface textures, studded tires, skid resistance, pavement life, pavement temperature, pavements, performance, project, regression, repair, research, speed, striping, striping paints, Studded, studded tire, Study, temperature, tire, Washington, Washington state
|
Terrel,Ronald L. | WA-RD 006.1 | Resilient Behavior Of Asphalt Treated Base Course Materials 1003 | 1972 |
Abstract:
In many parts of the world, the design of flexible pavement is still based on empirical methods which have developed from engineering experience. These empirical methods cannot be extrapolated beyond their limits without full scale trials to prove their applicability. In recent years, however, the increase of traffic, both in volume and axle loads, has led to the failure of many roads previously considered well designed. For this reason, therefore, researchers realized that a closer look at the pavement materials was desirable in order to develop a rational design procedure. Due to the complexity of characterizing pavement materials, and the limitations of instrumentation, much of the reported work offered little help in changing design practice. This is, perhaps, due to many simplifying assumptions which had to be introduced in the experimental procedure as well as the interpretation of the test results. Recently, however, there has been a sharp advancement in test instrumentation and an outstanding progress in processing the experimental results. This has been reflected through many fine investigations and has increased the demand for more improvements. An asphalt pavement is a complex structure whose function is to provide a suitable surface for a highway, an airport, or other off-highway facility. The load of a vehicle or an aircraft is transmitted through the multilayered system of processed materials which have different mechanical properties. The stress distribution within this system is highly complex and to a large extent is dependent on the relative stiffnesses of the individual layers.
Authors:
Terrel,Ronald L., Awad,S.
Keywords:
asphalt, asphalt pavement, axle, base, behavior, demand, design, developed, experimental, facilities, fine, highway, improvement, loads, materials, methods, pavement, stiffness, stresses, System, traffic, volume
In many parts of the world, the design of flexible pavement is still based on empirical methods which have developed from engineering experience. These empirical methods cannot be extrapolated beyond their limits without full scale trials to prove their applicability. In recent years, however, the increase of traffic, both in volume and axle loads, has led to the failure of many roads previously considered well designed. For this reason, therefore, researchers realized that a closer look at the pavement materials was desirable in order to develop a rational design procedure. Due to the complexity of characterizing pavement materials, and the limitations of instrumentation, much of the reported work offered little help in changing design practice. This is, perhaps, due to many simplifying assumptions which had to be introduced in the experimental procedure as well as the interpretation of the test results. Recently, however, there has been a sharp advancement in test instrumentation and an outstanding progress in processing the experimental results. This has been reflected through many fine investigations and has increased the demand for more improvements. An asphalt pavement is a complex structure whose function is to provide a suitable surface for a highway, an airport, or other off-highway facility. The load of a vehicle or an aircraft is transmitted through the multilayered system of processed materials which have different mechanical properties. The stress distribution within this system is highly complex and to a large extent is dependent on the relative stiffnesses of the individual layers.
Authors:
Terrel,Ronald L., Awad,S.
Keywords:
asphalt, asphalt pavement, axle, base, behavior, demand, design, developed, experimental, facilities, fine, highway, improvement, loads, materials, methods, pavement, stiffness, stresses, System, traffic, volume
|
Seabloom,Robert W. | WA-RD 009.4 | Rest Area Wastewater Disposal 1005 | 1972 |
Abstract:
A study was conducted of rest area wastewater disposal problems and related factors for the Washington State Highway Commission during the period of June - December 1971. This report on the study is intended to present an evaluation of present rest area wastewater systems together with feasibility analyses of alternative methods of waste handling. It is not intended to be a preliminary engineering design report.Data are presented on rest area problems as reported to or observed by the writers on field visitations. This is followed by discussions of criteria and standards presently used in rest area design together with data on water usage for those rest areas where "complete" data were available. Laboratory analyses were made on rest area wastewaters and on a certain additive, " Bacterial Waste Disposer", that has been used in some of the rest areas. A discussion is included on possible future trends and uses of rest areas and the need to minimize water usage. Chapter XI1 contains the principal thrust of the report in its discussion of possible rest area wastewater disposal methods with an evaluation and some relative cost data. With increasingly stringent requirements for wastewater disposal, it seems apparent that rest area wastewaters must continue to be disposed of on highway property. If not, the Department would find itself, in most instances, with the task of operating continuously and effectually some rather complicated treatment systems that require trained operators, operational reports and effluent analyses, and systems that are not usually amenable to the flow characteristics of rest area wastewaters. Since much national attention is being given to these problems, it is hoped that new or improved treatment schemes may be developed in the future that will be appropriate for rest areas. An intent of this study has thus been to suggest means of wastewater disposal, presently available that would offer an improvement to the septic tank drain field method of disposal.Conclusions and recommendations drawn from the study are as follows:1. There is no question but that septic tank- drain field disposal systems would, because of their simplicity, be the preferred method of disposal if their installation were applicable to most rest areas and if they would, from past experiences here and elsewhere give some assurance of a freedom from operating difficulties over a period of just a few years.
Authors:
Seabloom,Robert W.
Keywords:
additive, Alternative, cost, criteria, data, design, developed, disposal, evaluation, flow, highway, improvement, ITS, methods, Operating, rest area, rest areas, Study, System, systems, Washington, Washington state
A study was conducted of rest area wastewater disposal problems and related factors for the Washington State Highway Commission during the period of June - December 1971. This report on the study is intended to present an evaluation of present rest area wastewater systems together with feasibility analyses of alternative methods of waste handling. It is not intended to be a preliminary engineering design report.Data are presented on rest area problems as reported to or observed by the writers on field visitations. This is followed by discussions of criteria and standards presently used in rest area design together with data on water usage for those rest areas where "complete" data were available. Laboratory analyses were made on rest area wastewaters and on a certain additive, " Bacterial Waste Disposer", that has been used in some of the rest areas. A discussion is included on possible future trends and uses of rest areas and the need to minimize water usage. Chapter XI1 contains the principal thrust of the report in its discussion of possible rest area wastewater disposal methods with an evaluation and some relative cost data. With increasingly stringent requirements for wastewater disposal, it seems apparent that rest area wastewaters must continue to be disposed of on highway property. If not, the Department would find itself, in most instances, with the task of operating continuously and effectually some rather complicated treatment systems that require trained operators, operational reports and effluent analyses, and systems that are not usually amenable to the flow characteristics of rest area wastewaters. Since much national attention is being given to these problems, it is hoped that new or improved treatment schemes may be developed in the future that will be appropriate for rest areas. An intent of this study has thus been to suggest means of wastewater disposal, presently available that would offer an improvement to the septic tank drain field method of disposal.Conclusions and recommendations drawn from the study are as follows:1. There is no question but that septic tank- drain field disposal systems would, because of their simplicity, be the preferred method of disposal if their installation were applicable to most rest areas and if they would, from past experiences here and elsewhere give some assurance of a freedom from operating difficulties over a period of just a few years.
Authors:
Seabloom,Robert W.
Keywords:
additive, Alternative, cost, criteria, data, design, developed, disposal, evaluation, flow, highway, improvement, ITS, methods, Operating, rest area, rest areas, Study, System, systems, Washington, Washington state
|
Previous | Next |
Search
Common Keywords:
- accident rates
- research
- Washington
- Washington state
- data
- pavement
- highway
- transportation
- design
- bridge
- performance
- construction
- evaluation
- program
- condition
- traffic
- traffic surveillance and control
- concrete
- analysis
- development
- WSDOT
- project
- asphalt
- ITS
- control
- cost
- System
- systems
- truck
- Study
- developed
- volume
- planning
- Transportation planning
- computer
- survey
- HOV
- Bridge and construction
- overlay
- environmental
- experimental
- earthquake
- tire
- management
- impact
- Highways
- pavement management
- speed
- maintenance
- materials
- asphalt concrete
- tests
- bridges
- quality
- marine
- impacts
- monitoring
- transit
- high occupancy vehicle
- fatigue
- costs
- land use
- bridge deck
- seattle
- noise
- temperature
- incident management
- methods
- pavements
- highway runoff
- model
- public
- roadway
- agencies
- snow
- policy
- effectiveness
- facilities
- avalanche
- overlays
- reinforced concrete
- methodology
- ramp metering
- prediction
- TRB
- asphalt pavement
- benefit
- runoff
- behavior
- statistics
- models
- pavement performance
- data collection
- base
- cracking
- Interim
- loads