TRAC Reports
To sort the reports, click on a heading: Authors, Report #, Report Title, Year, or Publisher.
To download a report's pdf or see the abstract, click on the report.
Search returned 49 reports containing keyword: 'analysis'
clear results
Previous |
Search
|
Next |
Authors |
Report # |
Report Title |
Year |
Publisher |
---|
Kopf,J. | WA-RD 619.1 | Measurement of Recurring and Non-Recurring Congestion: Phase 2 | 2005 | TRAC/UW |
Abstract:
In 2003, the Washington State Department of Transportation (WSDOT) initiated a research effort to develop and test a methodology for estimating congestion delay on Seattle area freeways. The initial phase of the research developed a preliminary methodology for both measuring congestion and assigning that congestion to specific lane blocking incidents. In Phase 2 of this study, that methodology was automated and extended to include an examination of the effects of incidents occurring on the shoulders of the freeway, spillback from incident-caused congestion on one freeway that affects a second freeway that feeds traffic onto the initially congested facility, special events, and weather. Because funding for this effort was extremely limited, only three corridors (with both directions analyzed independently) and two months of data were analyzed. The project found that the Phase 1 methodology works well in assigning traffic congestion that occurs in the immediate time frame and geographic location of incidents to those incidents. It also showed that this process can be automated, making the data preparation effort now the primary determinant of the cost of additional work of this kind. Unfortunately, even with the addition of shoulder incidents, special events, and weather to lane blocking events, the automated process is unable to assign a significant proportion of the non-recurring delay occurring on Seattle freeways. The detailed analysis of freeway performance showed that much of the delay caused by specific incidents occurs in places or at times removed from the incident itself. The result is that much of the observed non-recurring delay can not be assigned to specific causes by the current analytical process. New analytical procedures will need to be developed in Phase 3 of this work. The Phase 2 analysis also confirmed that the congestion effects of specific incidents and other traffic disruptions are highly dependent on the background traffic conditions at the time of the disruption. While the Phase 2 analysis did not produce all of the results desired, the additional analyses showed that the summary statistics output from the Phase 2 software are useful as input to other analytical procedures.
Authors:
Kopf,J., Nee,J., Ishimaru,J. M., Hallenbeck,M. E.
Keywords:
congestion causes, freeway performance, traffic congestion, Washington, Washington state, transportation, WSDOT, research, methodology, congestion, seattle, freeway, developed, incident, Study, effects, traffic, facilities, corridors, data, project, cost, analysis, performance, in-place, condition, statistics, software
In 2003, the Washington State Department of Transportation (WSDOT) initiated a research effort to develop and test a methodology for estimating congestion delay on Seattle area freeways. The initial phase of the research developed a preliminary methodology for both measuring congestion and assigning that congestion to specific lane blocking incidents. In Phase 2 of this study, that methodology was automated and extended to include an examination of the effects of incidents occurring on the shoulders of the freeway, spillback from incident-caused congestion on one freeway that affects a second freeway that feeds traffic onto the initially congested facility, special events, and weather. Because funding for this effort was extremely limited, only three corridors (with both directions analyzed independently) and two months of data were analyzed. The project found that the Phase 1 methodology works well in assigning traffic congestion that occurs in the immediate time frame and geographic location of incidents to those incidents. It also showed that this process can be automated, making the data preparation effort now the primary determinant of the cost of additional work of this kind. Unfortunately, even with the addition of shoulder incidents, special events, and weather to lane blocking events, the automated process is unable to assign a significant proportion of the non-recurring delay occurring on Seattle freeways. The detailed analysis of freeway performance showed that much of the delay caused by specific incidents occurs in places or at times removed from the incident itself. The result is that much of the observed non-recurring delay can not be assigned to specific causes by the current analytical process. New analytical procedures will need to be developed in Phase 3 of this work. The Phase 2 analysis also confirmed that the congestion effects of specific incidents and other traffic disruptions are highly dependent on the background traffic conditions at the time of the disruption. While the Phase 2 analysis did not produce all of the results desired, the additional analyses showed that the summary statistics output from the Phase 2 software are useful as input to other analytical procedures.
Authors:
Kopf,J., Nee,J., Ishimaru,J. M., Hallenbeck,M. E.
Keywords:
congestion causes, freeway performance, traffic congestion, Washington, Washington state, transportation, WSDOT, research, methodology, congestion, seattle, freeway, developed, incident, Study, effects, traffic, facilities, corridors, data, project, cost, analysis, performance, in-place, condition, statistics, software
|
http://www.wsdot.wa.gov/research/reports/fullreports/619.1.pdf http://wsdot.wa.gov/Research/Reports/600/619.1.htm |
Nee,J. | WA-RD 584.2 | HOV Lane Performance Monitoring 2002 Report -- Vol. 1 | 2004 | TRAC/UW |
Abstract:
High occupancy vehicle (HOV) lanes, also known as carpool lanes and diamond lanes, are designated for use by carpoolers, transit riders, ride sharers and motorcyclists that meet the occupancy requirement. By restricting access, the HOV lanes benefit users by allowing them to travel the freeway system at a faster speed, thus saving time, and experiencing greater time reliability in comparison to motorists on general purpose (GP) lanes. To accurately evaluate the system's effectiveness, a state policy requires an annual HOV system report to document system performance, examining the HOV lanes' person-carrying capability, travel time savings, and trip reliability benefits in comparison to adjacent GP lanes. HOV lane violation rates are also evaluated. This report describes the results of an extensive monitoring effort of HOV lane use and performance in the Puget Sound area in 2002. It presents an analysis of data collected to describe the number of people and vehicles that use HOV lanes, the reliability of the HOV lanes, the travel time savings in comparison to GP lanes, violation rates and public perceptions. This information is intended to serve as reliable input for transportation decision makers and planners in evaluating the impact and adequacy of the existing HOV lane system in the Puget sound area, and in planning for other HOV facilities. This is volume 1 of a two-volume set. Volume 2 provides an overview of major trends in HOV lane performance by comparing data presented in the 2000 HOV Performance Report.
Authors:
Nee,J., Ishimaru,J. M., Hallenbeck,M. E.
Keywords:
analysis, benefit, benefits, carpool, data, facilities, freeway, GP lanes, high occupancy, high occupancy vehicle, HOV, HOV facilities, HOV lanes, HOV performance, monitoring, occupancy, performance, performance monitoring, planning, policy, public, reliability, research, speed, transit, transportation, travel time, violation, volume
High occupancy vehicle (HOV) lanes, also known as carpool lanes and diamond lanes, are designated for use by carpoolers, transit riders, ride sharers and motorcyclists that meet the occupancy requirement. By restricting access, the HOV lanes benefit users by allowing them to travel the freeway system at a faster speed, thus saving time, and experiencing greater time reliability in comparison to motorists on general purpose (GP) lanes. To accurately evaluate the system's effectiveness, a state policy requires an annual HOV system report to document system performance, examining the HOV lanes' person-carrying capability, travel time savings, and trip reliability benefits in comparison to adjacent GP lanes. HOV lane violation rates are also evaluated. This report describes the results of an extensive monitoring effort of HOV lane use and performance in the Puget Sound area in 2002. It presents an analysis of data collected to describe the number of people and vehicles that use HOV lanes, the reliability of the HOV lanes, the travel time savings in comparison to GP lanes, violation rates and public perceptions. This information is intended to serve as reliable input for transportation decision makers and planners in evaluating the impact and adequacy of the existing HOV lane system in the Puget sound area, and in planning for other HOV facilities. This is volume 1 of a two-volume set. Volume 2 provides an overview of major trends in HOV lane performance by comparing data presented in the 2000 HOV Performance Report.
Authors:
Nee,J., Ishimaru,J. M., Hallenbeck,M. E.
Keywords:
analysis, benefit, benefits, carpool, data, facilities, freeway, GP lanes, high occupancy, high occupancy vehicle, HOV, HOV facilities, HOV lanes, HOV performance, monitoring, occupancy, performance, performance monitoring, planning, policy, public, reliability, research, speed, transit, transportation, travel time, violation, volume
|
http://www.wsdot.wa.gov/research/reports/fullreports/584.2.pdf http://wsdot.wa.gov/Research/Reports/500/584.2.htm |
Li, J. | WA-RD 588.1 | Application of HDM-4 in the WSDOT Highway System | 2004 | TRAC/UW |
Abstract:
This project performed extensive study and systematic research on the application of the Highway Development and Management system (HDM-4) to the Washington State Department of Transportation (WSDOT) highway system. Data processing, testing, calibration, and analysis were executed to provide the WSDOT with a new budget planning tool. HDM-4 flexible pavement deterioration models were calibrated with the assistance of the Washington State Pavement Management System. A method to calibrate concrete pavement distress models is proposed. This research also explored the application of HDM-4 analysis at the project, program, and strategic levels. The applications include prediction of pavement conditions during a defined analysis period, calculation of required budgets for optimal pavement conditions and maximum economic indicators, establishment of optimized work programs under varying levels of constrained budgets, and other applications for WSDOT.
Authors:
Li, J., Muench, S.T., Mahoney, J.P., Pierce, L., Sivaneswaran, N.
Keywords:
HDM-4, models, pavement maintenance, pavement management, pavement performance, Pavement preservation, vehicle operating costs, research, highway, development, management, management system, Washington, Washington state, transportation, WSDOT, data, calibration, analysis, planning, pavement, deterioration, concrete, program, applications, prediction, condition, indicators
This project performed extensive study and systematic research on the application of the Highway Development and Management system (HDM-4) to the Washington State Department of Transportation (WSDOT) highway system. Data processing, testing, calibration, and analysis were executed to provide the WSDOT with a new budget planning tool. HDM-4 flexible pavement deterioration models were calibrated with the assistance of the Washington State Pavement Management System. A method to calibrate concrete pavement distress models is proposed. This research also explored the application of HDM-4 analysis at the project, program, and strategic levels. The applications include prediction of pavement conditions during a defined analysis period, calculation of required budgets for optimal pavement conditions and maximum economic indicators, establishment of optimized work programs under varying levels of constrained budgets, and other applications for WSDOT.
Authors:
Li, J., Muench, S.T., Mahoney, J.P., Pierce, L., Sivaneswaran, N.
Keywords:
HDM-4, models, pavement maintenance, pavement management, pavement performance, Pavement preservation, vehicle operating costs, research, highway, development, management, management system, Washington, Washington state, transportation, WSDOT, data, calibration, analysis, planning, pavement, deterioration, concrete, program, applications, prediction, condition, indicators
|
http://www.wsdot.wa.gov/research/reports/fullreports/588.1.pdf http://wsdot.wa.gov/Research/Reports/500/588.1.htm |
Kristof,T. | WA-RD 597.1 | Assessing the Benefits of Traveler and Transportation Information Systems | 2004 | TRAC/UW |
Abstract:
The goal of advanced traveler information systems (ATIS) is to provide travelers with information that will facilitate their decisions concerning route choice, departure time, trip delay or elimination, and mode of transportation. The benefits of ATIS projects can be evaluated through field studies, simulation software, and surveys. An evaluation method called the ITS Deployment Analysis System (IDAS) is suggested for use by the Washington State Department of Transportation (WSDOT). IDAS is a "sketch" planning tool intended for screening and prioritizing all intelligent transportation systems (ITS) projects (not just ATIS projects). The software evaluates a number of benefits. These are determined by changes attributable to the deployment of ITS in vehicle miles traveled (VMT), vehicle hours traveled (VHT), volume-capacity (v/c) ratios, and vehicle speeds throughout a given network. The IDAS evaluation depends on a number of assumptions that affect the calculations of costs and benefits. The IDAS developers recommend that these assumptions be inspected by local agencies and adjusted to better represent local conditions. The assumptions about the impacts on VMT, VHT, v/c ratios, and vehicle speed are particularly important. Consequently, suggestions are made within this report for adjustments that WSDOT should make to these default values. These values will allow the WSDOT to successfully employ IDAS for ATIS evaluation.
Authors:
Kristof,T., Lowry,M., Rutherford,G. S.
Keywords:
advanced traveler information systems, agencies, analysis, Assessing, ATIS, ATIS benefits, ATIS evaluation, benefit, benefits, condition, cost, costs, Deployment, evaluation, IDAS, impact, impacts, information systems, Intelligent transportation system, intelligent transportation systems, ITS, ITS Deployment Analysis System, planning, prioritizing, project, research, software, speed, Study, survey, Surveys, System, systems, transportation, traveler information, Washington, Washington state, WSDOT
The goal of advanced traveler information systems (ATIS) is to provide travelers with information that will facilitate their decisions concerning route choice, departure time, trip delay or elimination, and mode of transportation. The benefits of ATIS projects can be evaluated through field studies, simulation software, and surveys. An evaluation method called the ITS Deployment Analysis System (IDAS) is suggested for use by the Washington State Department of Transportation (WSDOT). IDAS is a "sketch" planning tool intended for screening and prioritizing all intelligent transportation systems (ITS) projects (not just ATIS projects). The software evaluates a number of benefits. These are determined by changes attributable to the deployment of ITS in vehicle miles traveled (VMT), vehicle hours traveled (VHT), volume-capacity (v/c) ratios, and vehicle speeds throughout a given network. The IDAS evaluation depends on a number of assumptions that affect the calculations of costs and benefits. The IDAS developers recommend that these assumptions be inspected by local agencies and adjusted to better represent local conditions. The assumptions about the impacts on VMT, VHT, v/c ratios, and vehicle speed are particularly important. Consequently, suggestions are made within this report for adjustments that WSDOT should make to these default values. These values will allow the WSDOT to successfully employ IDAS for ATIS evaluation.
Authors:
Kristof,T., Lowry,M., Rutherford,G. S.
Keywords:
advanced traveler information systems, agencies, analysis, Assessing, ATIS, ATIS benefits, ATIS evaluation, benefit, benefits, condition, cost, costs, Deployment, evaluation, IDAS, impact, impacts, information systems, Intelligent transportation system, intelligent transportation systems, ITS, ITS Deployment Analysis System, planning, prioritizing, project, research, software, speed, Study, survey, Surveys, System, systems, transportation, traveler information, Washington, Washington state, WSDOT
|
http://www.wsdot.wa.gov/research/reports/fullreports/597.1.pdf http://wsdot.wa.gov/Research/Reports/500/597.1.htm |
Hallenbeck,M. E. | NCHRP Report 509 - Equipment for Collecting Traffic Load Data | 2004 | TRAC/UW & Cambridge Systematics, Inc |
Abstract:
This report identifies the key issues that must be considered by state and other highway operating agencies in selecting traffic equipment for collecting the truck volumes and load spectra needed for analysis and design of pavement structures. The report also identifies steps that must be taken to ensure that the equipment performs appropriately and that, as a consequence, the data collected accurately describe the vehicles being monitored. The report is a useful resource for state personnel and others involved in the planning and design of highway pavements and structures.
Authors:
Hallenbeck,M. E., Weinblatt,H.
Keywords:
analysis, data, design, highway, pavement, pavements, structures, traffic, truck, volume, Miscellaneous Library
This report identifies the key issues that must be considered by state and other highway operating agencies in selecting traffic equipment for collecting the truck volumes and load spectra needed for analysis and design of pavement structures. The report also identifies steps that must be taken to ensure that the equipment performs appropriately and that, as a consequence, the data collected accurately describe the vehicles being monitored. The report is a useful resource for state personnel and others involved in the planning and design of highway pavements and structures.
Authors:
Hallenbeck,M. E., Weinblatt,H.
Keywords:
analysis, data, design, highway, pavement, pavements, structures, traffic, truck, volume, Miscellaneous Library
Avery,R. P. | WA-RD 563.1 | Central Puget Sound Freeway Network Usage and Performance, 2001 Update | 2003 | TRAC/UW |
Abstract:
This summary report presents an overview of the level of traveler usage (e.g., how many vehicles use the freeways) and travel performance (e.g., how fast they are traveling, where and how often congestion ocurs) on the principal urban freeways in the central Puget Sound area. The freeways studied in this project are managed by the Washington State Department of Transportation (WSDOT) using its FLOW system, a coordinated network of traffic monitoring, measuring, information dissemination, and control devices that operates on urban state and Interstate highways in the central Puget Sound region. Data presented in this report were collected by the WSDOT's freeway surveillance system. The project that led to this report is intended to meet two separate purposes: 1) to enhance WSDOT's ability to monitor and improve its traffic management efforts on Seattle-area highways, and 2) to provide useful information to the public and decision makers about the status of the freeway system's operational performance. This report is primarily intended to meet the second of these objectives. However, the software developed to assist in freeway data analysis for this project and many of the graphics presented in this report are directly applicable to the first objective.
Authors:
Avery,R. P., Ishimaru,J. M., Nee,J., Hallenbeck,M. E.
Keywords:
analysis, Archived Data User Services (ADUS), congestion, congestion monitoring, control, data, flow, freeway, freeway performance, highway, information dissemination, ITS, management, monitoring, performance, public, research, surveillance, traffic, traffic management, traffic monitoring, transportation, urban, Washington, Washington state, WSDOT
This summary report presents an overview of the level of traveler usage (e.g., how many vehicles use the freeways) and travel performance (e.g., how fast they are traveling, where and how often congestion ocurs) on the principal urban freeways in the central Puget Sound area. The freeways studied in this project are managed by the Washington State Department of Transportation (WSDOT) using its FLOW system, a coordinated network of traffic monitoring, measuring, information dissemination, and control devices that operates on urban state and Interstate highways in the central Puget Sound region. Data presented in this report were collected by the WSDOT's freeway surveillance system. The project that led to this report is intended to meet two separate purposes: 1) to enhance WSDOT's ability to monitor and improve its traffic management efforts on Seattle-area highways, and 2) to provide useful information to the public and decision makers about the status of the freeway system's operational performance. This report is primarily intended to meet the second of these objectives. However, the software developed to assist in freeway data analysis for this project and many of the graphics presented in this report are directly applicable to the first objective.
Authors:
Avery,R. P., Ishimaru,J. M., Nee,J., Hallenbeck,M. E.
Keywords:
analysis, Archived Data User Services (ADUS), congestion, congestion monitoring, control, data, flow, freeway, freeway performance, highway, information dissemination, ITS, management, monitoring, performance, public, research, surveillance, traffic, traffic management, traffic monitoring, transportation, urban, Washington, Washington state, WSDOT
|
http://www.wsdot.wa.gov/research/reports/fullreports/563.1.pdf http://wsdot.wa.gov/Research/Reports/500/563.1.htm |
Rowland,E. R. | WA-RD 545.1 | Modeling Hydrology For Design Of Fish Passage Structures 50 | 2002 |
Abstract:
An estimated 2,400 to 4,000 hydraulic structures are barriers to fish passage in Washington State. Many are culverts inadequately sized for fish Recently, the Washington Department of Fish and Wildlife established statewide guidelines to incorporate fish migration into culvert design by providing two approaches: stream simulation and hydraulic design. Stream simulation involves culverts to be wider than the natural channel under bank-full conditions. The hydraulic design option requires culverts to satisfy minimum depth and maximum hydraulic drop constraints ranging from 0.8 to 1.0 A and permissible velocities from 2.0 to 6.0 depending on species and culvert length. The permissible velocity criterion is to be met during fish passage design flow. A new model is presented for fish passage design flows at streams in Eastern Washington. The model is founded on two key concepts: a unique definition of fish passage design flow and an area based approach for estimating flow at ungaged streams. The fish design flow was developed by combining the concepts of allowable fish delay, established to be 3 days, with a consecutive day analysis. This design flow ensures that fish are not delayed for than 3 consecutive days during a water year. A fish passage design flow per area is assigned to previously delineated subwatersheds in Eastern Washington. Similarity relationships, derived basin characteristics, relate Geological Survey gaging stations to sub-watersheds in Eastern Washington. These relationships form the basis for a value of fish passage design flow per unit area to each sub-watershed in Eastern Washington. The percent standard error for this model was calculated as 36%. This is a significant improvement the 75% standard error calculated for the model that previously addressed fish passage design flows in Eastern Washington.
Authors:
Rowland,E. R., Hotchkiss,R. H., Barber,M. E.
Keywords:
analysis, barrier, barriers, Channel, condition, culvert, design, design flows, developed, Error, fish, fish passage, flow, hydrologic models, improvement, model, modeling, structural safety, structures, survey, velocity, Washington, Washington state, wildlife
An estimated 2,400 to 4,000 hydraulic structures are barriers to fish passage in Washington State. Many are culverts inadequately sized for fish Recently, the Washington Department of Fish and Wildlife established statewide guidelines to incorporate fish migration into culvert design by providing two approaches: stream simulation and hydraulic design. Stream simulation involves culverts to be wider than the natural channel under bank-full conditions. The hydraulic design option requires culverts to satisfy minimum depth and maximum hydraulic drop constraints ranging from 0.8 to 1.0 A and permissible velocities from 2.0 to 6.0 depending on species and culvert length. The permissible velocity criterion is to be met during fish passage design flow. A new model is presented for fish passage design flows at streams in Eastern Washington. The model is founded on two key concepts: a unique definition of fish passage design flow and an area based approach for estimating flow at ungaged streams. The fish design flow was developed by combining the concepts of allowable fish delay, established to be 3 days, with a consecutive day analysis. This design flow ensures that fish are not delayed for than 3 consecutive days during a water year. A fish passage design flow per area is assigned to previously delineated subwatersheds in Eastern Washington. Similarity relationships, derived basin characteristics, relate Geological Survey gaging stations to sub-watersheds in Eastern Washington. These relationships form the basis for a value of fish passage design flow per unit area to each sub-watershed in Eastern Washington. The percent standard error for this model was calculated as 36%. This is a significant improvement the 75% standard error calculated for the model that previously addressed fish passage design flows in Eastern Washington.
Authors:
Rowland,E. R., Hotchkiss,R. H., Barber,M. E.
Keywords:
analysis, barrier, barriers, Channel, condition, culvert, design, design flows, developed, Error, fish, fish passage, flow, hydrologic models, improvement, model, modeling, structural safety, structures, survey, velocity, Washington, Washington state, wildlife
|
http://www.wsdot.wa.gov/research/reports/fullreports/545.1.pdf http://wsdot.wa.gov/Research/Reports/500/545.1.htm |
Ishimaru,J. M. | WA-RD 555.1 | North Seattle Advanced Traffic Management System (NSATMS) Project Evaluation | 2002 | TRAC/UW |
Abstract:
This report documents the findings of the evaluation of the North Seattle Advanced Traffic Management System (NSATMS) Project. The evaluation was originally designed to analyze the potential transportation benefits and costs of a regional arterial traffic data sharing system that would obtain traffic signal system information (volumes, signal timing plans, etc.) from participating agencies and then share the data among those agencies. The operational goal was to allow each agency to make better control decisions by providing it with real-time knowledge of traffic conditions outside of its own control system boundaries. Because of a series of technical and project management issues, the system as originally envisioned was not successfully implemented. As a result, this evaluation does not include an analysis of direct operational benefits. It does, however, include a discussion of the expected institutional benefits, as well as an extensive "lessons learned" section based on the project team's review of the NSATMS effort. Of particular note were the importance of effective and ongoing lines of project communication, and the critical need to properly evaluate the fundamental nature of the project and provide a well-matched project management structure. The lessons learned from this project provide instructive guidelines for those who are contemplating future ITS system development efforts of comparable scope and complexity. Despite the limited successes of the NSATMS effort, the evaluation team found continued support for the regional arterial ATMS concept within the Puget Sound region. Follow-on research that contributes to a better understanding of the benefits, costs, and technical requirements of an arterial traffic management system is desired by many of the project participants.
Authors:
Ishimaru,J. M., Hallenbeck,M. E.
Keywords:
intelligent transportation systems, advanced traffic management systems, arterial signal control systems, traffic control strategies, Archived Data User Services (ADUS), data sharing, evaluation, seattle, advanced traffic management systems, traffic, traffic management, management, management system, transportation, transportation benefit, benefits, benefit, costs, cost, arterial, traffic data, data, volume, control, condition, ITS, project management, analysis, line, development, ATMS, research
This report documents the findings of the evaluation of the North Seattle Advanced Traffic Management System (NSATMS) Project. The evaluation was originally designed to analyze the potential transportation benefits and costs of a regional arterial traffic data sharing system that would obtain traffic signal system information (volumes, signal timing plans, etc.) from participating agencies and then share the data among those agencies. The operational goal was to allow each agency to make better control decisions by providing it with real-time knowledge of traffic conditions outside of its own control system boundaries. Because of a series of technical and project management issues, the system as originally envisioned was not successfully implemented. As a result, this evaluation does not include an analysis of direct operational benefits. It does, however, include a discussion of the expected institutional benefits, as well as an extensive "lessons learned" section based on the project team's review of the NSATMS effort. Of particular note were the importance of effective and ongoing lines of project communication, and the critical need to properly evaluate the fundamental nature of the project and provide a well-matched project management structure. The lessons learned from this project provide instructive guidelines for those who are contemplating future ITS system development efforts of comparable scope and complexity. Despite the limited successes of the NSATMS effort, the evaluation team found continued support for the regional arterial ATMS concept within the Puget Sound region. Follow-on research that contributes to a better understanding of the benefits, costs, and technical requirements of an arterial traffic management system is desired by many of the project participants.
Authors:
Ishimaru,J. M., Hallenbeck,M. E.
Keywords:
intelligent transportation systems, advanced traffic management systems, arterial signal control systems, traffic control strategies, Archived Data User Services (ADUS), data sharing, evaluation, seattle, advanced traffic management systems, traffic, traffic management, management, management system, transportation, transportation benefit, benefits, benefit, costs, cost, arterial, traffic data, data, volume, control, condition, ITS, project management, analysis, line, development, ATMS, research
|
http://www.wsdot.wa.gov/research/reports/fullreports/555.1.pdf http://wsdot.wa.gov/Research/Reports/500/555.1.htm |
Holtz,R. D. | WA-RD 532.1 | Internal Stability Analyses of Geosynthetic Reinforced Retaining Walls | 2002 | TRAC/UW |
Abstract:
This research project was an effort to improve our understanding of the internal stress-strain distribution in GRS retaining structures. Our numerical modelling techniques utilized a commercially available element program, FLAC (Fast Lagrangian Analysis of Continua). In this research, we investigated and appropriately considered the plane strain soil properties, the effect of low confining pressure on the soil dilation angle, and in-soil and low strain rate geosynthetic reinforcement properties.Modeling techniques that are able to predict both the internal and external performance of GRS walls simultaneously were developed. Instrumentation measurements such as wall deflection and reinforcement strain distributions of a number of selected case histories were successfully reproduced by our numerical modeling techniques. Moreover, these techniques were verified by successfully performing true "Class A" predictions of three large-scale experimental walls.An extensive parametric study that included more than 250 numerical models was then performed to investigate the influence of design factors such as soil properties, reinforcement stiffness, and reinforcement spacing on GRS wall performance. Moreover, effects of design options such as toe restraint and structural facing systems were examined. An alternative method for internal stress-strain analysis based on the stress-strain behavior of GRS as a composite material was also developed. Finally, the modeling results were used to develop a new technique for predicting GRS wall face deformations and to make recommendations for the internal stability design of GRS walls.
Authors:
Holtz,R. D., Lee,W. F.
Keywords:
analysis, behavior, design, experimental, FLAC, geosynthetic, geotechnical, materials, modeling, models, performance, prediction, pressure, program, reinforcement, research, retaining wall, retaining walls, stability, structures, systems, walls
This research project was an effort to improve our understanding of the internal stress-strain distribution in GRS retaining structures. Our numerical modelling techniques utilized a commercially available element program, FLAC (Fast Lagrangian Analysis of Continua). In this research, we investigated and appropriately considered the plane strain soil properties, the effect of low confining pressure on the soil dilation angle, and in-soil and low strain rate geosynthetic reinforcement properties.Modeling techniques that are able to predict both the internal and external performance of GRS walls simultaneously were developed. Instrumentation measurements such as wall deflection and reinforcement strain distributions of a number of selected case histories were successfully reproduced by our numerical modeling techniques. Moreover, these techniques were verified by successfully performing true "Class A" predictions of three large-scale experimental walls.An extensive parametric study that included more than 250 numerical models was then performed to investigate the influence of design factors such as soil properties, reinforcement stiffness, and reinforcement spacing on GRS wall performance. Moreover, effects of design options such as toe restraint and structural facing systems were examined. An alternative method for internal stress-strain analysis based on the stress-strain behavior of GRS as a composite material was also developed. Finally, the modeling results were used to develop a new technique for predicting GRS wall face deformations and to make recommendations for the internal stability design of GRS walls.
Authors:
Holtz,R. D., Lee,W. F.
Keywords:
analysis, behavior, design, experimental, FLAC, geosynthetic, geotechnical, materials, modeling, models, performance, prediction, pressure, program, reinforcement, research, retaining wall, retaining walls, stability, structures, systems, walls
|
http://www.wsdot.wa.gov/research/reports/fullreports/532.1.pdf http://wsdot.wa.gov/Research/Reports/500/532.1.htm |
Allen,T. M. | WA-RD 528.1 | Application of the K 0-Stiffness Method to Reinforced Soil Wall Limit States Design | 2001 | Washington State Dept. of Transportation |
Abstract:
A new design methodology for estimating reinforcement loads in reinforced soil walls, termed the K 0-Stiffness Method, has been developed. This new method has been demonstrated to more accurately estimate reinfocement loads and strains in reinforced soil walls than do current design methodologies. Step-by-step procedures are provided to lead the designer through the reinforced soil wall internal stability design process using this new methodology. These step-by-step design procedures have been developed with a limit states design approach consistent with current design codes (in North America this is termed Load and Resistance Factor Design, or LRFD). Specifically, consideration has been given to strength and serviceability limit states. Load and resistance factors, based on statistical data where feasible, have been developed for use with this method. The results of examples from actual wall case histories were summarized and analyzed to assess how well the new methodology performs relative to current design practice. From this analysis of the design examples, the following was observed: For geosynthetic walls, the K 0-Stiffness Method has the potential to reduce required backfill reinforcement capacity relative to current design methodology by a factor of 1.2 to 3. For steel reinforced soil walls, the reduction in the reinforcement capacity relative to what is required by current design methodology is more modest, on the order of 1.0 to 2.1. Given these findings, use of the K 0-Stiffness Method can result in substantial cost savings, especially for geosynthetic walls, because of reduced reinforcement needs.
Authors:
Allen,T. M., Bathurst,R. J.
Keywords:
reinforcement, walls, loads, strains, creep, design, research, methodology, soil, developed, stability, design process, codes, North, resistance, strength, data, analysis, geosynthetic, steel, cost
A new design methodology for estimating reinforcement loads in reinforced soil walls, termed the K 0-Stiffness Method, has been developed. This new method has been demonstrated to more accurately estimate reinfocement loads and strains in reinforced soil walls than do current design methodologies. Step-by-step procedures are provided to lead the designer through the reinforced soil wall internal stability design process using this new methodology. These step-by-step design procedures have been developed with a limit states design approach consistent with current design codes (in North America this is termed Load and Resistance Factor Design, or LRFD). Specifically, consideration has been given to strength and serviceability limit states. Load and resistance factors, based on statistical data where feasible, have been developed for use with this method. The results of examples from actual wall case histories were summarized and analyzed to assess how well the new methodology performs relative to current design practice. From this analysis of the design examples, the following was observed: For geosynthetic walls, the K 0-Stiffness Method has the potential to reduce required backfill reinforcement capacity relative to current design methodology by a factor of 1.2 to 3. For steel reinforced soil walls, the reduction in the reinforcement capacity relative to what is required by current design methodology is more modest, on the order of 1.0 to 2.1. Given these findings, use of the K 0-Stiffness Method can result in substantial cost savings, especially for geosynthetic walls, because of reduced reinforcement needs.
Authors:
Allen,T. M., Bathurst,R. J.
Keywords:
reinforcement, walls, loads, strains, creep, design, research, methodology, soil, developed, stability, design process, codes, North, resistance, strength, data, analysis, geosynthetic, steel, cost
|
http://www.wsdot.wa.gov/research/reports/fullreports/528.1.pdf http://wsdot.wa.gov/Research/Reports/500/528.1.htm |
Leahy,R. B. | WA-RD 486.1 | Superpave--Washington DOT's Assessment and Status | 1999 | Civil Construction and Environmental Engineer |
Abstract:
Funded by the 1987 Intermodal Surface Transportation Efficiency Act, the Strategic Highway Research Program (SHRP), was a five year, $150 million research program to improve the performance of the nation's roads by addressing four key areas: concrete and structures; highway safety and maintenance; asphalt; and long-term pavement performance. Nearly one-third of the $150 million was allocated for the study of asphalt, specifically to develop performance based specifications that would relate material properties of the binder and the mix to field performance. Superpave (Superior PERforming asphalt PAVEments) encompasses the products of the SHRP asphalt research program and consists of three interrelated elements: an asphalt binder specification with supporting tests; a mix design and analysis system with supporting tests; and performance prediction models. This report is a compilation and synthesis of Washington DOT's (WSDOT) experience with selected components and concepts of the SHRP/Superpave technology to include the following: performance graded (PG) binder usage and specification validation; gyratory mix design; the Superpave Shear Test (SST); and field performance of the Superpave mixes.Binders typically specified by WSDOT (AR400OW and PBAs -2, -5, -6. -6GR) were classified in terms of five Superpave performance grades: PG 58-22; 64-22; 64-28; 64-34; and 70-28. Although data from 171 weather stations suggest that as many as 6 low- and 5 high-temperature grades could be specified, binder availability and regional pavement distress were used to develop guidelines for statewide PG usage. Three binders were recommended for use in the western, northeastern and southeastern regions of the state as follows: PG 58-22; PG 58-34; and PG 64-28, respectively. Validation of the binder specification with respect to low temperature cracking was accomplished using binder and field performance data from 28 projects. The results were very encouraging: the original SHRP algorithm for binder selection correctly "predicted" field performance in 22 of 28 cases, whereas the LTPP algorithm for binder selection correctly "predicted" field performance in 26 of 28 cases.Additionally, a laboratory experiment using the Superpave Shear Test (SST) apparatus was undertaken to test the effectiveness of binder "bumping," i.e., increasing the high temperature grade because of exceptionally high traffic volume and/or slow or standing traffic. The data clearly indicate that the SST is an effective tool for discriminating between binders and that 'bumping" may be effective in reducing pavement rutting. Permanent shear strain for specimens made with a PB 70-xx binder was only 25 to 33% of the shear strain for specimens made with a PG 58-xx binder.As originally configured, the Superpave mix design matrix included seven traffic levels and four temperature regimes for 28 possible compaction levels. Recognizing that the 28 compaction levels made for a somewhat unwieldy system, WSDOT attempted to reduce the number of compaction levels by conducting a series of mix designs at each compaction level. The results of the limited experiment suggest that it might be possible to limit the number of compaction levels required for mix design. Research by Brown et. al. (NCHRP 99) tends to confirm this as they have suggested reducing the number of compaction levels and provided more definitive guidance with respect to each level.Since 1993 WSDOT has place 44 projects which include some component of the Superp ave technology. For 17 of these projects parallel Hveem and Superpave mix designs were conducted. In 13 of the 17 cases, the Superpave design asphalt content was equal to or greater than the Hveem design asphalt content, though the difference was usually no more than 0.2%. A fundamental difference between Hveem and Superpave mix design methods is the compaction device. Data from these field projects indicate that the current kneading and gyratory compaction protocols (at least for 109 gyrations) yield similar air void contents.As noted previously, Washington DOT has placed 44 projects which involve some component of the Superpave technology. For 18 of the projects a conventional Hveem mix design was conducted using a PG binder (Hveem-PG). The remaining 26 projects were truly Superpave, i.e., the materials selection and mix design were established in accordance with the Asphalt Institute's SP2, Superpave Level 1 Mix Design. According to WSDOT practice the following numerical indices trigger maintenance: Pavement Structural Condition (PSC) 10 mm; or International Roughness Index (IRI) > 500 cnVkm. Although relatively "young", the 44 projects are performing quite well. The average values of rutting, PSC, and IRI (4, 91, and 121, respectively) are all well below the "trigger" values. With respect to rutting and PSC, the performance of Hveem-PG and Superpave projects is virtually identical. However, the ride quality of the Superpave projects is a bit rougher than the Hveem-PG binder projects: IRI of 134 for the former and 103 for the latter. The higher values of IRI measured on the Superpave projects may be the result of the typically coarser aggregate gradation or differences in construction techniques.WSDOT's Superpave experience has not been without challenges. Still, its overall experience has been very encouraging. Experimentation with the revised compaction matrix, continued use of the SST, field validation of the "bumping" experiment, and long-term monitoring of field performance will provide the necessary data to allow WSDOTs critical assessment of Superpave's technical merit and economic viability.
Authors:
Leahy,R. B., Briggs,R. N.
Keywords:
SHRP, Superpave, asphalt, intermodal, transportation, transportation efficiency, highway, research, program, performance, concrete, structures, highway safety, safety, maintenance, pavement, specifications, specification, asphalt pavement, pavements, tests, design, analysis, prediction, models, Washington, WSDOT, data, temperature, cracking, LTPP, traffic, volume, compaction, materials, condition, international roughness index, roughness, index, ride quality, quality, aggregate, construction, ITS, monitoring
Funded by the 1987 Intermodal Surface Transportation Efficiency Act, the Strategic Highway Research Program (SHRP), was a five year, $150 million research program to improve the performance of the nation's roads by addressing four key areas: concrete and structures; highway safety and maintenance; asphalt; and long-term pavement performance. Nearly one-third of the $150 million was allocated for the study of asphalt, specifically to develop performance based specifications that would relate material properties of the binder and the mix to field performance. Superpave (Superior PERforming asphalt PAVEments) encompasses the products of the SHRP asphalt research program and consists of three interrelated elements: an asphalt binder specification with supporting tests; a mix design and analysis system with supporting tests; and performance prediction models. This report is a compilation and synthesis of Washington DOT's (WSDOT) experience with selected components and concepts of the SHRP/Superpave technology to include the following: performance graded (PG) binder usage and specification validation; gyratory mix design; the Superpave Shear Test (SST); and field performance of the Superpave mixes.Binders typically specified by WSDOT (AR400OW and PBAs -2, -5, -6. -6GR) were classified in terms of five Superpave performance grades: PG 58-22; 64-22; 64-28; 64-34; and 70-28. Although data from 171 weather stations suggest that as many as 6 low- and 5 high-temperature grades could be specified, binder availability and regional pavement distress were used to develop guidelines for statewide PG usage. Three binders were recommended for use in the western, northeastern and southeastern regions of the state as follows: PG 58-22; PG 58-34; and PG 64-28, respectively. Validation of the binder specification with respect to low temperature cracking was accomplished using binder and field performance data from 28 projects. The results were very encouraging: the original SHRP algorithm for binder selection correctly "predicted" field performance in 22 of 28 cases, whereas the LTPP algorithm for binder selection correctly "predicted" field performance in 26 of 28 cases.Additionally, a laboratory experiment using the Superpave Shear Test (SST) apparatus was undertaken to test the effectiveness of binder "bumping," i.e., increasing the high temperature grade because of exceptionally high traffic volume and/or slow or standing traffic. The data clearly indicate that the SST is an effective tool for discriminating between binders and that 'bumping" may be effective in reducing pavement rutting. Permanent shear strain for specimens made with a PB 70-xx binder was only 25 to 33% of the shear strain for specimens made with a PG 58-xx binder.As originally configured, the Superpave mix design matrix included seven traffic levels and four temperature regimes for 28 possible compaction levels. Recognizing that the 28 compaction levels made for a somewhat unwieldy system, WSDOT attempted to reduce the number of compaction levels by conducting a series of mix designs at each compaction level. The results of the limited experiment suggest that it might be possible to limit the number of compaction levels required for mix design. Research by Brown et. al. (NCHRP 99) tends to confirm this as they have suggested reducing the number of compaction levels and provided more definitive guidance with respect to each level.Since 1993 WSDOT has place 44 projects which include some component of the Superp ave technology. For 17 of these projects parallel Hveem and Superpave mix designs were conducted. In 13 of the 17 cases, the Superpave design asphalt content was equal to or greater than the Hveem design asphalt content, though the difference was usually no more than 0.2%. A fundamental difference between Hveem and Superpave mix design methods is the compaction device. Data from these field projects indicate that the current kneading and gyratory compaction protocols (at least for 109 gyrations) yield similar air void contents.As noted previously, Washington DOT has placed 44 projects which involve some component of the Superpave technology. For 18 of the projects a conventional Hveem mix design was conducted using a PG binder (Hveem-PG). The remaining 26 projects were truly Superpave, i.e., the materials selection and mix design were established in accordance with the Asphalt Institute's SP2, Superpave Level 1 Mix Design. According to WSDOT practice the following numerical indices trigger maintenance: Pavement Structural Condition (PSC) 10 mm; or International Roughness Index (IRI) > 500 cnVkm. Although relatively "young", the 44 projects are performing quite well. The average values of rutting, PSC, and IRI (4, 91, and 121, respectively) are all well below the "trigger" values. With respect to rutting and PSC, the performance of Hveem-PG and Superpave projects is virtually identical. However, the ride quality of the Superpave projects is a bit rougher than the Hveem-PG binder projects: IRI of 134 for the former and 103 for the latter. The higher values of IRI measured on the Superpave projects may be the result of the typically coarser aggregate gradation or differences in construction techniques.WSDOT's Superpave experience has not been without challenges. Still, its overall experience has been very encouraging. Experimentation with the revised compaction matrix, continued use of the SST, field validation of the "bumping" experiment, and long-term monitoring of field performance will provide the necessary data to allow WSDOTs critical assessment of Superpave's technical merit and economic viability.
Authors:
Leahy,R. B., Briggs,R. N.
Keywords:
SHRP, Superpave, asphalt, intermodal, transportation, transportation efficiency, highway, research, program, performance, concrete, structures, highway safety, safety, maintenance, pavement, specifications, specification, asphalt pavement, pavements, tests, design, analysis, prediction, models, Washington, WSDOT, data, temperature, cracking, LTPP, traffic, volume, compaction, materials, condition, international roughness index, roughness, index, ride quality, quality, aggregate, construction, ITS, monitoring
|
Trombly,J. | WA-RD 462.2 | SWIFT - Consumer Acceptance Study | 1998 |
Abstract:
The Seattle Wide-area Information for Travelers (SWIFT) Operational Test was intended to evaluate the performance of a large-scale, urban Advanced Traveler Information System (ATIS) deployment in the Seattle area. With the majority the SWIFT system completed by June 30,1996, the SWIFT Field Operational Test (FOT) evaluation was conducted from July 1, 1996 through September 20, 1997. The unique features of the SWIFT ATIS included the provision of information for multiple transportation modes, the delivery of this information using three different devices and the use of FM sideband as the primary communications medium. A total of 690 system users were recruited during the course of the study, including 520 Seiko Message watch users, 90 users of the Delco in-vehicle-navigation device and 80 users of the SWIFT portable computers.Purpose of Test. The SWIFT Consumer Acceptance Study was one of five component studies to the overall system evaluation. This report details the findings for the SWIFT Consumer Acceptance Study based on the evaluation objectives that were identified in the SWIFT Evaluation Plan (1 995). The primary objectives of the SWIFT Consumer Acceptance Study were to assess the following:Importance of traveler information in travel planningUsefulness of SWIFT traveler information in travel planningMinimum set of user services and device features required to provide viable productand servicesUser perceptions of SWIFT device usefulnessWillingness-to-pay for different services.User perceptions of changes in travel convenience and efficiencyUser perceptions of changes in traffic congestion, air quality, energy consumption,and safety.Additional SWIFT Consumer Acceptance Study objectives, conducted in support of the SWIFTArchitecture Study, were to assess the following:SWIFT system reliability from a user perspectiveSWIFT system availability from a user perspective.Methods. A variety of data-collection efforts were completed, including questionnaires, focus groups and telephone interviews. The questionnaires contained items that addressed objectives set out in the evaluation plan. The focus groups were conducted with small groups of users to obtain qualitative impressions from a smaller subset of users who were encouraged to speak openly and share their perceptions with other users. The SWIFT Consumer Acceptance Study focused on measurement and analysis of user perceptions toward SWIFT system usefulness and performance. No attempt was made to quantify the system level impacts of SWIFT services on congestion, air quality, energy consumption or safety in the Seattle region. Rather, the assessment of system-level transportation impacts was limited to examining subjective data (e.g., traveler's perceptions) collected from users and determining whether these perceptions were consistent with a benefit.Perceptions of Importance of Traveler In formationResults indicated that SWIFT users tended to place a high degree of importance on incident and congestion-related information in travel planning. Incident location and duration information was rated quite high in importance along with general traffic congestion information. For the group as a whole, information concerning bus schedule and route information and bus-location information was rated very low in importance, although these ratings were much higher in those users that actually used the bus. This was consistent with the automobile dependence reported by the group, and suggests that information concerning non-automobile options would not be used by the automobile-dependent group. Since users of the SWIFT portable computer were recruited from among transit users, this group generally rated transit information higher than other device users groups. However, the importance of this information was not as high as congestion and incident-related information. Receipt of various general-information messages was not rated very high in importance by questionnaire respondents, with the exception of weather, sports and news items. Most SWIFT respondents indicated that the receipt of financial and other environmental information was not important. Of course, from a transportation-impact point of view, the receipt of these general information messages was inconsequential. However, if device users were attracted by thesemessages it may make such services commercially viable to augment any potential benefitperceived by users through the receipt of travel-related information.Perceptions of S WIFT Traveler In formation UsefulnessUsers tended to view the messages they received from the SWIFT systems as accurate, reliable,timely, easy to understand and useful. Among device types, respondents representing users of the Seiko Message Watch expressed concern with the timeliness of incident-related messages. In addition, these respondents tended to rate ease of understanding lower than other user groups. Users of the Delco in-vehicle-navigation devices and SWIFT portable computers experienced problems in receiving personal-paging messages and these problems were reflected in respondent ratings. The map-based display provided by the SWIFT portable computer resulted in generally higher ratings for this device over other devices in understanding incident location and the nature of congestion. Seiko Message Watch users reported difficulty in understanding the extent of expected delay as well as the nature of congestion, while Delco in-vehicle-navigation device respondents reported difficulty in understanding the period of time for which a message applied. Generally speaking, SWIFT participants endorsed a wide-range of improvements to messages provided by the SWIFT system. Most seemed to consider the operational test as a suggestion of what might be possible, rather than a demonstration of a final product. Among Seiko Message Watch users, respondents expressed a desire for improved timeliness of messages as atop priority.
Authors:
Trombly,J., Wetherby,B., Dixson,A.
Keywords:
Acceptance, air quality, analysis, Assessment, ATIS, availability, bus, computer, congestion, congestion information, Consumer, data, data collection, Energy, environmental, evaluation, group, impact, impacts, improvement, incident, interviews, Miscellaneous Library, objectives, performance, planning, portable computer, quality, reliability, safety, seattle, Study, SWIFT, System, systems, traffic, traffic congestion, transit, transportation, travel, traveler information, urban
The Seattle Wide-area Information for Travelers (SWIFT) Operational Test was intended to evaluate the performance of a large-scale, urban Advanced Traveler Information System (ATIS) deployment in the Seattle area. With the majority the SWIFT system completed by June 30,1996, the SWIFT Field Operational Test (FOT) evaluation was conducted from July 1, 1996 through September 20, 1997. The unique features of the SWIFT ATIS included the provision of information for multiple transportation modes, the delivery of this information using three different devices and the use of FM sideband as the primary communications medium. A total of 690 system users were recruited during the course of the study, including 520 Seiko Message watch users, 90 users of the Delco in-vehicle-navigation device and 80 users of the SWIFT portable computers.Purpose of Test. The SWIFT Consumer Acceptance Study was one of five component studies to the overall system evaluation. This report details the findings for the SWIFT Consumer Acceptance Study based on the evaluation objectives that were identified in the SWIFT Evaluation Plan (1 995). The primary objectives of the SWIFT Consumer Acceptance Study were to assess the following:Importance of traveler information in travel planningUsefulness of SWIFT traveler information in travel planningMinimum set of user services and device features required to provide viable productand servicesUser perceptions of SWIFT device usefulnessWillingness-to-pay for different services.User perceptions of changes in travel convenience and efficiencyUser perceptions of changes in traffic congestion, air quality, energy consumption,and safety.Additional SWIFT Consumer Acceptance Study objectives, conducted in support of the SWIFTArchitecture Study, were to assess the following:SWIFT system reliability from a user perspectiveSWIFT system availability from a user perspective.Methods. A variety of data-collection efforts were completed, including questionnaires, focus groups and telephone interviews. The questionnaires contained items that addressed objectives set out in the evaluation plan. The focus groups were conducted with small groups of users to obtain qualitative impressions from a smaller subset of users who were encouraged to speak openly and share their perceptions with other users. The SWIFT Consumer Acceptance Study focused on measurement and analysis of user perceptions toward SWIFT system usefulness and performance. No attempt was made to quantify the system level impacts of SWIFT services on congestion, air quality, energy consumption or safety in the Seattle region. Rather, the assessment of system-level transportation impacts was limited to examining subjective data (e.g., traveler's perceptions) collected from users and determining whether these perceptions were consistent with a benefit.Perceptions of Importance of Traveler In formationResults indicated that SWIFT users tended to place a high degree of importance on incident and congestion-related information in travel planning. Incident location and duration information was rated quite high in importance along with general traffic congestion information. For the group as a whole, information concerning bus schedule and route information and bus-location information was rated very low in importance, although these ratings were much higher in those users that actually used the bus. This was consistent with the automobile dependence reported by the group, and suggests that information concerning non-automobile options would not be used by the automobile-dependent group. Since users of the SWIFT portable computer were recruited from among transit users, this group generally rated transit information higher than other device users groups. However, the importance of this information was not as high as congestion and incident-related information. Receipt of various general-information messages was not rated very high in importance by questionnaire respondents, with the exception of weather, sports and news items. Most SWIFT respondents indicated that the receipt of financial and other environmental information was not important. Of course, from a transportation-impact point of view, the receipt of these general information messages was inconsequential. However, if device users were attracted by thesemessages it may make such services commercially viable to augment any potential benefitperceived by users through the receipt of travel-related information.Perceptions of S WIFT Traveler In formation UsefulnessUsers tended to view the messages they received from the SWIFT systems as accurate, reliable,timely, easy to understand and useful. Among device types, respondents representing users of the Seiko Message Watch expressed concern with the timeliness of incident-related messages. In addition, these respondents tended to rate ease of understanding lower than other user groups. Users of the Delco in-vehicle-navigation devices and SWIFT portable computers experienced problems in receiving personal-paging messages and these problems were reflected in respondent ratings. The map-based display provided by the SWIFT portable computer resulted in generally higher ratings for this device over other devices in understanding incident location and the nature of congestion. Seiko Message Watch users reported difficulty in understanding the extent of expected delay as well as the nature of congestion, while Delco in-vehicle-navigation device respondents reported difficulty in understanding the period of time for which a message applied. Generally speaking, SWIFT participants endorsed a wide-range of improvements to messages provided by the SWIFT system. Most seemed to consider the operational test as a suggestion of what might be possible, rather than a demonstration of a final product. Among Seiko Message Watch users, respondents expressed a desire for improved timeliness of messages as atop priority.
Authors:
Trombly,J., Wetherby,B., Dixson,A.
Keywords:
Acceptance, air quality, analysis, Assessment, ATIS, availability, bus, computer, congestion, congestion information, Consumer, data, data collection, Energy, environmental, evaluation, group, impact, impacts, improvement, incident, interviews, Miscellaneous Library, objectives, performance, planning, portable computer, quality, reliability, safety, seattle, Study, SWIFT, System, systems, traffic, traffic congestion, transit, transportation, travel, traveler information, urban
|
Jensen,M. | WA-RD 462.3 | SWIFT - Deployment Cost Study | 1998 |
Abstract:
The Seattle Wide-area Information For Travelers (SWIFT) project was a highly successful Intelligent Transportation System (ITS) Field Operational Test (FOT) that was conducted over a four-year period from 1993 to 1997. The purpose of the project was to test the efficacy of a High Speed Data System (HSDS), or FM Sub-carrier, to disseminate incident, bus and speedlcongestion information via three different end-user devices: pager watch, portable computer and in-vehicle navigation device. Six hundred ninety (690) commuters, many with route- or mode-choice options, participated in the FOT and provided user-acceptance evaluations. Other evaluation components examined the system architecture, communications coverage, institutional issues, and consumer acceptance. The primary purpose of the SWIFT Deployment Cost Study was to provide an independent Life Cycle Cost Estimate (LCCE) of an operational and fully deployed SWIFT system. Moreover, it is intended to provide both the SWIFT participants and the FHWA with a measure of the commercial viability of \"SWIFT-like\" systems nationwide. Table ES- 1 shows the organizations that were included in the SWIFT Deployment Cost Study LCCE and commercial viability analysis.Table ES-1. Deployed SWIFT Participants (CostIRevenue Participants).Industry Government/InstitutionaISeiko Communications Systems, Inc. (SCS) King CountyMetro Networks University of WashingtonEtak, Inc.IBM (FOT Development Only)Delco Electronics (FOT Development Only)The methodology for the SWlFT Deployment Cost Study LCCE relied on standard proven costestimation and data collection and analysis techniques to provide cost estimates for each SWIFTparticipant shown above across the following three life-cycle phases:1) FOT development (costs of current SWIFT Test)King County Metro TransitUniversity of Washington (UW)2) Commercial Development (additional development and procurement costs for fullydeploying an operational SWIFT system (follows the completion of the SWIFT test)3) Annual Commercial Operations (annual operations costs for a fully deployed SWIFTsystem)A summary of the resulting life cycle cost estimate (LCCE) for the deployed SWIFT system ispresented in Table ES-2. Here, the FOT Development phase (based on SWIFT test actuals) wasestimated to cost $6.4 Million, the Commercial Development phase was estimated to cost $1.5Million, and the Annual Commercial Operations costs were estimated to be $0.8 Million.-- -SWIFT Deployment Cost Study I
Authors:
Jensen,M.
Keywords:
Acceptance, analysis, Annual, bus, computer, Consumer, cost, costs, counties, data, data collection, Deployment, development, evaluation, incident, Institutional, Intelligent transportation system, Issues, ITS, methodology, Miscellaneous Library, mode choice, networks, portable computer, project, seattle, speed, Study, SWIFT, System, systems, transportation, Washington
The Seattle Wide-area Information For Travelers (SWIFT) project was a highly successful Intelligent Transportation System (ITS) Field Operational Test (FOT) that was conducted over a four-year period from 1993 to 1997. The purpose of the project was to test the efficacy of a High Speed Data System (HSDS), or FM Sub-carrier, to disseminate incident, bus and speedlcongestion information via three different end-user devices: pager watch, portable computer and in-vehicle navigation device. Six hundred ninety (690) commuters, many with route- or mode-choice options, participated in the FOT and provided user-acceptance evaluations. Other evaluation components examined the system architecture, communications coverage, institutional issues, and consumer acceptance. The primary purpose of the SWIFT Deployment Cost Study was to provide an independent Life Cycle Cost Estimate (LCCE) of an operational and fully deployed SWIFT system. Moreover, it is intended to provide both the SWIFT participants and the FHWA with a measure of the commercial viability of \"SWIFT-like\" systems nationwide. Table ES- 1 shows the organizations that were included in the SWIFT Deployment Cost Study LCCE and commercial viability analysis.Table ES-1. Deployed SWIFT Participants (CostIRevenue Participants).Industry Government/InstitutionaISeiko Communications Systems, Inc. (SCS) King CountyMetro Networks University of WashingtonEtak, Inc.IBM (FOT Development Only)Delco Electronics (FOT Development Only)The methodology for the SWlFT Deployment Cost Study LCCE relied on standard proven costestimation and data collection and analysis techniques to provide cost estimates for each SWIFTparticipant shown above across the following three life-cycle phases:1) FOT development (costs of current SWIFT Test)King County Metro TransitUniversity of Washington (UW)2) Commercial Development (additional development and procurement costs for fullydeploying an operational SWIFT system (follows the completion of the SWIFT test)3) Annual Commercial Operations (annual operations costs for a fully deployed SWIFTsystem)A summary of the resulting life cycle cost estimate (LCCE) for the deployed SWIFT system ispresented in Table ES-2. Here, the FOT Development phase (based on SWIFT test actuals) wasestimated to cost $6.4 Million, the Commercial Development phase was estimated to cost $1.5Million, and the Annual Commercial Operations costs were estimated to be $0.8 Million.-- -SWIFT Deployment Cost Study I
Authors:
Jensen,M.
Keywords:
Acceptance, analysis, Annual, bus, computer, Consumer, cost, costs, counties, data, data collection, Deployment, development, evaluation, incident, Institutional, Intelligent transportation system, Issues, ITS, methodology, Miscellaneous Library, mode choice, networks, portable computer, project, seattle, speed, Study, SWIFT, System, systems, transportation, Washington
|
Davids, W.G. | WA-RD 455.1 | Modeling of Rigid pavements: Joint Shear Transfer Mechanisms and Finite Element Solution Strategies | 1998 | TRAC/UW |
Abstract:
This report documents the moldeling strategy and associated verification which permits analysis of multiple PCC plain jointed slabs. Several subbase/soil layers below the slabs and separation of the slab and base layer are considered. Load effects include those associated with both multiple tire and linear temperature gradients. A technique for modeling aggregate interlock shear transfer across PCC pavement joints is developed and verified. The overall development is contained in the computer program EverFE. The computer program uses a graphical user interface which aids its use.
Authors:
Davids, W.G., Turkiyyah, G.M., Mahoney, J.P.
Keywords:
Aggregate, aggregate interlock, analysis, base, computer, computer program, developed, development, EverFE, finite element, Finite elements, ITS, Joints, joints load transfer, modeling, pavement, pavements, PCC, permits, program, rigid pavement, temperature, tire
This report documents the moldeling strategy and associated verification which permits analysis of multiple PCC plain jointed slabs. Several subbase/soil layers below the slabs and separation of the slab and base layer are considered. Load effects include those associated with both multiple tire and linear temperature gradients. A technique for modeling aggregate interlock shear transfer across PCC pavement joints is developed and verified. The overall development is contained in the computer program EverFE. The computer program uses a graphical user interface which aids its use.
Authors:
Davids, W.G., Turkiyyah, G.M., Mahoney, J.P.
Keywords:
Aggregate, aggregate interlock, analysis, base, computer, computer program, developed, development, EverFE, finite element, Finite elements, ITS, Joints, joints load transfer, modeling, pavement, pavements, PCC, permits, program, rigid pavement, temperature, tire
|
Cofer,W. F. | WA-RD 427.1 | Analytical Evaluation of Retrofit Strategies for Multi-Column Bridges | 1997 | TRAC/WSU |
Abstract:
Many retrofit measures have been proposed and then implemented into existing highway bridges. The goal of seismic strengthening is not intended to retrofit a bridge to be "earthquake-proof", but to minimize the likelihood of a structural collapse. An amount of acceptable damage may occur during a design level earthquake. The combination of retrofit measures and the acceptable damage greatly complicates the structural properties for a bridge. It is necesary to use analytical and experimental means to verify the effectiveness of various retrofit combinations.The objectives of this research are: (1) to investigate analytically the feasibility and advantages of applying the retrofit measures developed for single-column bent bridges to multi-column bend bridges; (2) to evaluate analytically the effects and benefits of current column retrofit strategies for multi-column bridges and propose the most effective measures for strengthening bridges; (3) to evaluate the performance of earthquake restrainers and find the change of seismic load and displacements cause by their installation.To achieve the objectives, an existing nonlinear dynamic bridge analysis program with elastic-perfectly plastic column behavior and a conventional hysteresis model was modified in order to include softening behavior and a more realistic hysteresis rule for cyclic loading.Both two- and three-dimensional structural models for two actual bridges from Washington were analyzed by inputting a typical seismic record. The two-dimensional models were used to evaluate column retrofitting measures, and the three-dimensional model was used to evaluate the performance of longitudinal earthquake restrainers. Both artial and full column retrofit stratgies were shown to result in decreased maximum earthquake response and decreased plastic deformation of columns for the bridge bent compared to the case without retrofitting. Therefore, it was concluded that the partial column retrofit strategies were feasible after a ductility capacity of the bridge is exactly defined. The opening displacements at expansion joint hinges were decreased due to the installation of longitudinal restrainers. Additionally, the redistribution of earthquake forces caused by their installation was not significant. Many retrofit measures have been proposed and then implemented into existing highway bridges. The goal of seismic strengthening is not intended to retrofit a bridge to be "earthquake-proof", but to minimize the likelihood of a structural collapse. An amount of acceptable damage may occur during a design level earthquake. The combination of retrofit measures and the acceptable damage greatly complicates the structural properties for a bridge. It is necessary to use analytical and experimental means to verify the effectiveness of various retrofit combinations.
Authors:
Cofer,W. F., McLean,D. I., Zhang,Y.
Keywords:
bridge, earthquake, retrofit, analysis, columns
Many retrofit measures have been proposed and then implemented into existing highway bridges. The goal of seismic strengthening is not intended to retrofit a bridge to be "earthquake-proof", but to minimize the likelihood of a structural collapse. An amount of acceptable damage may occur during a design level earthquake. The combination of retrofit measures and the acceptable damage greatly complicates the structural properties for a bridge. It is necesary to use analytical and experimental means to verify the effectiveness of various retrofit combinations.The objectives of this research are: (1) to investigate analytically the feasibility and advantages of applying the retrofit measures developed for single-column bent bridges to multi-column bend bridges; (2) to evaluate analytically the effects and benefits of current column retrofit strategies for multi-column bridges and propose the most effective measures for strengthening bridges; (3) to evaluate the performance of earthquake restrainers and find the change of seismic load and displacements cause by their installation.To achieve the objectives, an existing nonlinear dynamic bridge analysis program with elastic-perfectly plastic column behavior and a conventional hysteresis model was modified in order to include softening behavior and a more realistic hysteresis rule for cyclic loading.Both two- and three-dimensional structural models for two actual bridges from Washington were analyzed by inputting a typical seismic record. The two-dimensional models were used to evaluate column retrofitting measures, and the three-dimensional model was used to evaluate the performance of longitudinal earthquake restrainers. Both artial and full column retrofit stratgies were shown to result in decreased maximum earthquake response and decreased plastic deformation of columns for the bridge bent compared to the case without retrofitting. Therefore, it was concluded that the partial column retrofit strategies were feasible after a ductility capacity of the bridge is exactly defined. The opening displacements at expansion joint hinges were decreased due to the installation of longitudinal restrainers. Additionally, the redistribution of earthquake forces caused by their installation was not significant. Many retrofit measures have been proposed and then implemented into existing highway bridges. The goal of seismic strengthening is not intended to retrofit a bridge to be "earthquake-proof", but to minimize the likelihood of a structural collapse. An amount of acceptable damage may occur during a design level earthquake. The combination of retrofit measures and the acceptable damage greatly complicates the structural properties for a bridge. It is necessary to use analytical and experimental means to verify the effectiveness of various retrofit combinations.
Authors:
Cofer,W. F., McLean,D. I., Zhang,Y.
Keywords:
bridge, earthquake, retrofit, analysis, columns
|
Trowbridge,A. | WA-RD 415.1 | The Potential for Freight Productivity Improvements Along Urban Corridors | 1996 | TRAC/UW |
Abstract:
The impacts that would result from providing "reserved capacity" for trucks rather than restricting trucks are considered in this study. In the extreme case, trucks would be allowed to travel in a dedicated or exclusive lane. A more moderate approach would be to provide a cooperative dedicated lane in which vehicles such as trucks and buses could share a common lane and yet be separated from general traffic.The study determined the following. Reserved-capacity strategies for trucks would offer (1) nearly $10 million in annual travel time savings for the trucking industry, (2) a savings of about 2.5 minutes per average truck trip (less than 8 percent savings in trip travel time), and (3) almost $30 million in annual travel time savings for single-occupancy vehicles in the Seattle region. The difference in travel times between the reserved-capacity strategy that would add trucks to the existing HOV lanes and the one that would add an exclusive truck lane would be insignificant, providing little justification for the construction of an exclusive truck lane. In all likelihood, the impact of reserved-capacity strategies on safety would be small, depending on the particular reserved capacity strategy. Reserved capacity strategies for trucks would accelerate pavement deterioration in the reserved lanes, but the reduction in the pavement deterioration rates of the general purpose lanes might help to balance future reconstruction costs. Surveys of the general public and subsequent statistical analysis showed considerable resistance to reserved-capacity strategies for trucks. However, this resistance is not unlike that encountered when HOV lanes were first considered.It is the recommendation of this study that the idea of reserved-capacity strategies for trucks continue to be presented to the trucking industry, to the public, and to other impacted agencies for discussion and consideration. The study showed that the adverse impacts of such strategies are easily manageable and there is at least potential for freight-productivity improvements.
Authors:
Trowbridge,A., Nam,D., Mannering,F. L., Carson,J.
Keywords:
agencies, analysis, Annual, buses, construction, corridors, cost, costs, deterioration, exclusive truck lanes, freight, freight mobility, HOV, HOV lanes, impact, impacts, improvement, lanes, pavement, public, reconstruction, research, resistance, safety, seattle, statistical analysis, survey, Surveys, travel, travel time, travel times, truck, trucking, trucks, urban
The impacts that would result from providing "reserved capacity" for trucks rather than restricting trucks are considered in this study. In the extreme case, trucks would be allowed to travel in a dedicated or exclusive lane. A more moderate approach would be to provide a cooperative dedicated lane in which vehicles such as trucks and buses could share a common lane and yet be separated from general traffic.The study determined the following. Reserved-capacity strategies for trucks would offer (1) nearly $10 million in annual travel time savings for the trucking industry, (2) a savings of about 2.5 minutes per average truck trip (less than 8 percent savings in trip travel time), and (3) almost $30 million in annual travel time savings for single-occupancy vehicles in the Seattle region. The difference in travel times between the reserved-capacity strategy that would add trucks to the existing HOV lanes and the one that would add an exclusive truck lane would be insignificant, providing little justification for the construction of an exclusive truck lane. In all likelihood, the impact of reserved-capacity strategies on safety would be small, depending on the particular reserved capacity strategy. Reserved capacity strategies for trucks would accelerate pavement deterioration in the reserved lanes, but the reduction in the pavement deterioration rates of the general purpose lanes might help to balance future reconstruction costs. Surveys of the general public and subsequent statistical analysis showed considerable resistance to reserved-capacity strategies for trucks. However, this resistance is not unlike that encountered when HOV lanes were first considered.It is the recommendation of this study that the idea of reserved-capacity strategies for trucks continue to be presented to the trucking industry, to the public, and to other impacted agencies for discussion and consideration. The study showed that the adverse impacts of such strategies are easily manageable and there is at least potential for freight-productivity improvements.
Authors:
Trowbridge,A., Nam,D., Mannering,F. L., Carson,J.
Keywords:
agencies, analysis, Annual, buses, construction, corridors, cost, costs, deterioration, exclusive truck lanes, freight, freight mobility, HOV, HOV lanes, impact, impacts, improvement, lanes, pavement, public, reconstruction, research, resistance, safety, seattle, statistical analysis, survey, Surveys, travel, travel time, travel times, truck, trucking, trucks, urban
|
Cofer,W. F. | WA-RD 328.1 | Analytical Modeling of Foundations for Seismic Analysis of Bridges | 1994 |
Abstract:
The response of bridges when subjected to seismic excitation may be significantly influenced by the dynamic properties of their foundations. With current design practice, foundation elements are typically considered as elastic springs without consideration of material and radiation damping. The objectives of this research were to identify general foundation models that are suitable for modeling soil-structure interaction in seismic bridge analysis, to modify an existing nonlinear seismic bridge analysis computer program to include a new element capable of representing such models, and to conduct a parametric study to assess the effect of the nacres energy dissipation mechanisms on the response of bridge substructures. For spread footing foundations, three different models were identified and applied to a typical two-column bridge bent. The seismic response for each model was compared with conventional elastic and fixed-base models. Several soil stiffness values and earthquake records were considered for analysis. Maximum values of displacement, plastic hinge rotation, and cumulative plastic hinge rotations were noted and compared. It was concluded that the use of the foundation models can produce an important change in the bridge response when compared to that of the fixed-based models, depending on the frequency and content of the earthquake and the stiffness of the soil. The effects of radiation damping were observed to be insignificant for foundations on stiff soil, but important for those on soft soil. In addition, the performance of the simpler damped foundation models was found to be quite similar to that of more complex models.
Authors:
Cofer,W. F., McLean,D. I., McGuire,J. W.
Keywords:
structures, seismic, bridge, earthquake, soil-structure interaction, foundation, analysis, modeling
The response of bridges when subjected to seismic excitation may be significantly influenced by the dynamic properties of their foundations. With current design practice, foundation elements are typically considered as elastic springs without consideration of material and radiation damping. The objectives of this research were to identify general foundation models that are suitable for modeling soil-structure interaction in seismic bridge analysis, to modify an existing nonlinear seismic bridge analysis computer program to include a new element capable of representing such models, and to conduct a parametric study to assess the effect of the nacres energy dissipation mechanisms on the response of bridge substructures. For spread footing foundations, three different models were identified and applied to a typical two-column bridge bent. The seismic response for each model was compared with conventional elastic and fixed-base models. Several soil stiffness values and earthquake records were considered for analysis. Maximum values of displacement, plastic hinge rotation, and cumulative plastic hinge rotations were noted and compared. It was concluded that the use of the foundation models can produce an important change in the bridge response when compared to that of the fixed-based models, depending on the frequency and content of the earthquake and the stiffness of the soil. The effects of radiation damping were observed to be insignificant for foundations on stiff soil, but important for those on soft soil. In addition, the performance of the simpler damped foundation models was found to be quite similar to that of more complex models.
Authors:
Cofer,W. F., McLean,D. I., McGuire,J. W.
Keywords:
structures, seismic, bridge, earthquake, soil-structure interaction, foundation, analysis, modeling
|
Cofer,W. F. | WA-RD 328.2/NTIS No. PB940181799 | Analytical Modeling of Foundations for Seismic Analysis of Bridges | 1994 | TRAC/WSU |
Abstract:
The response of bridges when subjected to seismic excitation may be significantly influenced by the dynamic properties of their foundations. With current design practice, foundation elements are typically considered as elastic springs without consideration of material and radiation damping. The objectives of this research were to identify general foundation models that are suitable for modeling soil-structure interaction in seismic bridge analysis, to modify an existing nonlinear seismic bridge analysis computer program to include a new element capable of representing such models, and to conduct a parametric study to assess the effect of the increased energy dissipation mechanisms on the response of bridge substructures. For spread footing foundations, three different models were identified and applied to a typical two-column bridge bent. The seismic response for each model was compared with conventional elastic and fixed-base models. Several soil stiffness values and earthquake records were considered for analysis. Maximum values of displacement, plastic hinge rotation, and cumulative plastic hinge rotations were noted and compared. It was concluded that the use of the foundation models can produce an important change in the bridge response when compared to that of the fixed -based models, depending on the frequency and content of the earthquake and the stiffness of the soil. The effects of radiation damping were observed to be insignificant for foundations on stiff soil, but important for those on soft soil. In addition, the performance of the simpler damped foundation models was found to be quite similar to that of more complex models.
Authors:
Cofer,W. F., McLean,D. I., McGuire,J. W.
Keywords:
bridge, earthquake, soil-structure interaction, foundation, analysis, modeling
The response of bridges when subjected to seismic excitation may be significantly influenced by the dynamic properties of their foundations. With current design practice, foundation elements are typically considered as elastic springs without consideration of material and radiation damping. The objectives of this research were to identify general foundation models that are suitable for modeling soil-structure interaction in seismic bridge analysis, to modify an existing nonlinear seismic bridge analysis computer program to include a new element capable of representing such models, and to conduct a parametric study to assess the effect of the increased energy dissipation mechanisms on the response of bridge substructures. For spread footing foundations, three different models were identified and applied to a typical two-column bridge bent. The seismic response for each model was compared with conventional elastic and fixed-base models. Several soil stiffness values and earthquake records were considered for analysis. Maximum values of displacement, plastic hinge rotation, and cumulative plastic hinge rotations were noted and compared. It was concluded that the use of the foundation models can produce an important change in the bridge response when compared to that of the fixed -based models, depending on the frequency and content of the earthquake and the stiffness of the soil. The effects of radiation damping were observed to be insignificant for foundations on stiff soil, but important for those on soft soil. In addition, the performance of the simpler damped foundation models was found to be quite similar to that of more complex models.
Authors:
Cofer,W. F., McLean,D. I., McGuire,J. W.
Keywords:
bridge, earthquake, soil-structure interaction, foundation, analysis, modeling
|
De Bolt,P. G. | WA-RD 341.1 | Heavy Vehicles vs. Urban Pavements | 1993 |
Abstract:
An analysis was conducted of the impact that overweight vehicles have and will have on the life of the pavements in the Seattle metropolitan area. The study focuses on major Metro bus routes with both rigid and flexible pavements.Recommendations arc made to mitigate the impact of the higher loads from the bus fleet. These recommendations include route modifications to avoid streets with thinner, under designed pavements, increasing pavement thickness for rebuild or overlaid streets, and the purchase of vehicles, which meet legal axle loads.
Authors:
De Bolt,P. G., Chinn,E.
Keywords:
analysis, axle, bus, buses, heavy vehicles, impact, loads, overweight, pavement, pavement design, pavement service life, pavements, seattle, urban
An analysis was conducted of the impact that overweight vehicles have and will have on the life of the pavements in the Seattle metropolitan area. The study focuses on major Metro bus routes with both rigid and flexible pavements.Recommendations arc made to mitigate the impact of the higher loads from the bus fleet. These recommendations include route modifications to avoid streets with thinner, under designed pavements, increasing pavement thickness for rebuild or overlaid streets, and the purchase of vehicles, which meet legal axle loads.
Authors:
De Bolt,P. G., Chinn,E.
Keywords:
analysis, axle, bus, buses, heavy vehicles, impact, loads, overweight, pavement, pavement design, pavement service life, pavements, seattle, urban
|
Dames & Moore- Inca Engineering | WA-RD 324.1 | Foundation-Soil Interaction Analysis of Bridges - Volumes I and II 478 | 1993 |
Abstract:
Dames & Moore And their subcontractor, Inco Engineers, have prepared this Manual of Practice for conducting bridge foundation-soil interaction analyses. The manual is intended to assist engineers in the Bridge Design office at the Washington State Department of Transportation (WSDOT) who perform dynamic analysis of bridge-foundation systems. The primary purpose of the manual is to present practical and accurate methods of estimating the foundation stiffness matrices for abutment or pier foundations supported on footings or piles. These matrices are needed for soil-structure interaction analysis to more accurately determine the seismic loads acting on the bridge superstructure and on the abutment and pier foundations.This Manual of Practice consists of two volumes. Volume I presents five bridge example problems:1. Coldwater Creek2. Deadwater Slough3. Ebey Slough4. Northup Way5. FHWAThe first four examples are actual WSDOT bridges and the fifth example is a fictitious bridge that appeared in a 1991 FHWA course notebook on seismic design of highway bridges.Volume II presents the input and output files of the SEISAB computer program for the dynamic soil-structure interaction analysis of bridges. The SEISAB computer program is currently used by WSDOT in the seismic design of Washington state bridges.Dames & Moore recommends the FHWA and Novak methods to estimate bridge foundation stiffness matrices. These methodologies are presented in detail in the Coldwater Creek example problem in Volume I. In this example, the basic theory and relevant equations or inputs for implementing these methodologies are provided first and are immediately followed by their application to the Coldwater Creek bridge. The appropriate equations or inputs from the FHWA and Novak methodologies presented not the Coldwater Creek example problem are identified and applied in the other four bridge example problems. Volume I also contains three appendices. The basis for the recommendation of the FHWA and Novak methods is provided in Appendix A, which is a reproduction of the 1992 Dames & Moore report to WSDOT on the evaluation of methods to estimate foundation stiffnesses. Appendix B consists of selected pages from the BMCOL 76 computer program user guide; this computer program, which computes the load-deflection and moment-rotation curves for single piles, is part of the FHWA methodology. Appendix C presents the method for transforming the foundation stiffness matrices from one coordinate system to another. This transformation process is important because the coordinate systems assumed in the FHWA and Novak methods are generally different and therefore are not necessarily the same as the SEISAB coordinate system. Coordinate transformations are also discussed in the ColdWater Creek example problem.
Authors:
Dames & Moore- Inca Engineering
Keywords:
analysis, bridge, bridge design, bridge foundation, bridges, computer, computer program, design, equations, evaluation, Foudation-Soil, foundation, foundation stiffness, highway, interaction, loads, manual, methodology, methods, piles, program, seismic, seismic design, soil-structure interaction, superstructure, System, systems, transportation, volume, Volumes I & II, Washington, Washington state, WSDOT
Dames & Moore And their subcontractor, Inco Engineers, have prepared this Manual of Practice for conducting bridge foundation-soil interaction analyses. The manual is intended to assist engineers in the Bridge Design office at the Washington State Department of Transportation (WSDOT) who perform dynamic analysis of bridge-foundation systems. The primary purpose of the manual is to present practical and accurate methods of estimating the foundation stiffness matrices for abutment or pier foundations supported on footings or piles. These matrices are needed for soil-structure interaction analysis to more accurately determine the seismic loads acting on the bridge superstructure and on the abutment and pier foundations.This Manual of Practice consists of two volumes. Volume I presents five bridge example problems:1. Coldwater Creek2. Deadwater Slough3. Ebey Slough4. Northup Way5. FHWAThe first four examples are actual WSDOT bridges and the fifth example is a fictitious bridge that appeared in a 1991 FHWA course notebook on seismic design of highway bridges.Volume II presents the input and output files of the SEISAB computer program for the dynamic soil-structure interaction analysis of bridges. The SEISAB computer program is currently used by WSDOT in the seismic design of Washington state bridges.Dames & Moore recommends the FHWA and Novak methods to estimate bridge foundation stiffness matrices. These methodologies are presented in detail in the Coldwater Creek example problem in Volume I. In this example, the basic theory and relevant equations or inputs for implementing these methodologies are provided first and are immediately followed by their application to the Coldwater Creek bridge. The appropriate equations or inputs from the FHWA and Novak methodologies presented not the Coldwater Creek example problem are identified and applied in the other four bridge example problems. Volume I also contains three appendices. The basis for the recommendation of the FHWA and Novak methods is provided in Appendix A, which is a reproduction of the 1992 Dames & Moore report to WSDOT on the evaluation of methods to estimate foundation stiffnesses. Appendix B consists of selected pages from the BMCOL 76 computer program user guide; this computer program, which computes the load-deflection and moment-rotation curves for single piles, is part of the FHWA methodology. Appendix C presents the method for transforming the foundation stiffness matrices from one coordinate system to another. This transformation process is important because the coordinate systems assumed in the FHWA and Novak methods are generally different and therefore are not necessarily the same as the SEISAB coordinate system. Coordinate transformations are also discussed in the ColdWater Creek example problem.
Authors:
Dames & Moore- Inca Engineering
Keywords:
analysis, bridge, bridge design, bridge foundation, bridges, computer, computer program, design, equations, evaluation, Foudation-Soil, foundation, foundation stiffness, highway, interaction, loads, manual, methodology, methods, piles, program, seismic, seismic design, soil-structure interaction, superstructure, System, systems, transportation, volume, Volumes I & II, Washington, Washington state, WSDOT
|
Kilian,A. P. | WA-RD 239.1 | Long-Term Performance Evaluation of Wood Fibre Fills | 1992 |
Abstract:
This paper presents the results of a research project to determine the long-term performance of wood fibre embankments, that were constructed by the Washington State Department of Transportation (WSDOT) beginning in 1972. At the time of their construction, concern existed that wood fibre fills would only provide a 15 to 20 year service life.Performance of existing wood fibre fills was evaluated based on thequality of the wood fibre material, quality of the effluent, and condition ofthe pavement. A visual classification system rating the wood fibre from freshto completely decomposed was developed and used in order to establish acriteria from which all wood fibre mater.ia1 could be -rated.. Visual examinationin conjunction with laboratory tests were used as determining aspects for theeffluent quality. The WSDOT Pavement Management System was used to evaluate relative pavement performance. Site descriptions are presented giving specificcharacteristics and properties of the fills inventoried, An analysis of t h i sinformation was done to determine the effectiveness of the fills.Over half the wood fibre samples were found to be nearly fresh or freshand none w e found to be completely decomposed. In all but one case, thepavement quality over the wood fibre fills surpassed the comparative highwaysegment rating indicating the wood fill\'s performance exceeded thatof the surrounding area. Generally, the surface water in the vicinity of thewood fibre was found to be clean and pure indicating no adverse impact ofeffluent. Given the above findings, embankments constructed of wood fibre werefound to perform well over ahnost a 20. year period. Service life in excess of50 years can be expected - of wood fibre fills.
Authors:
Kilian,A. P., Ferry,C. D.
Keywords:
analysis, condition, construction, developed, effectiveness, Embankments, evaluation, impact, Leachate, management, management system, pavement, pavement management, pavement performance, pavements, performance, performance evaluation, project, quality, research, tests, transportation, Washington, Washington state, Wood fibre, WSDOT
This paper presents the results of a research project to determine the long-term performance of wood fibre embankments, that were constructed by the Washington State Department of Transportation (WSDOT) beginning in 1972. At the time of their construction, concern existed that wood fibre fills would only provide a 15 to 20 year service life.Performance of existing wood fibre fills was evaluated based on thequality of the wood fibre material, quality of the effluent, and condition ofthe pavement. A visual classification system rating the wood fibre from freshto completely decomposed was developed and used in order to establish acriteria from which all wood fibre mater.ia1 could be -rated.. Visual examinationin conjunction with laboratory tests were used as determining aspects for theeffluent quality. The WSDOT Pavement Management System was used to evaluate relative pavement performance. Site descriptions are presented giving specificcharacteristics and properties of the fills inventoried, An analysis of t h i sinformation was done to determine the effectiveness of the fills.Over half the wood fibre samples were found to be nearly fresh or freshand none w e found to be completely decomposed. In all but one case, thepavement quality over the wood fibre fills surpassed the comparative highwaysegment rating indicating the wood fill\'s performance exceeded thatof the surrounding area. Generally, the surface water in the vicinity of thewood fibre was found to be clean and pure indicating no adverse impact ofeffluent. Given the above findings, embankments constructed of wood fibre werefound to perform well over ahnost a 20. year period. Service life in excess of50 years can be expected - of wood fibre fills.
Authors:
Kilian,A. P., Ferry,C. D.
Keywords:
analysis, condition, construction, developed, effectiveness, Embankments, evaluation, impact, Leachate, management, management system, pavement, pavement management, pavement performance, pavements, performance, performance evaluation, project, quality, research, tests, transportation, Washington, Washington state, Wood fibre, WSDOT
|
Fragaszy,R. J. | WA-RD 163.1 | Estimating Pile Capacity | 1988 |
Abstract:
A comparative study of ten pile driving formulas is described. The formulas are the Danish, ENR, Eytelwein, Gates, Hiley, Janbu, Navy-McKay, PCUBC, and Weisbach. The ultimate load for each of sixty-three load tests was determined using the Q-D over 30 method to determine ultimate capacity.The predicted pile capacity was by the measured capacity to obtain normalized values. analysis for coefficient of variation were performed on the logarithm of the normal capacities to determine which formula provided the most consistent prediction of pile capacity. The Gates formula proved to be the best and the widely used one of the worst with a coefficient of variation approximately 2-3 times higher than that for the Gates formula.
Authors:
Fragaszy,R. J., Higgins,J. D., Argo,J. D.
Keywords:
analysis, factor of safety, pile capacity, pile driving formulas, pile formulas, pile-driving, piles, prediction, tests, ultimate capacity
A comparative study of ten pile driving formulas is described. The formulas are the Danish, ENR, Eytelwein, Gates, Hiley, Janbu, Navy-McKay, PCUBC, and Weisbach. The ultimate load for each of sixty-three load tests was determined using the Q-D over 30 method to determine ultimate capacity.The predicted pile capacity was by the measured capacity to obtain normalized values. analysis for coefficient of variation were performed on the logarithm of the normal capacities to determine which formula provided the most consistent prediction of pile capacity. The Gates formula proved to be the best and the widely used one of the worst with a coefficient of variation approximately 2-3 times higher than that for the Gates formula.
Authors:
Fragaszy,R. J., Higgins,J. D., Argo,J. D.
Keywords:
analysis, factor of safety, pile capacity, pile driving formulas, pile formulas, pile-driving, piles, prediction, tests, ultimate capacity
|
Nihan,N. L. | WA-RD 109.1 | TeleCommunications Link Implementation | 1987 |
Abstract:
The Telecom Link established between the University of Washington and the WSDOT Traffic Systems Management Center (TSMC) was updated during this project in order to handle the shift made by the TSMC from a 1700 loop surveillance system to a 2200 loop system. Special computer programs were also written to provide specialized summary statistics for key stations. The new software allowed statistics for key stations to be collected and summarized during data transfer. The entire transfer retrieval system was streamlined during the Telecom project to reduce costs. Finally, freeway incident analysis was performed with a data set to demonstrate the use of the new system for TSM research.
Authors:
Nihan,N. L.
Keywords:
analysis, computer, computer program, cost, costs, data, data management, data transfer, freeway, freeway surveillance and control, incident, management, program, ramp metering, research, software, statistics, surveillance, systems, telecommunications, telecommunications link, traffic, traffic systems management, transportation systems management, TSM, Washington, WSDOT
The Telecom Link established between the University of Washington and the WSDOT Traffic Systems Management Center (TSMC) was updated during this project in order to handle the shift made by the TSMC from a 1700 loop surveillance system to a 2200 loop system. Special computer programs were also written to provide specialized summary statistics for key stations. The new software allowed statistics for key stations to be collected and summarized during data transfer. The entire transfer retrieval system was streamlined during the Telecom project to reduce costs. Finally, freeway incident analysis was performed with a data set to demonstrate the use of the new system for TSM research.
Authors:
Nihan,N. L.
Keywords:
analysis, computer, computer program, cost, costs, data, data management, data transfer, freeway, freeway surveillance and control, incident, management, program, ramp metering, research, software, statistics, surveillance, systems, telecommunications, telecommunications link, traffic, traffic systems management, transportation systems management, TSM, Washington, WSDOT
|
Hallenbeck,M. E. | WA-RD 112.2 | Ferry Systems Data, Scheduling and Billing, Scheduling Systems Analysis | 1987 |
Abstract:
This report describes the feasibility, costs and benefits of automating the vessel and crew scheduling functions of the Marine Division of the Washington State Department of Transportation. The project examined the needs of the Marine Division, reviewed its current procedures, and compared available commercial and public domain software packages. Some existing packages intended for use by the transit and airline industries offer promise, but all the packages examined require considerable modification to meet the needs of the Marine Division.
Authors:
Hallenbeck,M. E.
Keywords:
analysis, automated toll collection, automated vehicle identification, AVI, benefit, benefits, billing, cost, costs, crew scheduling, data, ferry, ferry system, ITS, marine, public, scheduling, scheduling systems, software, systems, transit, transportation, vessel, Washington, Washington state
This report describes the feasibility, costs and benefits of automating the vessel and crew scheduling functions of the Marine Division of the Washington State Department of Transportation. The project examined the needs of the Marine Division, reviewed its current procedures, and compared available commercial and public domain software packages. Some existing packages intended for use by the transit and airline industries offer promise, but all the packages examined require considerable modification to meet the needs of the Marine Division.
Authors:
Hallenbeck,M. E.
Keywords:
analysis, automated toll collection, automated vehicle identification, AVI, benefit, benefits, billing, cost, costs, crew scheduling, data, ferry, ferry system, ITS, marine, public, scheduling, scheduling systems, software, systems, transit, transportation, vessel, Washington, Washington state
|
Ritchie,S. G. | WA-RD 083.1 | Statewide Highway Data Rationalization Study | 1986 |
Abstract:
This study involved an in-depth evaluation of the Washington State Department of Transportation highway data development and analysis activities. It developed statistically-based procedures and recommendations for a streamlined highway data collection program. Opportunities to reduce manpower and equipment costs, streamline work activities, improve the quality of data collection and provide accurate and timely data for the various users were identified. Given the focus on highway data, the major effort was devoted to the Department's traffic counting program. However, many data items and programs were considered, with the following receiving particular attention: traffic volume counting, including estimation of annual average daily traffic at any location throughout the state highway system; associated seasonal, axle and growth factors; vehicle classification; truck weights; and the relationship between the statistical sampling requirements recommended for these items and those associated with the FHWA Highway Performance Monitoring System in the state.
Authors:
Ritchie,S. G., Hallenbeck,M. E.
Keywords:
analysis, Annual, axle, cost, costs, data, data collection, developed, development, equipment, evaluation, highway, monitoring, performance, performance monitoring, program, quality, sampling, seasonal, Study, System, traffic, traffic counting, transportation, truck, vehicle classification, volume, Washington, Washington state, weight, weights
This study involved an in-depth evaluation of the Washington State Department of Transportation highway data development and analysis activities. It developed statistically-based procedures and recommendations for a streamlined highway data collection program. Opportunities to reduce manpower and equipment costs, streamline work activities, improve the quality of data collection and provide accurate and timely data for the various users were identified. Given the focus on highway data, the major effort was devoted to the Department's traffic counting program. However, many data items and programs were considered, with the following receiving particular attention: traffic volume counting, including estimation of annual average daily traffic at any location throughout the state highway system; associated seasonal, axle and growth factors; vehicle classification; truck weights; and the relationship between the statistical sampling requirements recommended for these items and those associated with the FHWA Highway Performance Monitoring System in the state.
Authors:
Ritchie,S. G., Hallenbeck,M. E.
Keywords:
analysis, Annual, axle, cost, costs, data, data collection, developed, development, equipment, evaluation, highway, monitoring, performance, performance monitoring, program, quality, sampling, seasonal, Study, System, traffic, traffic counting, transportation, truck, vehicle classification, volume, Washington, Washington state, weight, weights
|
Malsch,D. A. | WA-RD 085.1 | Evaluating The Effectiveness Of Liquid Anti-Strip Additives In Asphalt Cement | 1986 |
Abstract:
The use of liquid anti-stripping additives (LAA) for reducing moisture damage in asphalt concrete pavements was evaluated using pavement cores from pairs of projects with-and-without LAA. Results were analyzed using the tensile strength ratio (TSR). In addition, a diazo-dye for determining the presence and concentration of LAA was attempted to access the value or the test as a field procedure. The chemical additive detection tests proved inclusive, but the TSR analysis gave a positive indication of the need for the use of LAA in the wetter environments of the state, For drier environments and for low traffic volumes, use of LAA may not be cost effective. The indirect tensile test was judged to be a potentially valuable tool for statewide use in the evaluation of stripping additive needs.
Authors:
Malsch,D. A.
Keywords:
additive, analysis, anti-stripping agents, asphalt, asphalt concrete, Asphalt Concrete pavement, bituminous concrete, Chemical, concrete, cost, cost effective, damage, detection, diazo-dye test, effectiveness, environment, evaluation, indirect tension test, moisture damage, pavement, pavement life, pavements, project, strength, stripping, tests, traffic, traffic volumes, volume
The use of liquid anti-stripping additives (LAA) for reducing moisture damage in asphalt concrete pavements was evaluated using pavement cores from pairs of projects with-and-without LAA. Results were analyzed using the tensile strength ratio (TSR). In addition, a diazo-dye for determining the presence and concentration of LAA was attempted to access the value or the test as a field procedure. The chemical additive detection tests proved inclusive, but the TSR analysis gave a positive indication of the need for the use of LAA in the wetter environments of the state, For drier environments and for low traffic volumes, use of LAA may not be cost effective. The indirect tensile test was judged to be a potentially valuable tool for statewide use in the evaluation of stripping additive needs.
Authors:
Malsch,D. A.
Keywords:
additive, analysis, anti-stripping agents, asphalt, asphalt concrete, Asphalt Concrete pavement, bituminous concrete, Chemical, concrete, cost, cost effective, damage, detection, diazo-dye test, effectiveness, environment, evaluation, indirect tension test, moisture damage, pavement, pavement life, pavements, project, strength, stripping, tests, traffic, traffic volumes, volume
|
Higgins,J. D. | WA-RD 069.1 | Development Of Guidelines For Cuts On Loess Soils | 1985 |
Abstract:
The first phase of a three-phase research investigation of cut slope design criteria for southeastern Washington loess has been completed. A literature review of engineering properties of loess from other locales and design criteria applied by various state transportation departments were conducted. A1so, a preliminary field investigation was made to collect representative soil samples and record failure mechanisms. Past research has revealed that proper drainage control in combination with water content and gradational characteristics, are the primary factors influencing cut slope performance in loessial soils. Analysis of 40 soil samples collected during the field study, demonstrate a close similarity between southeastern Washington loess and deposits from the central United States. Although physical properties are similar, differing climates produce a disparity in failure mechanisms between Midwestern and southeastern Washington loessial deposits.
Authors:
Higgins,J. D., Fragaszy,R. J., Beard,L. D.
Keywords:
analysis, control, criteria, cut slope, design, design criteria, development, drainage, erosion, loess, performance, research, review, slope stability, soil, state-of-the-art, Study, transportation, Washington
The first phase of a three-phase research investigation of cut slope design criteria for southeastern Washington loess has been completed. A literature review of engineering properties of loess from other locales and design criteria applied by various state transportation departments were conducted. A1so, a preliminary field investigation was made to collect representative soil samples and record failure mechanisms. Past research has revealed that proper drainage control in combination with water content and gradational characteristics, are the primary factors influencing cut slope performance in loessial soils. Analysis of 40 soil samples collected during the field study, demonstrate a close similarity between southeastern Washington loess and deposits from the central United States. Although physical properties are similar, differing climates produce a disparity in failure mechanisms between Midwestern and southeastern Washington loessial deposits.
Authors:
Higgins,J. D., Fragaszy,R. J., Beard,L. D.
Keywords:
analysis, control, criteria, cut slope, design, design criteria, development, drainage, erosion, loess, performance, research, review, slope stability, soil, state-of-the-art, Study, transportation, Washington
|
Little,M. L. | WA-RD 039.12.1 | Assessment of pollutant loadings and concentration in highway stormwater runoff 891 | 1983 |
Abstract:
This report present the final form of the Washington State Highway runoff pollutant loading model, incorporating data from the five years of study. It also features a probabilistic analysis of concentration and loading data designed to express the chance of exceeding specific values in a given case. Other topics include further assessment of the toxicity of highway runoff and its causes and mitigation.
Authors:
Little,M. L., Horner,R. R., Mar,B. W.
Keywords:
analysis, Assessment, data, highway, highway runoff, ITS, mitigation, model, pollutant loading, runoff, stormwater, Toxicity, Washington, Washington state
This report present the final form of the Washington State Highway runoff pollutant loading model, incorporating data from the five years of study. It also features a probabilistic analysis of concentration and loading data designed to express the chance of exceeding specific values in a given case. Other topics include further assessment of the toxicity of highway runoff and its causes and mitigation.
Authors:
Little,M. L., Horner,R. R., Mar,B. W.
Keywords:
analysis, Assessment, data, highway, highway runoff, ITS, mitigation, model, pollutant loading, runoff, stormwater, Toxicity, Washington, Washington state
|
Kelly,W. J. | WA-RD 057.2 | Transit System Performance Evaluation Methodology for Washington State | 1983 |
Abstract:
This report examines major issues, concepts and methods of bus transit performance evaluation and suggests procedures and guidelines for internal and external monitoring in Washington State. In support of suggested procedures, data analysis on six years of operational and financial characteristics of Washington State systems, 1979-80 Section 15 data, and collected samples of small community/rural systems from other states was conducted. The major objective of the analysis was to test methodologies for developing and assessing transit peer groups\" relative to size and scale of operations, and prior to comparative within-group evaluation. The methodology entailed employing cluster analysis using up to 10 variables depicting service design and distribution. Two key variables were population and line miles. Problems were encountered in using Section 15 data. Due to its use of urban area, as opposed to service area population, clear distinctions of operating environments could not be determined. Thus, cluster groupings using Section 15 data were inconclusive. Cluster State systems (1980) were satisfactory and following additional verification, a suggested \"peer group\" classification for Washington State was recommended. The seven group types ranged in size from a rural regional (<40,000 population) to metropolitan (<1,000,00 population). Values for 8 efficiency and effectiveness indicators were used to assess \"peer group\" trends in performance in Washington over a five-year period (1976-80). Comparative evaluations of individual systems were not made. Despite only partial success in determining \"peer groups\", the study does identify methods and procedures for assisting in external and internal performance evaluation.
Authors:
Kelly,W. J., Rutherford,G. S.
Keywords:
peer group evaluation, analysis, bus, bus transit, cluster analysis, data, data collection, design, effectiveness, efficiency, environment, evaluation, group, indicator, indicators, Issues, ITS, line, methodology, methods, monitoring, Operating, performance, performance evaluation, performance measures, performance standards, population, rural, section 15 data, Study, System, systems, transit, urban, Washington, Washington state
This report examines major issues, concepts and methods of bus transit performance evaluation and suggests procedures and guidelines for internal and external monitoring in Washington State. In support of suggested procedures, data analysis on six years of operational and financial characteristics of Washington State systems, 1979-80 Section 15 data, and collected samples of small community/rural systems from other states was conducted. The major objective of the analysis was to test methodologies for developing and assessing transit peer groups\" relative to size and scale of operations, and prior to comparative within-group evaluation. The methodology entailed employing cluster analysis using up to 10 variables depicting service design and distribution. Two key variables were population and line miles. Problems were encountered in using Section 15 data. Due to its use of urban area, as opposed to service area population, clear distinctions of operating environments could not be determined. Thus, cluster groupings using Section 15 data were inconclusive. Cluster State systems (1980) were satisfactory and following additional verification, a suggested \"peer group\" classification for Washington State was recommended. The seven group types ranged in size from a rural regional (<40,000 population) to metropolitan (<1,000,00 population). Values for 8 efficiency and effectiveness indicators were used to assess \"peer group\" trends in performance in Washington over a five-year period (1976-80). Comparative evaluations of individual systems were not made. Despite only partial success in determining \"peer groups\", the study does identify methods and procedures for assisting in external and internal performance evaluation.
Authors:
Kelly,W. J., Rutherford,G. S.
Keywords:
peer group evaluation, analysis, bus, bus transit, cluster analysis, data, data collection, design, effectiveness, efficiency, environment, evaluation, group, indicator, indicators, Issues, ITS, line, methodology, methods, monitoring, Operating, performance, performance evaluation, performance measures, performance standards, population, rural, section 15 data, Study, System, systems, transit, urban, Washington, Washington state
|
Tai Wik,David Chui | WA-RD 039.12 | Highway Runoff In Washington State: Model Validation And Statistical Analysis 898 | 1982 |
Abstract:
Statewide sampling of highway runoff continued through 1980-81, and the resulting data has been aggregated with that from previous years to further investigate pollutant loadings. Results have validated the solids loading model previously proposed by Asplund (1980) for Western Washington Highways and tentatively extended the model to Eastern Washington. Loading of there pollutants can be predicted from total suspended solids loading using ratios derived from the data. These ratios may be taken as constants at any Washington State location for some pollutants or as linear functions of traffic or other contaminants. Comparison of runoff from a sulfur-extended asphalt pavement with runoff elsewhere indicates higher sulfate loads in the former case. A limited sampling program along an uncurbed highway section observed higher pollutant concentrations from these sections to curbed areas. Sampling of solids adhering to the undercarriage of automobiles produced widely varying results but suggested that vehicles traveling on rural or unpaved roads accumulate significant amounts of solids that can be released on highways. The final year of field sampling will concentrate on improving the loading models, especially for Eastern Washington application, and continuing the sulfur extended asphalt study with a functional control site experiencing the same conditions.
Authors:
Tai Wik,David Chui, Mar,B. W., Horner,R. R.
Keywords:
analysis, asphalt, asphalt pavement, Concentrations, condition, control, data, extended asphalt, highway, highway runoff, Highways, loads, model, models, pavement, pollutant loading, Pollutants, program, runoff, rural, sampling, statistical analysis, sulfur, suspended solids, traffic, Washington, Washington state
Statewide sampling of highway runoff continued through 1980-81, and the resulting data has been aggregated with that from previous years to further investigate pollutant loadings. Results have validated the solids loading model previously proposed by Asplund (1980) for Western Washington Highways and tentatively extended the model to Eastern Washington. Loading of there pollutants can be predicted from total suspended solids loading using ratios derived from the data. These ratios may be taken as constants at any Washington State location for some pollutants or as linear functions of traffic or other contaminants. Comparison of runoff from a sulfur-extended asphalt pavement with runoff elsewhere indicates higher sulfate loads in the former case. A limited sampling program along an uncurbed highway section observed higher pollutant concentrations from these sections to curbed areas. Sampling of solids adhering to the undercarriage of automobiles produced widely varying results but suggested that vehicles traveling on rural or unpaved roads accumulate significant amounts of solids that can be released on highways. The final year of field sampling will concentrate on improving the loading models, especially for Eastern Washington application, and continuing the sulfur extended asphalt study with a functional control site experiencing the same conditions.
Authors:
Tai Wik,David Chui, Mar,B. W., Horner,R. R.
Keywords:
analysis, asphalt, asphalt pavement, Concentrations, condition, control, data, extended asphalt, highway, highway runoff, Highways, loads, model, models, pavement, pollutant loading, Pollutants, program, runoff, rural, sampling, statistical analysis, sulfur, suspended solids, traffic, Washington, Washington state
|
Public Transportation and Planning Division | WA-RD 047.1 | Transportation Problems Associated with Uneven Growth Rates 902 | 1982 |
Abstract:
The purpose of the study is to determine how distinctive social, economic, land use, governmental and political characteristics in the Vancouver-Portland area to uneven growth which in turn affects the transportation system. Interviews with public and private industrial representatives to identify the reasons underlying uneven growth are discussed. A statistical analysis of population, employment, vehicle registration and traffic across the Interstate 5 bridge connecting Vancouver and Portland is also presented. Recommendations are listed which suggest ways to improve the transportation system through modification of elements contributing to uneven growth.
Authors:
Public Transportation and Planning Division, Washington State Department of Transportation
Keywords:
analysis, bi-city, bi-state, bridge, economic development, employment, industrial location decision, interviews, land use, land use sewerage, land-use, population, public, statistical analysis, Study, System, traffic, traffic volumes, transportation, Uneven growth rate
The purpose of the study is to determine how distinctive social, economic, land use, governmental and political characteristics in the Vancouver-Portland area to uneven growth which in turn affects the transportation system. Interviews with public and private industrial representatives to identify the reasons underlying uneven growth are discussed. A statistical analysis of population, employment, vehicle registration and traffic across the Interstate 5 bridge connecting Vancouver and Portland is also presented. Recommendations are listed which suggest ways to improve the transportation system through modification of elements contributing to uneven growth.
Authors:
Public Transportation and Planning Division, Washington State Department of Transportation
Keywords:
analysis, bi-city, bi-state, bridge, economic development, employment, industrial location decision, interviews, land use, land use sewerage, land-use, population, public, statistical analysis, Study, System, traffic, traffic volumes, transportation, Uneven growth rate
|
Public Transportation and Planning Division | WA-RD 048.1 | Small Car Accident Experience in Washington State 901 | 1982 |
Abstract:
This small car accident study investigated accidents in Washington State in four passenger car categories: subcompact, compact intermediate, and large. The primary purpose of the study was to evaluate the effects on safety of increases in the number of smaller cars on the highways. Traffic accident data for the period 1973-79 were analyzed to determine the accident severity for the different automobile classes, and this analysis showed that the smaller vehicles had a higher proportion of fatal and injury accidents that the other categories.The, accident data for 1980 were used to compare accident experience with regard to injury class of the occupants, roadway surface conditions, roadway character, light conditions, collision type, objects struck, and location of accident. Analysis showed that for total accidents per one thousand registered vehicles, the large cars had a higher rate (68) than either the subcompacts (43), compacts (45), or intermediate size vehicles (46). However, the subcompacts and compacts had higher percentages of fatalities and serious injuries to their occupants, and a higher proportion of such accidents occurred on wet, snowy, and icy surfaces. In addition, the smaller passenger vehicles had a higher incidence of overturning and rear-end accidents. The analysis suggests there will be significant increases in fatal and injury accidents in future years as the number of smaller vehicles increases. Thus, the report contains recommendations for changes in highway and vehicle design that will modify these adverse trends and reduce injuries and fatalities among drivers and passengers.Some of the recommendations can be implemented fairly quickly, but others will take longer. However, until changes are made, the accident severity for small cars will continue at a level above that for larger automobiles.
Authors:
Public Transportation and Planning Division
Keywords:
accident severity, accidents, analysis, collision, condition, data, design, highway, Highways, light, overturning, roadway, safety, Study, traffic, traffic accident data, Washington, Washington state
This small car accident study investigated accidents in Washington State in four passenger car categories: subcompact, compact intermediate, and large. The primary purpose of the study was to evaluate the effects on safety of increases in the number of smaller cars on the highways. Traffic accident data for the period 1973-79 were analyzed to determine the accident severity for the different automobile classes, and this analysis showed that the smaller vehicles had a higher proportion of fatal and injury accidents that the other categories.The, accident data for 1980 were used to compare accident experience with regard to injury class of the occupants, roadway surface conditions, roadway character, light conditions, collision type, objects struck, and location of accident. Analysis showed that for total accidents per one thousand registered vehicles, the large cars had a higher rate (68) than either the subcompacts (43), compacts (45), or intermediate size vehicles (46). However, the subcompacts and compacts had higher percentages of fatalities and serious injuries to their occupants, and a higher proportion of such accidents occurred on wet, snowy, and icy surfaces. In addition, the smaller passenger vehicles had a higher incidence of overturning and rear-end accidents. The analysis suggests there will be significant increases in fatal and injury accidents in future years as the number of smaller vehicles increases. Thus, the report contains recommendations for changes in highway and vehicle design that will modify these adverse trends and reduce injuries and fatalities among drivers and passengers.Some of the recommendations can be implemented fairly quickly, but others will take longer. However, until changes are made, the accident severity for small cars will continue at a level above that for larger automobiles.
Authors:
Public Transportation and Planning Division
Keywords:
accident severity, accidents, analysis, collision, condition, data, design, highway, Highways, light, overturning, roadway, safety, Study, traffic, traffic accident data, Washington, Washington state
|
Nelson,Thomas L. | WA-RD 050.1 | Development And Implementation Of Washington State's Pavement System 905 | 1982 |
Abstract:
This report describes the pavement management system developed by WSDOT staff over a period of five years. Both project-level and network-level pavement management are represented within the four broad areas of data processing which combine to constitute the foundation of the system.The design of a pavement data file is laid out together with the process of assembling it. Also shown are the methods used to analyze and convert the file data from pavement condition ratings to pavement performance curves for each project. The performance curves are then used, together with appropriate cost data, to determine the most cost-effective type and time to fix. The network-level program then summarized the need work for each year of a rehabilitation program. Mean are provided for adjusting the program to fit budget constraints or minimum acceptable levels of average pavement condition.It is concluded that the system, operating on biennial pavement condition ratings, provides a good solid framework for orderly analysis to estimate the economic benefits of the type, timing, and sequence of rehabilitation activities applied to a pavement.
Authors:
Nelson,Thomas L., LeClerc,R. V.
Keywords:
analysis, benefit, benefits, condition, cost, data, design, developed, development, foundation, framework, management, management system, methods, Operating, pavement, pavement condition, pavement data file, pavement management, pavement performance, performance, program, project, rehabilitation, System, Washington, Washington state, WSDOT
This report describes the pavement management system developed by WSDOT staff over a period of five years. Both project-level and network-level pavement management are represented within the four broad areas of data processing which combine to constitute the foundation of the system.The design of a pavement data file is laid out together with the process of assembling it. Also shown are the methods used to analyze and convert the file data from pavement condition ratings to pavement performance curves for each project. The performance curves are then used, together with appropriate cost data, to determine the most cost-effective type and time to fix. The network-level program then summarized the need work for each year of a rehabilitation program. Mean are provided for adjusting the program to fit budget constraints or minimum acceptable levels of average pavement condition.It is concluded that the system, operating on biennial pavement condition ratings, provides a good solid framework for orderly analysis to estimate the economic benefits of the type, timing, and sequence of rehabilitation activities applied to a pavement.
Authors:
Nelson,Thomas L., LeClerc,R. V.
Keywords:
analysis, benefit, benefits, condition, cost, data, design, developed, development, foundation, framework, management, management system, methods, Operating, pavement, pavement condition, pavement data file, pavement management, pavement performance, performance, program, project, rehabilitation, System, Washington, Washington state, WSDOT
|
Nelson,Thomas L. | WA-RD 050.2 | Development And Implementation Of Washington State's Pavement System - Summary 906 | 1982 |
Abstract:
This report describes the pavement system developed by staff over a period of five years. Both project-level and network-level pavement are represented within the four broad areas of data processing which combine to constitute the foundation of the system. The design of a pavement data file is laid out together with the process of assembling it. Also shown are the methods used to analyze and convert the file data pavement condition ratings to pavement performance curves for each project. The performance curves are then used, together with appropriate cost data, to determine the most cost-effective type and of fix. The network-level program then the needed work for each year of a rehabilitation program. Means are provided for adjusting the program to fit budget constraints or acceptable levels of average pavement condition It is concluded that the system, operating on biennial pavement condition ratings, provides a good solid framework for orderly analysis to estimate the economic benefits of the type, timing, and sequence of rehabilitation activities apply to a pavement.
Authors:
Nelson,Thomas L., LeClerc,R. V.
Keywords:
analysis, benefit, benefits, condition, cost, cost effective, data, design, developed, development, foundation, framework, management, management system, methods, Operating, pavement, pavement condition, pavement data file, pavement management, pavement performance, performance, program, project, rehabilitation, System, Washington, Washington state, WSDOT
This report describes the pavement system developed by staff over a period of five years. Both project-level and network-level pavement are represented within the four broad areas of data processing which combine to constitute the foundation of the system. The design of a pavement data file is laid out together with the process of assembling it. Also shown are the methods used to analyze and convert the file data pavement condition ratings to pavement performance curves for each project. The performance curves are then used, together with appropriate cost data, to determine the most cost-effective type and of fix. The network-level program then the needed work for each year of a rehabilitation program. Means are provided for adjusting the program to fit budget constraints or acceptable levels of average pavement condition It is concluded that the system, operating on biennial pavement condition ratings, provides a good solid framework for orderly analysis to estimate the economic benefits of the type, timing, and sequence of rehabilitation activities apply to a pavement.
Authors:
Nelson,Thomas L., LeClerc,R. V.
Keywords:
analysis, benefit, benefits, condition, cost, cost effective, data, design, developed, development, foundation, framework, management, management system, methods, Operating, pavement, pavement condition, pavement data file, pavement management, pavement performance, performance, program, project, rehabilitation, System, Washington, Washington state, WSDOT
|
LaChapplle,E. R. | WA-RD 023.4 | Central Avalanche Hazard Forecasting - Summary Of Scientific Investigations 947 | 1978 |
Abstract:
The Central Avalanche Hazard Forecasting project had had two principal aims : The design and establishment of an avalanche data network and central avalanche and mountain weather forecasting facility to serve the highway passes and other hazard areas of the Cascade Mountains in Washington. Improvements in the practices of conventional avalanche forecasting and the introduction of new techniques in statistical analysis and pattern recognition. Achievement of the first aim has been described in previous Reports 23.2 and 23.3. This present Report 23.4 gives the results of fundamental research into avalanche forecasting theory and discusses the application of these results is to central avalanche forecasting for the Cascade Mountains of Western Washington .
Authors:
LaChapplle,E. R., Furguson,S. A., Marriott,R. T., Moore,M. B., Reanier,F. W., Sackett,E. M., Taylor,P. L.
Keywords:
analysis, avalanche, avalanche forecasting, snow, weather, data, design, facilities, forecasting, hazard, highway, project, research, Washington
The Central Avalanche Hazard Forecasting project had had two principal aims : The design and establishment of an avalanche data network and central avalanche and mountain weather forecasting facility to serve the highway passes and other hazard areas of the Cascade Mountains in Washington. Improvements in the practices of conventional avalanche forecasting and the introduction of new techniques in statistical analysis and pattern recognition. Achievement of the first aim has been described in previous Reports 23.2 and 23.3. This present Report 23.4 gives the results of fundamental research into avalanche forecasting theory and discusses the application of these results is to central avalanche forecasting for the Cascade Mountains of Western Washington .
Authors:
LaChapplle,E. R., Furguson,S. A., Marriott,R. T., Moore,M. B., Reanier,F. W., Sackett,E. M., Taylor,P. L.
Keywords:
analysis, avalanche, avalanche forecasting, snow, weather, data, design, facilities, forecasting, hazard, highway, project, research, Washington
|
Terrel,R. L. | WA-RD 017.2 | Mechanistic Behavior of Pavement Systems | 1976 |
Abstract:
As part of their continuing effort to prolong the life of existing pavement systems, highway engineers must continue to improve upon design and rehabilitation methods. In past years, design methods based upon empericism have been employed with considerable success. As loading and materials change or become more complex, the older practices become less useful and a new approach undertaken. Throughout the U.S. and elsewhere, there has been emerging new technology often termed " rational " , "systematic", "mechanistic", and other terms used to describe new approaches to pavement analysis and design. Mostof these are based on elastic or viscoelastic layered representation of the pavement structure and have the potential to become powerful tools for the highway engineer. In recent years, the University of Washington has assisted the Washington State Highway Department on various research projects . One project resulted in a report that has been used to develop guidelines for allowable truck traffic through the concept of pavement damage and/or remaining life . The basis forth is report was the concept that pavement structures can be reasonably well represented by elastic layered systems. Analysis of the mechanistic behavior can then be used to predict pavement response and l i f e expectancy. As a result of this study and after discussions with Highway Department personnel, it was determined that the procedures, techniques, as well as other information used in the above report may be of further interest to them. In other words, the methods as well as results had potential utilization in a wide range of applications . As a result , a seminar program was set up whereby the writer would conduct or lead weekly discussion sessions on key topics.
Authors:
Terrel,R. L.
Keywords:
analysis, applications, behavior, damage, design, highway, materials, mechanistic, pavement, pavement damage, program, rehabilitation, remaining life, research, seminar, structures, systems, technology, traffic, truck, Washington, Washington state
As part of their continuing effort to prolong the life of existing pavement systems, highway engineers must continue to improve upon design and rehabilitation methods. In past years, design methods based upon empericism have been employed with considerable success. As loading and materials change or become more complex, the older practices become less useful and a new approach undertaken. Throughout the U.S. and elsewhere, there has been emerging new technology often termed " rational " , "systematic", "mechanistic", and other terms used to describe new approaches to pavement analysis and design. Mostof these are based on elastic or viscoelastic layered representation of the pavement structure and have the potential to become powerful tools for the highway engineer. In recent years, the University of Washington has assisted the Washington State Highway Department on various research projects . One project resulted in a report that has been used to develop guidelines for allowable truck traffic through the concept of pavement damage and/or remaining life . The basis forth is report was the concept that pavement structures can be reasonably well represented by elastic layered systems. Analysis of the mechanistic behavior can then be used to predict pavement response and l i f e expectancy. As a result of this study and after discussions with Highway Department personnel, it was determined that the procedures, techniques, as well as other information used in the above report may be of further interest to them. In other words, the methods as well as results had potential utilization in a wide range of applications . As a result , a seminar program was set up whereby the writer would conduct or lead weekly discussion sessions on key topics.
Authors:
Terrel,R. L.
Keywords:
analysis, applications, behavior, damage, design, highway, materials, mechanistic, pavement, pavement damage, program, rehabilitation, remaining life, research, seminar, structures, systems, technology, traffic, truck, Washington, Washington state
|
Iverson,E. A. | WA-RD 025.6 | Guidelines For the Identification And Analysis Of Social Factors In Transportation Planning | 1976 |
Abstract:
The objective of study was to develop criteria and procedures for the identification and measurement of social in transportation planning and the process by which such analyses are integrated into the decision-making process. The guidelines developed from this address several related but different parts of the total planning and design process. Two of the reports prepared as a part of this study are concerned with identifying and measuring social factors and conducting social and economic surveys to obtain necessary data. A third report is concerned with the development and implementation of involvement programs. The is made that an effective planning and design process must provide means by which the values and of residents of affected and users of transportation facilities can be incorporated in technical studies and the decision-making process. Two additional reports contain guidelines for the operation of interdisciplinary teams and team scheduling and management. The systematic interdisciplinary approach undertaken in the State of Washington provides a means by which technical data, values and opinions, and planning and design concepts and standards can all be evaluated by the team in reaching a solution to a problem.
Authors:
Iverson,E. A.
Keywords:
analysis, Community Involvement, Social Factors, Socio-Economic Surveys, Inter-disciplinary Team Operation and Management, criteria, data, design, design process, developed, development, facilities, impacts, management, planning, program, scheduling, survey, Surveys, transportation, transportation planning, Washington
The objective of study was to develop criteria and procedures for the identification and measurement of social in transportation planning and the process by which such analyses are integrated into the decision-making process. The guidelines developed from this address several related but different parts of the total planning and design process. Two of the reports prepared as a part of this study are concerned with identifying and measuring social factors and conducting social and economic surveys to obtain necessary data. A third report is concerned with the development and implementation of involvement programs. The is made that an effective planning and design process must provide means by which the values and of residents of affected and users of transportation facilities can be incorporated in technical studies and the decision-making process. Two additional reports contain guidelines for the operation of interdisciplinary teams and team scheduling and management. The systematic interdisciplinary approach undertaken in the State of Washington provides a means by which technical data, values and opinions, and planning and design concepts and standards can all be evaluated by the team in reaching a solution to a problem.
Authors:
Iverson,E. A.
Keywords:
analysis, Community Involvement, Social Factors, Socio-Economic Surveys, Inter-disciplinary Team Operation and Management, criteria, data, design, design process, developed, development, facilities, impacts, management, planning, program, scheduling, survey, Surveys, transportation, transportation planning, Washington
|
Brown,C. | WA-RD 044.3 | Evergreen Point Bridge Maintenance Problems - Annual Report | 1976 |
Abstract:
This report reflects a year of data gathering together with the completion of analysis programs. These include the initial tape conversion, data rejection and selection, fast Fourier transform coefficient computation. Complete statistics of measurements are given.
Authors:
Brown,C.
Keywords:
analysis, Annual, bridge, data, fatigue, maintenance, program, reliability, statistics, wind
This report reflects a year of data gathering together with the completion of analysis programs. These include the initial tape conversion, data rejection and selection, fast Fourier transform coefficient computation. Complete statistics of measurements are given.
Authors:
Brown,C.
Keywords:
analysis, Annual, bridge, data, fatigue, maintenance, program, reliability, statistics, wind
|
Social and Econonomic Planning Section of the WA State Department of Highways | WA-RD 025.2 | Guidelines For The Identification And Measurement Of Social Factors In Transportation Planning | 1975 |
Abstract:
The purpose of this study is to establish guidelines and procedures for the measurement of the social effects of transportation systems and facilities on both a regional and community or neighborhood level. This coincides with the increased emphasis on human factors in the planning and design of transportation systems and facilities, which has necessitated the development of a systematic approach to gathering social data and developing normative standards. In part of this increased emphasis has been mandated by Federal statutes such as the National Environmental Policy Act o f 1969 and the Intergovernmental Act of 1968.A detailed examination of the seven-fold classification scheme of social factors and an emphasis on the methodologies used to evaluate social impacts is discussed. Emphasis is placed on the analytical framework utilizing the major phases of inventing existing social conditions, identifying potential changes and measurement of probable impacts. From this analysis a systematic approach to identifying and measuring social impact in transportation planning is put forth, for use by those assigned this responsibility.
Authors:
Social and Econonomic Planning Section of the WA State Department of Highways
Keywords:
analysis, condition, data, design, development, environmental, facilities, framework, human factors, impact, impacts, Measurement of Social Impact, social factors, community identity, community values and desires, community cohesion, disruption, displacement, relocation, minority interest, methodology, planning, policy, systems, transportation, transportation planning
The purpose of this study is to establish guidelines and procedures for the measurement of the social effects of transportation systems and facilities on both a regional and community or neighborhood level. This coincides with the increased emphasis on human factors in the planning and design of transportation systems and facilities, which has necessitated the development of a systematic approach to gathering social data and developing normative standards. In part of this increased emphasis has been mandated by Federal statutes such as the National Environmental Policy Act o f 1969 and the Intergovernmental Act of 1968.A detailed examination of the seven-fold classification scheme of social factors and an emphasis on the methodologies used to evaluate social impacts is discussed. Emphasis is placed on the analytical framework utilizing the major phases of inventing existing social conditions, identifying potential changes and measurement of probable impacts. From this analysis a systematic approach to identifying and measuring social impact in transportation planning is put forth, for use by those assigned this responsibility.
Authors:
Social and Econonomic Planning Section of the WA State Department of Highways
Keywords:
analysis, condition, data, design, development, environmental, facilities, framework, human factors, impact, impacts, Measurement of Social Impact, social factors, community identity, community values and desires, community cohesion, disruption, displacement, relocation, minority interest, methodology, planning, policy, systems, transportation, transportation planning
|
Koontz,B. | WA-RD 028.1 | Evaluation of Origin-Destination Data for an External Cordon Line Survey | 1975 |
Abstract:
The primary travel characteristic in question is the mirroring of the magnitude and distribution of the inbound trip patterns to the patterns of the outbound trips. The linear regression analysis for the internal-external (IE) trips plotted by direction and zone volume provided a correlation of 0.09885 for all survey stations combined. The association of the regression lines with the expected 45 degree line when plotting inbound versus outbound trips by zone is a second indicator, and showed an average intercept of about +2.6 trips with a slope of 0.989. The standard error of the estimate was calculated to by 37 trips for all stations combined. The average number of trips per zone is 237.5.A similar analysis of the external-external (EE) trips produced a regression correlation of 0.9954 and the regression lines had an average intercept of +1.5 trips with a line slope of 0.996. In addition to studying the distribution of the trips by zone, the O-D data was stratified into four purposes: 1) work 2) personal, business and shopping 3) social recreation, and 4) other. Percent trips by purpose and by direction were calculated and for all stations combined there was less that a 2% discrepancy for any single purpose. The best match was work trips (0.4% difference) and the greatest difference was in the social-recreation trips, with a 1.9% difference.A comparison of the distribution of trips by trip length was the final area investigated. For I.E. trips inside the cordon line the inbound direction showed an average trip length of 8,86 minutes with a standard deviation of 3.44 minutes and the outbound direction produced and average trip length of 8.89 minutes with a standard deviation of 3.43 minutes.
Authors:
Koontz,B., Kirkland,C. K.
Keywords:
analysis, cordon, data, Error, evaluation, External Cordon, line, Line Survey, Origin-Destination, recreation, regression, regression analysis, survey, travel, trip length, volume, work trip
The primary travel characteristic in question is the mirroring of the magnitude and distribution of the inbound trip patterns to the patterns of the outbound trips. The linear regression analysis for the internal-external (IE) trips plotted by direction and zone volume provided a correlation of 0.09885 for all survey stations combined. The association of the regression lines with the expected 45 degree line when plotting inbound versus outbound trips by zone is a second indicator, and showed an average intercept of about +2.6 trips with a slope of 0.989. The standard error of the estimate was calculated to by 37 trips for all stations combined. The average number of trips per zone is 237.5.A similar analysis of the external-external (EE) trips produced a regression correlation of 0.9954 and the regression lines had an average intercept of +1.5 trips with a line slope of 0.996. In addition to studying the distribution of the trips by zone, the O-D data was stratified into four purposes: 1) work 2) personal, business and shopping 3) social recreation, and 4) other. Percent trips by purpose and by direction were calculated and for all stations combined there was less that a 2% discrepancy for any single purpose. The best match was work trips (0.4% difference) and the greatest difference was in the social-recreation trips, with a 1.9% difference.A comparison of the distribution of trips by trip length was the final area investigated. For I.E. trips inside the cordon line the inbound direction showed an average trip length of 8,86 minutes with a standard deviation of 3.44 minutes and the outbound direction produced and average trip length of 8.89 minutes with a standard deviation of 3.43 minutes.
Authors:
Koontz,B., Kirkland,C. K.
Keywords:
analysis, cordon, data, Error, evaluation, External Cordon, line, Line Survey, Origin-Destination, recreation, regression, regression analysis, survey, travel, trip length, volume, work trip
|
Brown,C. B. | WA-RD 044.2 | Evergreen Point Bridge Maintenance Problems - Annual Report | 1975 |
Abstract:
This report completely describes the instrumentation on the drawspan of this Evergreen Point Bridge. The design and construction of the data recording system, with the complete calibration of the measurement and collection system is given. Initial data collection and preliminary analysis is set out. The analysis was subsequently abandoned, the data was retained.
Authors:
Brown,C. B.
Keywords:
analysis, Annual, bridge, calibration, construction, data, data collection, design, fatigue, maintenance, reliability, System, wind
This report completely describes the instrumentation on the drawspan of this Evergreen Point Bridge. The design and construction of the data recording system, with the complete calibration of the measurement and collection system is given. Initial data collection and preliminary analysis is set out. The analysis was subsequently abandoned, the data was retained.
Authors:
Brown,C. B.
Keywords:
analysis, Annual, bridge, calibration, construction, data, data collection, design, fatigue, maintenance, reliability, System, wind
|
Richey,E. P. | WA-RD 013.1 | Attenuation of Random Deep Water Waves By Porous Walled Breakwater | 1974 |
Abstract:
The porous walled resonating chamber, a type of breakwater, is investigated as a means of reducing reflected waves from structures subjected to random wind generated waves in deep water. Extending laboratory monochromatic studies to a full-scale apparatus appended to a floating bridge allows assessment of scale factors and the effects of random waves on the predicted performance of thedevice as a linear damped oscillator . The full-scale device is shown to be frequency selective at a frequency precisely corresponding to the predicted resonance of the system. The forces, measured on the porous wall, are lower than predicted and the device completely eliminates the problem of wave runuponto the bridge roadway. The method of evaluating the energy attenuation by the breakwater incorporates spectral analysis of digitized data recorded at fixed locations equidistant in front of the chamber and at a remote station away from the influence of the breakwater. Analysis demonstrates that the time average energy density at a fixed location where incident and reflected waves co-exist is influenced not only by the wave amplitudes, as expected, but also by the product of the amplitudes and a function of the phase angle. The chamber effects a change in the random phase angle during reflection , producing a different effective distance of wave travel to the fixed location and thus negating quantitative analysis of the energy dissipation.
Authors:
Richey,E. P., Morden,D. B., Hartz,B. J.
Keywords:
analysis, Assessment, attenuation, Breakwater, bridge, data, density, Energy, floating bridge, forces, incident, performance, roadway, structures, travel, Wave attenuation, wind
The porous walled resonating chamber, a type of breakwater, is investigated as a means of reducing reflected waves from structures subjected to random wind generated waves in deep water. Extending laboratory monochromatic studies to a full-scale apparatus appended to a floating bridge allows assessment of scale factors and the effects of random waves on the predicted performance of thedevice as a linear damped oscillator . The full-scale device is shown to be frequency selective at a frequency precisely corresponding to the predicted resonance of the system. The forces, measured on the porous wall, are lower than predicted and the device completely eliminates the problem of wave runuponto the bridge roadway. The method of evaluating the energy attenuation by the breakwater incorporates spectral analysis of digitized data recorded at fixed locations equidistant in front of the chamber and at a remote station away from the influence of the breakwater. Analysis demonstrates that the time average energy density at a fixed location where incident and reflected waves co-exist is influenced not only by the wave amplitudes, as expected, but also by the product of the amplitudes and a function of the phase angle. The chamber effects a change in the random phase angle during reflection , producing a different effective distance of wave travel to the fixed location and thus negating quantitative analysis of the energy dissipation.
Authors:
Richey,E. P., Morden,D. B., Hartz,B. J.
Keywords:
analysis, Assessment, attenuation, Breakwater, bridge, data, density, Energy, floating bridge, forces, incident, performance, roadway, structures, travel, Wave attenuation, wind
|
Leonhardt,K. | WA-RD 011.2 | Recreational Trip Characteristics And Travel Patterns - Second Phase Of The Washington State Recreational Travel Study 9... | 1973 |
Abstract:
The objectives of this research are two-fold: 1) to identify characteristics of recreational trips, and 2) to identify factors influencing the distribution of recreational trips. Characteristics of recreational trips have been identified on the basis of data collected from different state agencies in the State of Washington. Seven recreational trip purposes which are characteristic for the State of Washington have been identified in this study: 1) camping trips, 2) hunting trips 3) fishing trips, 4) visiting beaches and clamming, 5) snow skiing, 6) driving for pleasure and sightseeing, and 7) others.The analysis has been performed basically for the spatial and temporal distribution of recreational trips. Spatial distribution relates to the location of the recreational opportunities which can clearly be distinct for each of the trip purposes and is further characterized by the trip-length frequency connected with each of these trip purposes. Temporal distribution is related primarily to the seasons within which the activity corresponding to the trip purpose can be pursued.A further reason for classifying recreational trips into these seven purposes is the difference in travel behavior that can be observed in connection with trip purposes. For example, hunting, fishing, and snow skiing are trips with a distinct destination, and the trip maker tends to select the shortest route to his destination in order to minimize the travel time. Travel to the trip destination is not, therefore, an essential part of the recreation experience. On the other hand, driving for pleasure and sightseeing creates different travel behavior.
Authors:
Leonhardt,K.
Keywords:
agencies, analysis, behavior, data, objectives, recreation, Recreational travel, research, season, snow, travel, travel behavior, travel patterns, travel time, trip length, Washington, Washington state
The objectives of this research are two-fold: 1) to identify characteristics of recreational trips, and 2) to identify factors influencing the distribution of recreational trips. Characteristics of recreational trips have been identified on the basis of data collected from different state agencies in the State of Washington. Seven recreational trip purposes which are characteristic for the State of Washington have been identified in this study: 1) camping trips, 2) hunting trips 3) fishing trips, 4) visiting beaches and clamming, 5) snow skiing, 6) driving for pleasure and sightseeing, and 7) others.The analysis has been performed basically for the spatial and temporal distribution of recreational trips. Spatial distribution relates to the location of the recreational opportunities which can clearly be distinct for each of the trip purposes and is further characterized by the trip-length frequency connected with each of these trip purposes. Temporal distribution is related primarily to the seasons within which the activity corresponding to the trip purpose can be pursued.A further reason for classifying recreational trips into these seven purposes is the difference in travel behavior that can be observed in connection with trip purposes. For example, hunting, fishing, and snow skiing are trips with a distinct destination, and the trip maker tends to select the shortest route to his destination in order to minimize the travel time. Travel to the trip destination is not, therefore, an essential part of the recreation experience. On the other hand, driving for pleasure and sightseeing creates different travel behavior.
Authors:
Leonhardt,K.
Keywords:
agencies, analysis, behavior, data, objectives, recreation, Recreational travel, research, season, snow, travel, travel behavior, travel patterns, travel time, trip length, Washington, Washington state
|
LaChapplle,E. R. | WA-RD 008.3 | Methods Of Avalanche Control On Washington State Highways - Second Annual Report 1007 | 1972 |
Abstract:
An interim report of the second year of a three-year study of avalanche hazards along Washington mountain highways is presented. Applicable snow, avalanche and weather data for 1971-72 are given. Also included is a theoretical treatment o f the stress analysis of slab avalanches and a bibliography of snow clearing technology.
Authors:
LaChapplle,E. R., Brown,C. B., Evans,R. J.
Keywords:
analysis, Annual, avalanche, Avalanche control, Washington mountain highways, Snow and weather data, Snow clearing technology, Avalanches, control, data, hazard, highway, Highways, Interim, methods, snow, stresses, Study, technology, Washington, Washington state
An interim report of the second year of a three-year study of avalanche hazards along Washington mountain highways is presented. Applicable snow, avalanche and weather data for 1971-72 are given. Also included is a theoretical treatment o f the stress analysis of slab avalanches and a bibliography of snow clearing technology.
Authors:
LaChapplle,E. R., Brown,C. B., Evans,R. J.
Keywords:
analysis, Annual, avalanche, Avalanche control, Washington mountain highways, Snow and weather data, Snow clearing technology, Avalanches, control, data, hazard, highway, Highways, Interim, methods, snow, stresses, Study, technology, Washington, Washington state
|
Hou,Cheng-Yeh | WA-RD 001.1 | Aerotriangulation Analysis and Control Point Error Detection | 1972 |
Abstract:
A major problem faced by personnel responsible for manipulating aerotriangulation data through transformation and adjustment programs in an electronic computer is that of isolating and detecting blunders and other erroneous data. This study created an automated data analysis and rejection program to reduce the turn around time from initial entry to certification of the final adjustment. Parameters for establishing the smallest detectable errors for rejection were determined by analyses of error sources in ground control surveys, aerial photography, and aerotriangulation theory and operations. Some seldom considered theorectical and practical error sources in ground control surveys are discussed and resolved. The data rejection program chart is listed in the appendix.
Authors:
Hou,Cheng-Yeh
Keywords:
aerial photography, analysis, computer, control, data, detection, error detection, program, Standard error, solar altitude, linear transformation, strip adjustment, aerotriangulation, deflection of vertical, refraction in precise leveling, second term, double summation, image motion, film distortion, flight height, survey
A major problem faced by personnel responsible for manipulating aerotriangulation data through transformation and adjustment programs in an electronic computer is that of isolating and detecting blunders and other erroneous data. This study created an automated data analysis and rejection program to reduce the turn around time from initial entry to certification of the final adjustment. Parameters for establishing the smallest detectable errors for rejection were determined by analyses of error sources in ground control surveys, aerial photography, and aerotriangulation theory and operations. Some seldom considered theorectical and practical error sources in ground control surveys are discussed and resolved. The data rejection program chart is listed in the appendix.
Authors:
Hou,Cheng-Yeh
Keywords:
aerial photography, analysis, computer, control, data, detection, error detection, program, Standard error, solar altitude, linear transformation, strip adjustment, aerotriangulation, deflection of vertical, refraction in precise leveling, second term, double summation, image motion, film distortion, flight height, survey
|
Hou,Cheng-Yeh | WA-RD 001.1A | Aerotriangulation Analysis and Contrl Point Error Detection - Executive Summary | 1972 |
Abstract:
A major problem faced by personnel responsible for manipulating aerotriangulation data through transformation and adjustment programs in an electronic computer is that of isolating and detecting blunders and other erroneous data. This study created an automated data analysis and rejection program to reduce the turn around time from initial entry to certification of the final adjustment. Parameters for establishing the smallest detectable errors for rejection were determined by analyses of error sources in ground control surveys, aerial photography, and aerotriangulation theory and operations. Some seldom considered theorectical and practical error sources in ground control surveys are discussed and resolved. The data rejection program chart is listed in the appendix
Authors:
Hou,Cheng-Yeh
Keywords:
aerial photography, Aerotriangulation, analysis, analysis and control, computer, control, data, detection, Error, error detection, Executive, program, survey
A major problem faced by personnel responsible for manipulating aerotriangulation data through transformation and adjustment programs in an electronic computer is that of isolating and detecting blunders and other erroneous data. This study created an automated data analysis and rejection program to reduce the turn around time from initial entry to certification of the final adjustment. Parameters for establishing the smallest detectable errors for rejection were determined by analyses of error sources in ground control surveys, aerial photography, and aerotriangulation theory and operations. Some seldom considered theorectical and practical error sources in ground control surveys are discussed and resolved. The data rejection program chart is listed in the appendix
Authors:
Hou,Cheng-Yeh
Keywords:
aerial photography, Aerotriangulation, analysis, analysis and control, computer, control, data, detection, Error, error detection, Executive, program, survey
|
Hou,Cheng-Yeh | WA-RD 001 | Aerotriangulation Analysis and Control Point Error Detection | 1972 |
Abstract:
A major problem faced by personnel responsible for manipulating aerotriangulation data through transformation and adjustment programs in an electronic computer is that of isolating and detecting blunders and other erroneous data. This study created an automated data analysis and rejection program to reduce the turn around time from initial entry to certification of the final adjustment. Parameters for establishing the smallest detectable errors for rejection were determined by analyses of error sources in ground control surveys, aerial photography, and aerotriangulation theory and operations. Some seldom considered theorectical and practical error sources in ground control surveys are discussed and resolved. The data rejection program chart is listed in the appendix.
Authors:
Hou,Cheng-Yeh
Keywords:
aerial photography, analysis, computer, control, data, detection, error detection, program, Standard error, solar altitude, linear transformation, strip adjustment, aerotriangulation, deflection of vertical, refraction in precise leveling, second term, double summation, image motion, film distortion, flight height, survey
A major problem faced by personnel responsible for manipulating aerotriangulation data through transformation and adjustment programs in an electronic computer is that of isolating and detecting blunders and other erroneous data. This study created an automated data analysis and rejection program to reduce the turn around time from initial entry to certification of the final adjustment. Parameters for establishing the smallest detectable errors for rejection were determined by analyses of error sources in ground control surveys, aerial photography, and aerotriangulation theory and operations. Some seldom considered theorectical and practical error sources in ground control surveys are discussed and resolved. The data rejection program chart is listed in the appendix.
Authors:
Hou,Cheng-Yeh
Keywords:
aerial photography, analysis, computer, control, data, detection, error detection, program, Standard error, solar altitude, linear transformation, strip adjustment, aerotriangulation, deflection of vertical, refraction in precise leveling, second term, double summation, image motion, film distortion, flight height, survey
|
Krukar,M. | WA-RD 015.5 | Pavement Research At WSU Volume No. 5 - Evaluation and Analysis of Results From Experimental Rings No. 1-4 1020 | 1971 |
Abstract:
The purpose of this study was threefold: (1) Develop empirical equivalencies from all four rings, (2) develop a design method for overlays based on field deflections; and (3) evaluate the validity of data obtained from instrumentations in terms of n-layer elastic theory and then develop theoretical equivalencies.This was done. Field equivalencies were developed and they indicated that superiority of the treated base materials over the untreated. A design method was developed which could be used for predicting when an overlay was needed and what thickness was needed to withstand certain equivalent wheel loads and deflections.Using computer programs for n-layer elastic theory developed by Chevron Research Company, deflection stresses and strains were computed and compared with field data. Assumptions about the material behavior and condition were made based on laboratory data obtained from The Asphalt Institute and field knowledge, and were used to help predict the behavior of pavements. The results were encouraging and indicate that field measurements generally were comparable with elastic layer theory predictions. This will help to develop and modify existing design limits for stresses, strains and deflection for future work.Equivalencies based on theoretical deflections, stresses and strains indicate the difficulty of assigning precise values. These values also indicate the superiority of treated materials over the untreated materials.
Authors:
Krukar,M., Cook,J. C.
Keywords:
analysis, asphalt, base, base materials, behavior, computer, computer program, condition, data, design, equivalencies, evaluation, experimental, loads, materials, overlay, overlays, pavement, pavements, prediction, program, research, strains, stresses, volume, wheel load
The purpose of this study was threefold: (1) Develop empirical equivalencies from all four rings, (2) develop a design method for overlays based on field deflections; and (3) evaluate the validity of data obtained from instrumentations in terms of n-layer elastic theory and then develop theoretical equivalencies.This was done. Field equivalencies were developed and they indicated that superiority of the treated base materials over the untreated. A design method was developed which could be used for predicting when an overlay was needed and what thickness was needed to withstand certain equivalent wheel loads and deflections.Using computer programs for n-layer elastic theory developed by Chevron Research Company, deflection stresses and strains were computed and compared with field data. Assumptions about the material behavior and condition were made based on laboratory data obtained from The Asphalt Institute and field knowledge, and were used to help predict the behavior of pavements. The results were encouraging and indicate that field measurements generally were comparable with elastic layer theory predictions. This will help to develop and modify existing design limits for stresses, strains and deflection for future work.Equivalencies based on theoretical deflections, stresses and strains indicate the difficulty of assigning precise values. These values also indicate the superiority of treated materials over the untreated materials.
Authors:
Krukar,M., Cook,J. C.
Keywords:
analysis, asphalt, base, base materials, behavior, computer, computer program, condition, data, design, equivalencies, evaluation, experimental, loads, materials, overlay, overlays, pavement, pavements, prediction, program, research, strains, stresses, volume, wheel load
|
Karlfritz,L. | WA-RD 011.1 | Weekend And Recreational Development Of A New Concept 1021 | 1971 |
Abstract:
The ProblemThe growth of population in metropolitan areas and the increasing affluence and leisure time of that population is exerting ever-increasing pressure on recreational resources and the transportation facilitiesconnecting the metropolitan areas with the recreation areas. Historically, travel for recreational purposes has grown more rapidly than that for other purposes and if forecasted increases in real income andleisure time materialize this trend will continue. There is increasing concern that proper attention has not been given to recreational travel as a factor in transportation planning either at the state or urban area level. Recreational travel occurs primarily on weekends and holidays whereas the urban transportation studies, almost without exception, are concerned with weekday travel. Recreational travel serves both as a means to an end and as an end in itself. Access to a variety of recreational activities is an importanthuman need and is presumed to be an agreed-upon objective of-public policy. In addition travel has an intrinsic recreational value, the extent of which depends on place and circumstances. This study proposes a concept far long-range planning of transportation facilities needed to serve the weekend travel demands of a metropolitan area. The planning concept is proposed as a means of achieving more effective utilization of resources in providing for recreational needs. Where data have been used in this study to support conclusions, they have been extracted from surveys conducted by agencies in the state of Washington and from selected studies undertaken elsewhere. Despite the limited availability of certain data, the method of analysis and the planning process presented in this report are considered to have general applicability.
Authors:
Karlfritz,L.
Keywords:
agencies, analysis, availability, data, demand, development, facilities, planning, policy, population, pressure, recreation, Recreational travel, survey, Surveys, transportation, transportation planning, travel, urban, Washington
The ProblemThe growth of population in metropolitan areas and the increasing affluence and leisure time of that population is exerting ever-increasing pressure on recreational resources and the transportation facilitiesconnecting the metropolitan areas with the recreation areas. Historically, travel for recreational purposes has grown more rapidly than that for other purposes and if forecasted increases in real income andleisure time materialize this trend will continue. There is increasing concern that proper attention has not been given to recreational travel as a factor in transportation planning either at the state or urban area level. Recreational travel occurs primarily on weekends and holidays whereas the urban transportation studies, almost without exception, are concerned with weekday travel. Recreational travel serves both as a means to an end and as an end in itself. Access to a variety of recreational activities is an importanthuman need and is presumed to be an agreed-upon objective of-public policy. In addition travel has an intrinsic recreational value, the extent of which depends on place and circumstances. This study proposes a concept far long-range planning of transportation facilities needed to serve the weekend travel demands of a metropolitan area. The planning concept is proposed as a means of achieving more effective utilization of resources in providing for recreational needs. Where data have been used in this study to support conclusions, they have been extracted from surveys conducted by agencies in the state of Washington and from selected studies undertaken elsewhere. Despite the limited availability of certain data, the method of analysis and the planning process presented in this report are considered to have general applicability.
Authors:
Karlfritz,L.
Keywords:
agencies, analysis, availability, data, demand, development, facilities, planning, policy, population, pressure, recreation, Recreational travel, survey, Surveys, transportation, transportation planning, travel, urban, Washington
|
Previous | Next |
Search
Common Keywords:
- accident rates
- research
- Washington
- Washington state
- data
- pavement
- highway
- transportation
- design
- bridge
- performance
- construction
- evaluation
- program
- traffic
- condition
- traffic surveillance and control
- concrete
- analysis
- development
- WSDOT
- project
- control
- asphalt
- cost
- ITS
- System
- systems
- truck
- Study
- developed
- planning
- volume
- HOV
- survey
- Bridge and construction
- Transportation planning
- computer
- overlay
- environmental
- experimental
- earthquake
- pavement management
- tire
- management
- impact
- speed
- Highways
- maintenance
- materials
- asphalt concrete
- bridges
- tests
- marine
- impacts
- monitoring
- quality
- land use
- bridge deck
- noise
- seattle
- transit
- high occupancy vehicle
- fatigue
- costs
- incident management
- pavements
- methods
- highway runoff
- temperature
- roadway
- public
- snow
- policy
- agencies
- model
- ramp metering
- methodology
- reinforced concrete
- facilities
- overlays
- avalanche
- effectiveness
- prediction
- asphalt pavement
- benefit
- TRB
- behavior
- cracking
- Interim
- loads
- base
- data collection
- statistics
- pavement performance
- runoff
- models