TRAC Reports
To sort the reports, click on a heading: Authors, Report #, Report Title, Year, or Publisher.
To download a report's pdf or see the abstract, click on the report.
Search returned 40 reports containing keyword: 'System'
clear results
Previous |
Search
|
Next |
Authors |
Report # |
Report Title |
Year |
Publisher |
---|
Senn,L. | WA-RD 624.1 | Summary Report: Washington State Road Weather Information Systems | 2005 | TRAC/UW |
Abstract:
The Washington State Department of Transportation (WSDOT) has deployed advanced weather systems and products to support maintenance operations and to provide public information. The expanded system has tremendously improved the availability and quality of weather information for WSDOT crews and the traveling public. Use of current and forecast weather information has increased from nearly non-existent to an actively used, Department-wide resource. This summary report overviews the various efforts, products, and reports generated since the beginning of the road weather project.
Authors:
Senn,L.
Keywords:
availability, information systems, maintenance, public, public information, quality, Road Weather Information System, System, systems, transportation, Washington, Washington state, weather prediction, winter road maintenance, WSDOT
The Washington State Department of Transportation (WSDOT) has deployed advanced weather systems and products to support maintenance operations and to provide public information. The expanded system has tremendously improved the availability and quality of weather information for WSDOT crews and the traveling public. Use of current and forecast weather information has increased from nearly non-existent to an actively used, Department-wide resource. This summary report overviews the various efforts, products, and reports generated since the beginning of the road weather project.
Authors:
Senn,L.
Keywords:
availability, information systems, maintenance, public, public information, quality, Road Weather Information System, System, systems, transportation, Washington, Washington state, weather prediction, winter road maintenance, WSDOT
|
http://www.wsdot.wa.gov/research/reports/fullreports/624.1.pdf http://wsdot.wa.gov/Research/Reports/600/624.1.htm |
McCormack,E. D. | WA-RD 607.1 | Options for Benchmarking Performance Improvements Achieved from Construction of Freight Mobility Projects | 2005 | TRAC/UW |
Abstract:
This report documents the development of data collection methodologies that can be used to cost effectively measure truck movements along specific roadway corridors selected by transportation agencies in Washington State. The intent of this study was to design and test methodologies that could be used to measure the performance of freight mobility roadway improvement projects against benchmarks, or selected standards, that would be used both as part of the project selection process and to report on speed and volume improvements that resulted from completed freight mobility projects. One technology tested was Commercial Vehicle Information System and Networks (CVISN) electronic truck transponders, which are mounted on the windshields of approximately 20,000 trucks in Washington. By using software to link the transponder reads from sites anywhere in the state, the transponder-equipped trucks could become a travel-time probe fleet. The second technology tested involved global positioning systems (GPS) placed in volunteer trucks to collect specific truck movement data at 5-second intervals. With GPS data it was possible to understand when and where the monitored trucks experienced congestion and to generate useful performance statistics. The study found that both data collection technologies could be useful; however, the key to both technologies is whether enough instrumented vehicles pass over the roadways for which data are required. This basic condition affects whether the technologies will be effective at collecting the data required for any given benchmark project. The report also recommends the traffic data that should be collected for a benchmark program and the potential costs of using either data collection technology.
Authors:
McCormack,E. D., Hallenbeck,M. E.
Keywords:
agencies, commercial vehicle, condition, congestion, construction, corridors, cost, costs, data, data collection, design, development, freight, freight mobility, freight movement reliability, global positioning, global positioning systems, GPS, improvement, methodology, mobility, networks, performance, positioning, probe program, project, research, roadway, software, speed, statistics, Study, System, systems, technology, traffic, traffic data, transportation, travel time, truck, truck monitoring, trucks, volume, Washington, Washington state
This report documents the development of data collection methodologies that can be used to cost effectively measure truck movements along specific roadway corridors selected by transportation agencies in Washington State. The intent of this study was to design and test methodologies that could be used to measure the performance of freight mobility roadway improvement projects against benchmarks, or selected standards, that would be used both as part of the project selection process and to report on speed and volume improvements that resulted from completed freight mobility projects. One technology tested was Commercial Vehicle Information System and Networks (CVISN) electronic truck transponders, which are mounted on the windshields of approximately 20,000 trucks in Washington. By using software to link the transponder reads from sites anywhere in the state, the transponder-equipped trucks could become a travel-time probe fleet. The second technology tested involved global positioning systems (GPS) placed in volunteer trucks to collect specific truck movement data at 5-second intervals. With GPS data it was possible to understand when and where the monitored trucks experienced congestion and to generate useful performance statistics. The study found that both data collection technologies could be useful; however, the key to both technologies is whether enough instrumented vehicles pass over the roadways for which data are required. This basic condition affects whether the technologies will be effective at collecting the data required for any given benchmark project. The report also recommends the traffic data that should be collected for a benchmark program and the potential costs of using either data collection technology.
Authors:
McCormack,E. D., Hallenbeck,M. E.
Keywords:
agencies, commercial vehicle, condition, congestion, construction, corridors, cost, costs, data, data collection, design, development, freight, freight mobility, freight movement reliability, global positioning, global positioning systems, GPS, improvement, methodology, mobility, networks, performance, positioning, probe program, project, research, roadway, software, speed, statistics, Study, System, systems, technology, traffic, traffic data, transportation, travel time, truck, truck monitoring, trucks, volume, Washington, Washington state
|
http://www.wsdot.wa.gov/research/reports/fullreports/607.1.pdf http://wsdot.wa.gov/Research/Reports/600/607.1.htm |
Hieber,D. G. | WA-RD 611.1 | Precast Concrete Pier Systems for Rapid Construction of Bridges in Seismic Regions | 2005 | TRAC/UW |
Abstract:
Increasing traffic volumes and a deteriorating transportation infrastructure have stimulated the development of new systems and methods to accelerate the construction of highway bridges. Precast concrete bridge components offer a potential alternative to conventional reinforced, cast-in-place concrete components. The use of precast components has the potential to minimize traffic disruptions, improve work zone safety, reduce environmental impacts, improve constructability, increase quality, and lower life-cycle costs. This study compared two precast concrete bridge pier systems for rapid construction of bridges in seismic regions. One was a reinforced concrete system, in which mild steel deformed bars connect the precast concrete components and provide the flexural strength of the columns. The other was a hybrid system, which uses a combination of unbonded post-tensioning and mild steel deformed bars to make the connections. A parametric study of the two types of systems was conducted using nonlinear finite element models to investigate the global response and likelihood of damage for various frame configurations. On the basis of this study, a practical method was developed to estimate maximum seismic displacements from the cracked section properties of the columns, the elastic design displacement response spectrum, and the base-shear strength ratio. The results of the global nonlinear finite element analyses suggest that the systems have the potential for good seismic performance. Further analytical and experimental research is needed to investigate the constructability and seismic performance of the connection details.
Authors:
Hieber,D. G., Wacker,J. M., Eberhard,M. O., Stanton,J. F.
Keywords:
Alternative, bridge, bridges, columns, concrete, concrete bridge, connections, constructability, construction, cost, costs, damage, design, developed, development, environmental, environmental impact experimental, finite element, highway, impact, impacts, infrastructure, methods, models, performance piers, precast, precast concrete, prestressed concete, quality, Rapid construction, Regions, reinforce concrete, research, response spectra, response spectrum, safety, seismic, seismic performance, steel strength, Study, substructures, System, systems, traffic, traffic volumes, trasportation, volume
Increasing traffic volumes and a deteriorating transportation infrastructure have stimulated the development of new systems and methods to accelerate the construction of highway bridges. Precast concrete bridge components offer a potential alternative to conventional reinforced, cast-in-place concrete components. The use of precast components has the potential to minimize traffic disruptions, improve work zone safety, reduce environmental impacts, improve constructability, increase quality, and lower life-cycle costs. This study compared two precast concrete bridge pier systems for rapid construction of bridges in seismic regions. One was a reinforced concrete system, in which mild steel deformed bars connect the precast concrete components and provide the flexural strength of the columns. The other was a hybrid system, which uses a combination of unbonded post-tensioning and mild steel deformed bars to make the connections. A parametric study of the two types of systems was conducted using nonlinear finite element models to investigate the global response and likelihood of damage for various frame configurations. On the basis of this study, a practical method was developed to estimate maximum seismic displacements from the cracked section properties of the columns, the elastic design displacement response spectrum, and the base-shear strength ratio. The results of the global nonlinear finite element analyses suggest that the systems have the potential for good seismic performance. Further analytical and experimental research is needed to investigate the constructability and seismic performance of the connection details.
Authors:
Hieber,D. G., Wacker,J. M., Eberhard,M. O., Stanton,J. F.
Keywords:
Alternative, bridge, bridges, columns, concrete, concrete bridge, connections, constructability, construction, cost, costs, damage, design, developed, development, environmental, environmental impact experimental, finite element, highway, impact, impacts, infrastructure, methods, models, performance piers, precast, precast concrete, prestressed concete, quality, Rapid construction, Regions, reinforce concrete, research, response spectra, response spectrum, safety, seismic, seismic performance, steel strength, Study, substructures, System, systems, traffic, traffic volumes, trasportation, volume
|
http://www.wsdot.wa.gov/research/reports/fullreports/611.1.pdf http://wsdot.wa.gov/Research/Reports/600/611.1.htm |
Kristof,T. | WA-RD 597.1 | Assessing the Benefits of Traveler and Transportation Information Systems | 2004 | TRAC/UW |
Abstract:
The goal of advanced traveler information systems (ATIS) is to provide travelers with information that will facilitate their decisions concerning route choice, departure time, trip delay or elimination, and mode of transportation. The benefits of ATIS projects can be evaluated through field studies, simulation software, and surveys. An evaluation method called the ITS Deployment Analysis System (IDAS) is suggested for use by the Washington State Department of Transportation (WSDOT). IDAS is a "sketch" planning tool intended for screening and prioritizing all intelligent transportation systems (ITS) projects (not just ATIS projects). The software evaluates a number of benefits. These are determined by changes attributable to the deployment of ITS in vehicle miles traveled (VMT), vehicle hours traveled (VHT), volume-capacity (v/c) ratios, and vehicle speeds throughout a given network. The IDAS evaluation depends on a number of assumptions that affect the calculations of costs and benefits. The IDAS developers recommend that these assumptions be inspected by local agencies and adjusted to better represent local conditions. The assumptions about the impacts on VMT, VHT, v/c ratios, and vehicle speed are particularly important. Consequently, suggestions are made within this report for adjustments that WSDOT should make to these default values. These values will allow the WSDOT to successfully employ IDAS for ATIS evaluation.
Authors:
Kristof,T., Lowry,M., Rutherford,G. S.
Keywords:
advanced traveler information systems, agencies, analysis, Assessing, ATIS, ATIS benefits, ATIS evaluation, benefit, benefits, condition, cost, costs, Deployment, evaluation, IDAS, impact, impacts, information systems, Intelligent transportation system, intelligent transportation systems, ITS, ITS Deployment Analysis System, planning, prioritizing, project, research, software, speed, Study, survey, Surveys, System, systems, transportation, traveler information, Washington, Washington state, WSDOT
The goal of advanced traveler information systems (ATIS) is to provide travelers with information that will facilitate their decisions concerning route choice, departure time, trip delay or elimination, and mode of transportation. The benefits of ATIS projects can be evaluated through field studies, simulation software, and surveys. An evaluation method called the ITS Deployment Analysis System (IDAS) is suggested for use by the Washington State Department of Transportation (WSDOT). IDAS is a "sketch" planning tool intended for screening and prioritizing all intelligent transportation systems (ITS) projects (not just ATIS projects). The software evaluates a number of benefits. These are determined by changes attributable to the deployment of ITS in vehicle miles traveled (VMT), vehicle hours traveled (VHT), volume-capacity (v/c) ratios, and vehicle speeds throughout a given network. The IDAS evaluation depends on a number of assumptions that affect the calculations of costs and benefits. The IDAS developers recommend that these assumptions be inspected by local agencies and adjusted to better represent local conditions. The assumptions about the impacts on VMT, VHT, v/c ratios, and vehicle speed are particularly important. Consequently, suggestions are made within this report for adjustments that WSDOT should make to these default values. These values will allow the WSDOT to successfully employ IDAS for ATIS evaluation.
Authors:
Kristof,T., Lowry,M., Rutherford,G. S.
Keywords:
advanced traveler information systems, agencies, analysis, Assessing, ATIS, ATIS benefits, ATIS evaluation, benefit, benefits, condition, cost, costs, Deployment, evaluation, IDAS, impact, impacts, information systems, Intelligent transportation system, intelligent transportation systems, ITS, ITS Deployment Analysis System, planning, prioritizing, project, research, software, speed, Study, survey, Surveys, System, systems, transportation, traveler information, Washington, Washington state, WSDOT
|
http://www.wsdot.wa.gov/research/reports/fullreports/597.1.pdf http://wsdot.wa.gov/Research/Reports/500/597.1.htm |
Baker,M. J. | WA-RD 437.1 | Identification And Assessment Of Superior And Inferior Performing WSDOT Pavements | 2000 |
Abstract:
The Washington State Pavement Management System (WSPMS) offers an organized methodology that WSDOT decision makers use to determine optimum strategies for providing and maintaining pavements in a serviceable condition over a given period of time. It also helps improve decision-making efficiency, provide feedback on the consequences of decisions, and ensure the consistency of decisions made at different management levels within WSDOT. Unfortunately, it is not possible, by simply scanning the WSPMS, to pinpoint reasons why pavement sections made of the same general surface materials and subjected to similar traffic and climatic conditions differ in performance. What the WSPMS can do is assist engineers in developing a candidate list of pavement sections with superior and inferior performance. Common characteristics that linkmultiple pavement sections are of particular interest, in part because they may reflect a common practice(e-g., nighttime construction) that leads to superior or inferior performance.This study undertook various extensive analyses and comparisons to help illustrate common attributes of Washington state pavements with superior and inferior performance. The research also reviewed field performance data for Interstate 90 within the 1999 version of the WSPMS. The purpose was to examine all pavement segments on the 480 km of Interstate 90 within Washington state.Reducing variability will allow WSDOT to produce more consistent pavement performance and will allow increasingly effective planning and forecasting. An almost certain byproduct of this increased planning effectiveness will be a more efficient allocation of available funding.
Authors:
Baker,M. J., Mahoney,J. P.
Keywords:
Assessment, condition, construction, data, effectiveness, forecasting, management, management system, materials, methodology, pavement, pavement management, pavement performance, pavement section, pavements, performance, planning, research, superior inferior, System, traffic, Washington, Washington state, WSDOT
The Washington State Pavement Management System (WSPMS) offers an organized methodology that WSDOT decision makers use to determine optimum strategies for providing and maintaining pavements in a serviceable condition over a given period of time. It also helps improve decision-making efficiency, provide feedback on the consequences of decisions, and ensure the consistency of decisions made at different management levels within WSDOT. Unfortunately, it is not possible, by simply scanning the WSPMS, to pinpoint reasons why pavement sections made of the same general surface materials and subjected to similar traffic and climatic conditions differ in performance. What the WSPMS can do is assist engineers in developing a candidate list of pavement sections with superior and inferior performance. Common characteristics that linkmultiple pavement sections are of particular interest, in part because they may reflect a common practice(e-g., nighttime construction) that leads to superior or inferior performance.This study undertook various extensive analyses and comparisons to help illustrate common attributes of Washington state pavements with superior and inferior performance. The research also reviewed field performance data for Interstate 90 within the 1999 version of the WSPMS. The purpose was to examine all pavement segments on the 480 km of Interstate 90 within Washington state.Reducing variability will allow WSDOT to produce more consistent pavement performance and will allow increasingly effective planning and forecasting. An almost certain byproduct of this increased planning effectiveness will be a more efficient allocation of available funding.
Authors:
Baker,M. J., Mahoney,J. P.
Keywords:
Assessment, condition, construction, data, effectiveness, forecasting, management, management system, materials, methodology, pavement, pavement management, pavement performance, pavement section, pavements, performance, planning, research, superior inferior, System, traffic, Washington, Washington state, WSDOT
|
Wetherby,B. | WA-RD 462.6 | SWIFT - Evaluation Summary | 1999 |
Abstract:
The SWIFT (Seattle Wide-area for Travelers) project was a field operational test of a wide area ITS communications system using a flexible FM sub-carrier High Speed Data System (HSDS). The test was conducted in a partnership with WSDOT, King County Metro Transit, Delco Electronics, Inc., IBM, Seiko Communications Systems, Metro Traffic Control and the Federal Highway Administration. Three devices were used, by the public, to receive the traveler a Delco car radio (capable of providing vector navigation in addition to personal paging and the messages); a Seiko wrist watch pager; and a portable computer (capable of providing graphic displays of traffic advisories and bus positions). After the 15-month test, interviews with the 600 Seattle commuters/participants were conducted to assess user acceptance. A communications study evaluated the adequacy of the HSDS system to disseminate traveler information. Architecture study assessed the effectiveness of the various components to carry out SWIFT operations. institutional issues study documented the history of the project and assessed the institutional issues confronted. A deployment cost study investigated the cost of deployment of a SWIFT system and assessment of potential profitability. The first five reports in this series detail individual aspects of the project.
Authors:
Wetherby,B., Perez,W.
Keywords:
Acceptance, Assessment, bus, computer, control, cost, counties, data, Deployment, effectiveness, evaluation, highway, Institutional, interviews, Issues, ITS, Miscellaneous Library, paging, portable computer, project, public, seattle, speed, Study, SWIFT, System, systems, traffic, traffic advisories, traffic control, transit, traveler information, WSDOT
The SWIFT (Seattle Wide-area for Travelers) project was a field operational test of a wide area ITS communications system using a flexible FM sub-carrier High Speed Data System (HSDS). The test was conducted in a partnership with WSDOT, King County Metro Transit, Delco Electronics, Inc., IBM, Seiko Communications Systems, Metro Traffic Control and the Federal Highway Administration. Three devices were used, by the public, to receive the traveler a Delco car radio (capable of providing vector navigation in addition to personal paging and the messages); a Seiko wrist watch pager; and a portable computer (capable of providing graphic displays of traffic advisories and bus positions). After the 15-month test, interviews with the 600 Seattle commuters/participants were conducted to assess user acceptance. A communications study evaluated the adequacy of the HSDS system to disseminate traveler information. Architecture study assessed the effectiveness of the various components to carry out SWIFT operations. institutional issues study documented the history of the project and assessed the institutional issues confronted. A deployment cost study investigated the cost of deployment of a SWIFT system and assessment of potential profitability. The first five reports in this series detail individual aspects of the project.
Authors:
Wetherby,B., Perez,W.
Keywords:
Acceptance, Assessment, bus, computer, control, cost, counties, data, Deployment, effectiveness, evaluation, highway, Institutional, interviews, Issues, ITS, Miscellaneous Library, paging, portable computer, project, public, seattle, speed, Study, SWIFT, System, systems, traffic, traffic advisories, traffic control, transit, traveler information, WSDOT
|
Wetherby,B. | WA-RD 462.4 | SWIFT - Institutional Issues | 1998 |
Abstract:
The Seattle Wide-area Information for Travelers (SWIFT) project was a highly successful Intelligent Transportation System (ITS) Field Operational Test (FOT) that was conducted over a four-year period from 1993 to 1997. The purpose of the project was to test the efficacy of a High Speed Data System (HSDS), or FM Sub-carrier, to disseminate incident, bus and speed congestion information via three different end-user devices: pager watch, portable computer and in-vehicle navigation device. Six hundred ninety (690) commuters, many with route- or mode-choice options, participated in the FOT and provided user-acceptance evaluations. Other evaluation components examined the system architecture, communications coverage, deployment cost and institutional issues that affected the project.The primary purpose of the SWIFT Institutional Issues Study evaluation was to collect information regarding the institutional issues (e.g., policies, jurisdictional issues, internal and external factors) that affected design, development, testing, deployment and conduct of the SWIFT Field Operational Test (FOT); determine how these issues were overcome and what lessons could be learned. A secondary purpose of the evaluation was to document the history of the SWIFT project.The methodology for the SWIFT Institutional Issues Study consisted of two sets of questionnairesand two sets of semi-structured interviews that were conducted with fourteen (14) SWIFT team memberrepresentatives at two different points during the conduct of the SWIFT FOT: about midway through the conduct of the test and after the test was completed. All SWIFT team member responses were independently collected and SWIFT institutional issues were primarily identified by determining which topics were addressed by two or more individuals. Historical information was collected from various sources throughout the project.SWIFT represents one of the first ATIS FOTs conducted in this country. Earlier tests were conducted in Orlando, FL (TravTek) and Minneapolis St. Paul (Genesis) among others, yet the SWIFT FOT appears to have extended considerably the available database of information regarding ATIS effectiveness and acceptance. The addition of real-time bus information, in particular, has set the SWIFT FOT apart from others already conducted.One of the significant aspects of the SWIFT teaming agreement was the long-term interest in ITS and commitment of the organizations involved. For instance, the majority of the SWIFT team members articulated a long-term interest in ITS deployments. In addition, three organizations-Seiko, Etak and Metro Traffic Control-+ommitted themselves to fielding a \"SWIFT-like\" system after the project was completed. This degree of interest and commitment resulted in all of the SWIFT team members working together in a very effective, cooperative fashion throughout the FOT.A critical organizational structure that was instituted to implement SWIFT was the weeklyteleconference. This simple, yet cost-effective method of managing and discussing the technicalissues involved with the project was attributed by many of the SWIFT team members to aprimary instrument of the project\'s success. In particular, the SWIFT teleconferences enabledthe representatives of each organization to keep abreast of the developmental status of theproject, to brainstorm solutions to encountered problems and to develop scheduling sense.
Authors:
Wetherby,B.
Keywords:
ATIS, bus, computer, congestion, congestion information, cost, data, database, design, development, effectiveness, evaluation, incident, Institutional, Intelligent transportation system, interviews, Issues, ITS, methodology, mode choice, policy, portable computer, project, scheduling, seattle, speed, SWIFT, System, tests, traffic, transportation
The Seattle Wide-area Information for Travelers (SWIFT) project was a highly successful Intelligent Transportation System (ITS) Field Operational Test (FOT) that was conducted over a four-year period from 1993 to 1997. The purpose of the project was to test the efficacy of a High Speed Data System (HSDS), or FM Sub-carrier, to disseminate incident, bus and speed congestion information via three different end-user devices: pager watch, portable computer and in-vehicle navigation device. Six hundred ninety (690) commuters, many with route- or mode-choice options, participated in the FOT and provided user-acceptance evaluations. Other evaluation components examined the system architecture, communications coverage, deployment cost and institutional issues that affected the project.The primary purpose of the SWIFT Institutional Issues Study evaluation was to collect information regarding the institutional issues (e.g., policies, jurisdictional issues, internal and external factors) that affected design, development, testing, deployment and conduct of the SWIFT Field Operational Test (FOT); determine how these issues were overcome and what lessons could be learned. A secondary purpose of the evaluation was to document the history of the SWIFT project.The methodology for the SWIFT Institutional Issues Study consisted of two sets of questionnairesand two sets of semi-structured interviews that were conducted with fourteen (14) SWIFT team memberrepresentatives at two different points during the conduct of the SWIFT FOT: about midway through the conduct of the test and after the test was completed. All SWIFT team member responses were independently collected and SWIFT institutional issues were primarily identified by determining which topics were addressed by two or more individuals. Historical information was collected from various sources throughout the project.SWIFT represents one of the first ATIS FOTs conducted in this country. Earlier tests were conducted in Orlando, FL (TravTek) and Minneapolis St. Paul (Genesis) among others, yet the SWIFT FOT appears to have extended considerably the available database of information regarding ATIS effectiveness and acceptance. The addition of real-time bus information, in particular, has set the SWIFT FOT apart from others already conducted.One of the significant aspects of the SWIFT teaming agreement was the long-term interest in ITS and commitment of the organizations involved. For instance, the majority of the SWIFT team members articulated a long-term interest in ITS deployments. In addition, three organizations-Seiko, Etak and Metro Traffic Control-+ommitted themselves to fielding a \"SWIFT-like\" system after the project was completed. This degree of interest and commitment resulted in all of the SWIFT team members working together in a very effective, cooperative fashion throughout the FOT.A critical organizational structure that was instituted to implement SWIFT was the weeklyteleconference. This simple, yet cost-effective method of managing and discussing the technicalissues involved with the project was attributed by many of the SWIFT team members to aprimary instrument of the project\'s success. In particular, the SWIFT teleconferences enabledthe representatives of each organization to keep abreast of the developmental status of theproject, to brainstorm solutions to encountered problems and to develop scheduling sense.
Authors:
Wetherby,B.
Keywords:
ATIS, bus, computer, congestion, congestion information, cost, data, database, design, development, effectiveness, evaluation, incident, Institutional, Intelligent transportation system, interviews, Issues, ITS, methodology, mode choice, policy, portable computer, project, scheduling, seattle, speed, SWIFT, System, tests, traffic, transportation
|
Trombly,J. | WA-RD 462.2 | SWIFT - Consumer Acceptance Study | 1998 |
Abstract:
The Seattle Wide-area Information for Travelers (SWIFT) Operational Test was intended to evaluate the performance of a large-scale, urban Advanced Traveler Information System (ATIS) deployment in the Seattle area. With the majority the SWIFT system completed by June 30,1996, the SWIFT Field Operational Test (FOT) evaluation was conducted from July 1, 1996 through September 20, 1997. The unique features of the SWIFT ATIS included the provision of information for multiple transportation modes, the delivery of this information using three different devices and the use of FM sideband as the primary communications medium. A total of 690 system users were recruited during the course of the study, including 520 Seiko Message watch users, 90 users of the Delco in-vehicle-navigation device and 80 users of the SWIFT portable computers.Purpose of Test. The SWIFT Consumer Acceptance Study was one of five component studies to the overall system evaluation. This report details the findings for the SWIFT Consumer Acceptance Study based on the evaluation objectives that were identified in the SWIFT Evaluation Plan (1 995). The primary objectives of the SWIFT Consumer Acceptance Study were to assess the following:Importance of traveler information in travel planningUsefulness of SWIFT traveler information in travel planningMinimum set of user services and device features required to provide viable productand servicesUser perceptions of SWIFT device usefulnessWillingness-to-pay for different services.User perceptions of changes in travel convenience and efficiencyUser perceptions of changes in traffic congestion, air quality, energy consumption,and safety.Additional SWIFT Consumer Acceptance Study objectives, conducted in support of the SWIFTArchitecture Study, were to assess the following:SWIFT system reliability from a user perspectiveSWIFT system availability from a user perspective.Methods. A variety of data-collection efforts were completed, including questionnaires, focus groups and telephone interviews. The questionnaires contained items that addressed objectives set out in the evaluation plan. The focus groups were conducted with small groups of users to obtain qualitative impressions from a smaller subset of users who were encouraged to speak openly and share their perceptions with other users. The SWIFT Consumer Acceptance Study focused on measurement and analysis of user perceptions toward SWIFT system usefulness and performance. No attempt was made to quantify the system level impacts of SWIFT services on congestion, air quality, energy consumption or safety in the Seattle region. Rather, the assessment of system-level transportation impacts was limited to examining subjective data (e.g., traveler's perceptions) collected from users and determining whether these perceptions were consistent with a benefit.Perceptions of Importance of Traveler In formationResults indicated that SWIFT users tended to place a high degree of importance on incident and congestion-related information in travel planning. Incident location and duration information was rated quite high in importance along with general traffic congestion information. For the group as a whole, information concerning bus schedule and route information and bus-location information was rated very low in importance, although these ratings were much higher in those users that actually used the bus. This was consistent with the automobile dependence reported by the group, and suggests that information concerning non-automobile options would not be used by the automobile-dependent group. Since users of the SWIFT portable computer were recruited from among transit users, this group generally rated transit information higher than other device users groups. However, the importance of this information was not as high as congestion and incident-related information. Receipt of various general-information messages was not rated very high in importance by questionnaire respondents, with the exception of weather, sports and news items. Most SWIFT respondents indicated that the receipt of financial and other environmental information was not important. Of course, from a transportation-impact point of view, the receipt of these general information messages was inconsequential. However, if device users were attracted by thesemessages it may make such services commercially viable to augment any potential benefitperceived by users through the receipt of travel-related information.Perceptions of S WIFT Traveler In formation UsefulnessUsers tended to view the messages they received from the SWIFT systems as accurate, reliable,timely, easy to understand and useful. Among device types, respondents representing users of the Seiko Message Watch expressed concern with the timeliness of incident-related messages. In addition, these respondents tended to rate ease of understanding lower than other user groups. Users of the Delco in-vehicle-navigation devices and SWIFT portable computers experienced problems in receiving personal-paging messages and these problems were reflected in respondent ratings. The map-based display provided by the SWIFT portable computer resulted in generally higher ratings for this device over other devices in understanding incident location and the nature of congestion. Seiko Message Watch users reported difficulty in understanding the extent of expected delay as well as the nature of congestion, while Delco in-vehicle-navigation device respondents reported difficulty in understanding the period of time for which a message applied. Generally speaking, SWIFT participants endorsed a wide-range of improvements to messages provided by the SWIFT system. Most seemed to consider the operational test as a suggestion of what might be possible, rather than a demonstration of a final product. Among Seiko Message Watch users, respondents expressed a desire for improved timeliness of messages as atop priority.
Authors:
Trombly,J., Wetherby,B., Dixson,A.
Keywords:
Acceptance, air quality, analysis, Assessment, ATIS, availability, bus, computer, congestion, congestion information, Consumer, data, data collection, Energy, environmental, evaluation, group, impact, impacts, improvement, incident, interviews, Miscellaneous Library, objectives, performance, planning, portable computer, quality, reliability, safety, seattle, Study, SWIFT, System, systems, traffic, traffic congestion, transit, transportation, travel, traveler information, urban
The Seattle Wide-area Information for Travelers (SWIFT) Operational Test was intended to evaluate the performance of a large-scale, urban Advanced Traveler Information System (ATIS) deployment in the Seattle area. With the majority the SWIFT system completed by June 30,1996, the SWIFT Field Operational Test (FOT) evaluation was conducted from July 1, 1996 through September 20, 1997. The unique features of the SWIFT ATIS included the provision of information for multiple transportation modes, the delivery of this information using three different devices and the use of FM sideband as the primary communications medium. A total of 690 system users were recruited during the course of the study, including 520 Seiko Message watch users, 90 users of the Delco in-vehicle-navigation device and 80 users of the SWIFT portable computers.Purpose of Test. The SWIFT Consumer Acceptance Study was one of five component studies to the overall system evaluation. This report details the findings for the SWIFT Consumer Acceptance Study based on the evaluation objectives that were identified in the SWIFT Evaluation Plan (1 995). The primary objectives of the SWIFT Consumer Acceptance Study were to assess the following:Importance of traveler information in travel planningUsefulness of SWIFT traveler information in travel planningMinimum set of user services and device features required to provide viable productand servicesUser perceptions of SWIFT device usefulnessWillingness-to-pay for different services.User perceptions of changes in travel convenience and efficiencyUser perceptions of changes in traffic congestion, air quality, energy consumption,and safety.Additional SWIFT Consumer Acceptance Study objectives, conducted in support of the SWIFTArchitecture Study, were to assess the following:SWIFT system reliability from a user perspectiveSWIFT system availability from a user perspective.Methods. A variety of data-collection efforts were completed, including questionnaires, focus groups and telephone interviews. The questionnaires contained items that addressed objectives set out in the evaluation plan. The focus groups were conducted with small groups of users to obtain qualitative impressions from a smaller subset of users who were encouraged to speak openly and share their perceptions with other users. The SWIFT Consumer Acceptance Study focused on measurement and analysis of user perceptions toward SWIFT system usefulness and performance. No attempt was made to quantify the system level impacts of SWIFT services on congestion, air quality, energy consumption or safety in the Seattle region. Rather, the assessment of system-level transportation impacts was limited to examining subjective data (e.g., traveler's perceptions) collected from users and determining whether these perceptions were consistent with a benefit.Perceptions of Importance of Traveler In formationResults indicated that SWIFT users tended to place a high degree of importance on incident and congestion-related information in travel planning. Incident location and duration information was rated quite high in importance along with general traffic congestion information. For the group as a whole, information concerning bus schedule and route information and bus-location information was rated very low in importance, although these ratings were much higher in those users that actually used the bus. This was consistent with the automobile dependence reported by the group, and suggests that information concerning non-automobile options would not be used by the automobile-dependent group. Since users of the SWIFT portable computer were recruited from among transit users, this group generally rated transit information higher than other device users groups. However, the importance of this information was not as high as congestion and incident-related information. Receipt of various general-information messages was not rated very high in importance by questionnaire respondents, with the exception of weather, sports and news items. Most SWIFT respondents indicated that the receipt of financial and other environmental information was not important. Of course, from a transportation-impact point of view, the receipt of these general information messages was inconsequential. However, if device users were attracted by thesemessages it may make such services commercially viable to augment any potential benefitperceived by users through the receipt of travel-related information.Perceptions of S WIFT Traveler In formation UsefulnessUsers tended to view the messages they received from the SWIFT systems as accurate, reliable,timely, easy to understand and useful. Among device types, respondents representing users of the Seiko Message Watch expressed concern with the timeliness of incident-related messages. In addition, these respondents tended to rate ease of understanding lower than other user groups. Users of the Delco in-vehicle-navigation devices and SWIFT portable computers experienced problems in receiving personal-paging messages and these problems were reflected in respondent ratings. The map-based display provided by the SWIFT portable computer resulted in generally higher ratings for this device over other devices in understanding incident location and the nature of congestion. Seiko Message Watch users reported difficulty in understanding the extent of expected delay as well as the nature of congestion, while Delco in-vehicle-navigation device respondents reported difficulty in understanding the period of time for which a message applied. Generally speaking, SWIFT participants endorsed a wide-range of improvements to messages provided by the SWIFT system. Most seemed to consider the operational test as a suggestion of what might be possible, rather than a demonstration of a final product. Among Seiko Message Watch users, respondents expressed a desire for improved timeliness of messages as atop priority.
Authors:
Trombly,J., Wetherby,B., Dixson,A.
Keywords:
Acceptance, air quality, analysis, Assessment, ATIS, availability, bus, computer, congestion, congestion information, Consumer, data, data collection, Energy, environmental, evaluation, group, impact, impacts, improvement, incident, interviews, Miscellaneous Library, objectives, performance, planning, portable computer, quality, reliability, safety, seattle, Study, SWIFT, System, systems, traffic, traffic congestion, transit, transportation, travel, traveler information, urban
|
Jensen,M. | WA-RD 462.3 | SWIFT - Deployment Cost Study | 1998 |
Abstract:
The Seattle Wide-area Information For Travelers (SWIFT) project was a highly successful Intelligent Transportation System (ITS) Field Operational Test (FOT) that was conducted over a four-year period from 1993 to 1997. The purpose of the project was to test the efficacy of a High Speed Data System (HSDS), or FM Sub-carrier, to disseminate incident, bus and speedlcongestion information via three different end-user devices: pager watch, portable computer and in-vehicle navigation device. Six hundred ninety (690) commuters, many with route- or mode-choice options, participated in the FOT and provided user-acceptance evaluations. Other evaluation components examined the system architecture, communications coverage, institutional issues, and consumer acceptance. The primary purpose of the SWIFT Deployment Cost Study was to provide an independent Life Cycle Cost Estimate (LCCE) of an operational and fully deployed SWIFT system. Moreover, it is intended to provide both the SWIFT participants and the FHWA with a measure of the commercial viability of \"SWIFT-like\" systems nationwide. Table ES- 1 shows the organizations that were included in the SWIFT Deployment Cost Study LCCE and commercial viability analysis.Table ES-1. Deployed SWIFT Participants (CostIRevenue Participants).Industry Government/InstitutionaISeiko Communications Systems, Inc. (SCS) King CountyMetro Networks University of WashingtonEtak, Inc.IBM (FOT Development Only)Delco Electronics (FOT Development Only)The methodology for the SWlFT Deployment Cost Study LCCE relied on standard proven costestimation and data collection and analysis techniques to provide cost estimates for each SWIFTparticipant shown above across the following three life-cycle phases:1) FOT development (costs of current SWIFT Test)King County Metro TransitUniversity of Washington (UW)2) Commercial Development (additional development and procurement costs for fullydeploying an operational SWIFT system (follows the completion of the SWIFT test)3) Annual Commercial Operations (annual operations costs for a fully deployed SWIFTsystem)A summary of the resulting life cycle cost estimate (LCCE) for the deployed SWIFT system ispresented in Table ES-2. Here, the FOT Development phase (based on SWIFT test actuals) wasestimated to cost $6.4 Million, the Commercial Development phase was estimated to cost $1.5Million, and the Annual Commercial Operations costs were estimated to be $0.8 Million.-- -SWIFT Deployment Cost Study I
Authors:
Jensen,M.
Keywords:
Acceptance, analysis, Annual, bus, computer, Consumer, cost, costs, counties, data, data collection, Deployment, development, evaluation, incident, Institutional, Intelligent transportation system, Issues, ITS, methodology, Miscellaneous Library, mode choice, networks, portable computer, project, seattle, speed, Study, SWIFT, System, systems, transportation, Washington
The Seattle Wide-area Information For Travelers (SWIFT) project was a highly successful Intelligent Transportation System (ITS) Field Operational Test (FOT) that was conducted over a four-year period from 1993 to 1997. The purpose of the project was to test the efficacy of a High Speed Data System (HSDS), or FM Sub-carrier, to disseminate incident, bus and speedlcongestion information via three different end-user devices: pager watch, portable computer and in-vehicle navigation device. Six hundred ninety (690) commuters, many with route- or mode-choice options, participated in the FOT and provided user-acceptance evaluations. Other evaluation components examined the system architecture, communications coverage, institutional issues, and consumer acceptance. The primary purpose of the SWIFT Deployment Cost Study was to provide an independent Life Cycle Cost Estimate (LCCE) of an operational and fully deployed SWIFT system. Moreover, it is intended to provide both the SWIFT participants and the FHWA with a measure of the commercial viability of \"SWIFT-like\" systems nationwide. Table ES- 1 shows the organizations that were included in the SWIFT Deployment Cost Study LCCE and commercial viability analysis.Table ES-1. Deployed SWIFT Participants (CostIRevenue Participants).Industry Government/InstitutionaISeiko Communications Systems, Inc. (SCS) King CountyMetro Networks University of WashingtonEtak, Inc.IBM (FOT Development Only)Delco Electronics (FOT Development Only)The methodology for the SWlFT Deployment Cost Study LCCE relied on standard proven costestimation and data collection and analysis techniques to provide cost estimates for each SWIFTparticipant shown above across the following three life-cycle phases:1) FOT development (costs of current SWIFT Test)King County Metro TransitUniversity of Washington (UW)2) Commercial Development (additional development and procurement costs for fullydeploying an operational SWIFT system (follows the completion of the SWIFT test)3) Annual Commercial Operations (annual operations costs for a fully deployed SWIFTsystem)A summary of the resulting life cycle cost estimate (LCCE) for the deployed SWIFT system ispresented in Table ES-2. Here, the FOT Development phase (based on SWIFT test actuals) wasestimated to cost $6.4 Million, the Commercial Development phase was estimated to cost $1.5Million, and the Annual Commercial Operations costs were estimated to be $0.8 Million.-- -SWIFT Deployment Cost Study I
Authors:
Jensen,M.
Keywords:
Acceptance, analysis, Annual, bus, computer, Consumer, cost, costs, counties, data, data collection, Deployment, development, evaluation, incident, Institutional, Intelligent transportation system, Issues, ITS, methodology, Miscellaneous Library, mode choice, networks, portable computer, project, seattle, speed, Study, SWIFT, System, systems, transportation, Washington
|
Weston,R. F. | WA-RD 364.2 | Washington Integrated Networked Geo-Based System (Wings) Implementation Plan | 1994 |
Abstract:
The purpose of this study is to provide the Washington State Department of Transportation, Aviation Division (WSDOT/AD) with the broad-based vision needed to apply new and emerging technology in geographic information systems (GIS) to aviation planning and reporting systems.The purpose of this study is to provide the Washington State Department of Transportation, Aviatior Division with the broad-based vision needed to apply new and emerging technology ir geographic information systems to aviation planning and systems. This is the second two reports. report documented the user needs, established data and application priorities, and presented a conceptual design for sharing geographic information pertaining to Washington\'s airports with airport sponsors, the Aviation Administration (FAA), and other WSDOT divisions. report provides an implementation plan. This report builds upon the conceptual design to provide a broad-based implementation plan. Three implementation activities are described in phases. Project organization and staffing requirements for policy, management, technical operations, and technical support are discussed in Section 3. Section 4 addresses the estimated resource requirements for WSDOT to make the implementation of WINGS a success. Included are requirements for personnel, data conversion from a manual to a computer-based system, and hardware. The of the report discusses issues and what next steps are required to begin the implementation of WINGS.
Authors:
Weston,R. F., Sandersen,J., Walker,L. A., Middleton,R.
Keywords:
airports, aviation, aviation planning, data, design, geographic information system, geographic information systems, GIS, implementation plan, information systems, management, manual, planning, policy, project, System, systems, technology, transportation, Washington, Washington state, WINGS, WSDOT
The purpose of this study is to provide the Washington State Department of Transportation, Aviation Division (WSDOT/AD) with the broad-based vision needed to apply new and emerging technology in geographic information systems (GIS) to aviation planning and reporting systems.The purpose of this study is to provide the Washington State Department of Transportation, Aviatior Division with the broad-based vision needed to apply new and emerging technology ir geographic information systems to aviation planning and systems. This is the second two reports. report documented the user needs, established data and application priorities, and presented a conceptual design for sharing geographic information pertaining to Washington\'s airports with airport sponsors, the Aviation Administration (FAA), and other WSDOT divisions. report provides an implementation plan. This report builds upon the conceptual design to provide a broad-based implementation plan. Three implementation activities are described in phases. Project organization and staffing requirements for policy, management, technical operations, and technical support are discussed in Section 3. Section 4 addresses the estimated resource requirements for WSDOT to make the implementation of WINGS a success. Included are requirements for personnel, data conversion from a manual to a computer-based system, and hardware. The of the report discusses issues and what next steps are required to begin the implementation of WINGS.
Authors:
Weston,R. F., Sandersen,J., Walker,L. A., Middleton,R.
Keywords:
airports, aviation, aviation planning, data, design, geographic information system, geographic information systems, GIS, implementation plan, information systems, management, manual, planning, policy, project, System, systems, technology, transportation, Washington, Washington state, WINGS, WSDOT
|
Dames & Moore- Inca Engineering | WA-RD 324.1 | Foundation-Soil Interaction Analysis of Bridges - Volumes I and II 478 | 1993 |
Abstract:
Dames & Moore And their subcontractor, Inco Engineers, have prepared this Manual of Practice for conducting bridge foundation-soil interaction analyses. The manual is intended to assist engineers in the Bridge Design office at the Washington State Department of Transportation (WSDOT) who perform dynamic analysis of bridge-foundation systems. The primary purpose of the manual is to present practical and accurate methods of estimating the foundation stiffness matrices for abutment or pier foundations supported on footings or piles. These matrices are needed for soil-structure interaction analysis to more accurately determine the seismic loads acting on the bridge superstructure and on the abutment and pier foundations.This Manual of Practice consists of two volumes. Volume I presents five bridge example problems:1. Coldwater Creek2. Deadwater Slough3. Ebey Slough4. Northup Way5. FHWAThe first four examples are actual WSDOT bridges and the fifth example is a fictitious bridge that appeared in a 1991 FHWA course notebook on seismic design of highway bridges.Volume II presents the input and output files of the SEISAB computer program for the dynamic soil-structure interaction analysis of bridges. The SEISAB computer program is currently used by WSDOT in the seismic design of Washington state bridges.Dames & Moore recommends the FHWA and Novak methods to estimate bridge foundation stiffness matrices. These methodologies are presented in detail in the Coldwater Creek example problem in Volume I. In this example, the basic theory and relevant equations or inputs for implementing these methodologies are provided first and are immediately followed by their application to the Coldwater Creek bridge. The appropriate equations or inputs from the FHWA and Novak methodologies presented not the Coldwater Creek example problem are identified and applied in the other four bridge example problems. Volume I also contains three appendices. The basis for the recommendation of the FHWA and Novak methods is provided in Appendix A, which is a reproduction of the 1992 Dames & Moore report to WSDOT on the evaluation of methods to estimate foundation stiffnesses. Appendix B consists of selected pages from the BMCOL 76 computer program user guide; this computer program, which computes the load-deflection and moment-rotation curves for single piles, is part of the FHWA methodology. Appendix C presents the method for transforming the foundation stiffness matrices from one coordinate system to another. This transformation process is important because the coordinate systems assumed in the FHWA and Novak methods are generally different and therefore are not necessarily the same as the SEISAB coordinate system. Coordinate transformations are also discussed in the ColdWater Creek example problem.
Authors:
Dames & Moore- Inca Engineering
Keywords:
analysis, bridge, bridge design, bridge foundation, bridges, computer, computer program, design, equations, evaluation, Foudation-Soil, foundation, foundation stiffness, highway, interaction, loads, manual, methodology, methods, piles, program, seismic, seismic design, soil-structure interaction, superstructure, System, systems, transportation, volume, Volumes I & II, Washington, Washington state, WSDOT
Dames & Moore And their subcontractor, Inco Engineers, have prepared this Manual of Practice for conducting bridge foundation-soil interaction analyses. The manual is intended to assist engineers in the Bridge Design office at the Washington State Department of Transportation (WSDOT) who perform dynamic analysis of bridge-foundation systems. The primary purpose of the manual is to present practical and accurate methods of estimating the foundation stiffness matrices for abutment or pier foundations supported on footings or piles. These matrices are needed for soil-structure interaction analysis to more accurately determine the seismic loads acting on the bridge superstructure and on the abutment and pier foundations.This Manual of Practice consists of two volumes. Volume I presents five bridge example problems:1. Coldwater Creek2. Deadwater Slough3. Ebey Slough4. Northup Way5. FHWAThe first four examples are actual WSDOT bridges and the fifth example is a fictitious bridge that appeared in a 1991 FHWA course notebook on seismic design of highway bridges.Volume II presents the input and output files of the SEISAB computer program for the dynamic soil-structure interaction analysis of bridges. The SEISAB computer program is currently used by WSDOT in the seismic design of Washington state bridges.Dames & Moore recommends the FHWA and Novak methods to estimate bridge foundation stiffness matrices. These methodologies are presented in detail in the Coldwater Creek example problem in Volume I. In this example, the basic theory and relevant equations or inputs for implementing these methodologies are provided first and are immediately followed by their application to the Coldwater Creek bridge. The appropriate equations or inputs from the FHWA and Novak methodologies presented not the Coldwater Creek example problem are identified and applied in the other four bridge example problems. Volume I also contains three appendices. The basis for the recommendation of the FHWA and Novak methods is provided in Appendix A, which is a reproduction of the 1992 Dames & Moore report to WSDOT on the evaluation of methods to estimate foundation stiffnesses. Appendix B consists of selected pages from the BMCOL 76 computer program user guide; this computer program, which computes the load-deflection and moment-rotation curves for single piles, is part of the FHWA methodology. Appendix C presents the method for transforming the foundation stiffness matrices from one coordinate system to another. This transformation process is important because the coordinate systems assumed in the FHWA and Novak methods are generally different and therefore are not necessarily the same as the SEISAB coordinate system. Coordinate transformations are also discussed in the ColdWater Creek example problem.
Authors:
Dames & Moore- Inca Engineering
Keywords:
analysis, bridge, bridge design, bridge foundation, bridges, computer, computer program, design, equations, evaluation, Foudation-Soil, foundation, foundation stiffness, highway, interaction, loads, manual, methodology, methods, piles, program, seismic, seismic design, soil-structure interaction, superstructure, System, systems, transportation, volume, Volumes I & II, Washington, Washington state, WSDOT
|
Telford,E. R. | WA-RD 087.1.1 | Cathodic Protection And Corrosion Monitoring Checkout 1405 SR 522 Woodinville Interchange | 1986 |
Abstract:
The cathodic protection on the 522 interchange near Woodinville, Washington was evaluated for proper operation. Three of the five zones on the bridge appeared to be cathodically protected. The current was increased in one of the unprotected zones to provide protection. The zone could not be fixed due to the nonfunctional nature of thermistors, reference electrode and structure cables. A recommendation was made to deactivate the entire system for a period of two weeks to allow for depolarization. Following depolarization, native state potential valves should be measured to establish a basis of comparison before activating the system. Monitoring on a three month interval for one year should be done to ensure that all problems have been solved.
Authors:
Telford,E. R., ETCO Engineering Services,Inc
Keywords:
bridge, cathodic protection, corrosion, monitoring, protection, System, Washington
The cathodic protection on the 522 interchange near Woodinville, Washington was evaluated for proper operation. Three of the five zones on the bridge appeared to be cathodically protected. The current was increased in one of the unprotected zones to provide protection. The zone could not be fixed due to the nonfunctional nature of thermistors, reference electrode and structure cables. A recommendation was made to deactivate the entire system for a period of two weeks to allow for depolarization. Following depolarization, native state potential valves should be measured to establish a basis of comparison before activating the system. Monitoring on a three month interval for one year should be done to ensure that all problems have been solved.
Authors:
Telford,E. R., ETCO Engineering Services,Inc
Keywords:
bridge, cathodic protection, corrosion, monitoring, protection, System, Washington
|
Telford,E. R. | WA-RD 087.2.1 | Cathodic Protection Checkout SR 24, Yakima River Bridge | 1986 |
Abstract:
The cathodic protection system on the Yakima River Bridge on SR-24 near Yakima was evaluated for proper operation. Three out of six reference electrodes and rebar probes were found to be non-functioning. One temperature sensing thermistor was also found to be non-functional. All three deck zones were found to be receiving the proper cathodic protection current. Recommendations were made to continue the monitoring at regular intervals and maintain the present rectifier settings.
Authors:
Telford,E. R., ETCO Engineering Services,Inc
Keywords:
bridge, cathodic protection, Deck, monitoring, probe, protection, System, temperature
The cathodic protection system on the Yakima River Bridge on SR-24 near Yakima was evaluated for proper operation. Three out of six reference electrodes and rebar probes were found to be non-functioning. One temperature sensing thermistor was also found to be non-functional. All three deck zones were found to be receiving the proper cathodic protection current. Recommendations were made to continue the monitoring at regular intervals and maintain the present rectifier settings.
Authors:
Telford,E. R., ETCO Engineering Services,Inc
Keywords:
bridge, cathodic protection, Deck, monitoring, probe, protection, System, temperature
|
Roper,T. H. | WA-RD 087.1 | Cathodic Protection For Reinforced Concrete Bridge Decks - Woodinville Interchange, Post Construction Report | 1986 |
Abstract:
Under FHWA Demonstration Project No. 34, \"Cathodic Protection for Reinforced Concrete Bridge Decks,\" a slotted cathodic protection system was installed on the ES ramp in the Woodinville Interchange during the summer of 1985. The slotted cathodic protection system involves sawing by slots longitudinally in the existing deck at one-foot centers. Platinum wire or carbon strand wire is placed in the cut slots first and then conductive polymer is filled in the slots. Electric power from a rectifier supplies current to the wire and conductive polymer. The current then flows to the top mat reinforcing steel, giving the steel protection from further corrosion. The objective of the demonstration project was to familiarize the Washington State DOT with this new technology. This objective was fulfilled. Some problem areas with the system were identified during the work:1.A more positive method of finding grounding locations from the anode to nicks, ties, etc. needs to be developed. Perhaps an instrument can be used to supplement visual inspection. 2.The necessity for having a minimum of 112-inch cover from the bottom of the slot to the top of the needs to be resolved. 3.A better method of installing the conductive polymer needs to be developed. Hand spreading of the material from plastic bags results in sloppy work. 4.Procurement time for the rectifier needs to be shortened. 5.The project, once it has started, moves along very rapidly, there is very little time for on-the-job training of workers. Workmen should have prior experience at this work. In remote areas, sources of electrical power may not be available. It will be necessary for sources of power, such as solar panels or long-lasting batteries to be developed for this system.
Authors:
Roper,T. H., Henley,E. H. Jr
Keywords:
bridge, bridge deck, bridge decks, cathodic protection, concrete, concrete bridge, construction, corrosion, Deck, developed, flow, inspection, plastic, polymer, project, protection, reinforced concrete, reinforced concrete bridge, reinforcing, reinforcing steel, steel, steel protection, supply, System, technology, training, Washington, Washington state
Under FHWA Demonstration Project No. 34, \"Cathodic Protection for Reinforced Concrete Bridge Decks,\" a slotted cathodic protection system was installed on the ES ramp in the Woodinville Interchange during the summer of 1985. The slotted cathodic protection system involves sawing by slots longitudinally in the existing deck at one-foot centers. Platinum wire or carbon strand wire is placed in the cut slots first and then conductive polymer is filled in the slots. Electric power from a rectifier supplies current to the wire and conductive polymer. The current then flows to the top mat reinforcing steel, giving the steel protection from further corrosion. The objective of the demonstration project was to familiarize the Washington State DOT with this new technology. This objective was fulfilled. Some problem areas with the system were identified during the work:1.A more positive method of finding grounding locations from the anode to nicks, ties, etc. needs to be developed. Perhaps an instrument can be used to supplement visual inspection. 2.The necessity for having a minimum of 112-inch cover from the bottom of the slot to the top of the needs to be resolved. 3.A better method of installing the conductive polymer needs to be developed. Hand spreading of the material from plastic bags results in sloppy work. 4.Procurement time for the rectifier needs to be shortened. 5.The project, once it has started, moves along very rapidly, there is very little time for on-the-job training of workers. Workmen should have prior experience at this work. In remote areas, sources of electrical power may not be available. It will be necessary for sources of power, such as solar panels or long-lasting batteries to be developed for this system.
Authors:
Roper,T. H., Henley,E. H. Jr
Keywords:
bridge, bridge deck, bridge decks, cathodic protection, concrete, concrete bridge, construction, corrosion, Deck, developed, flow, inspection, plastic, polymer, project, protection, reinforced concrete, reinforced concrete bridge, reinforcing, reinforcing steel, steel, steel protection, supply, System, technology, training, Washington, Washington state
|
Roper,T. H. | WA-RD 087.2 | Cathodic Protection For Reinforced Concrete Bridge Decks - Yakima River Bridge, Post Construction Report | 1986 |
Abstract:
Under FHWA Demonstration Project No. 34, \"Cathodic Protection for Reinforced Concrete Decks,\" a non-slotted cathodic protection system was installed on the deck of the Yakima Bridge near Yakima, Washington, in the summer of 1985. The project involved repairing deck, then fastening Raychem pre-manufactured anodes to the deck to impress current to the mat rebar. Impressing current through the concrete to the top mat steel prevents corrosion of the steel. A latex modified concrete overlay was placed over the deck anode. The objective of the demonstration project to familiarize the Washington State DOT with new technology. This objective was fulfilled. Some problem areas with the system were identified during the work: 1.A more positive method of finding electrical grounding locations from the anode to nicks, ties, etc., needs to be developed. Some ties were exposed during the scarifying operation Perhaps an instrument can be used to supplement visual inspection. 2. An effective technique of allowing concrete trucks to drive on the anode without damaging needs to be developed. 3.An effective method needs to be developed to locate breaks in the anode as well as shorts. 4. In remote areas, sources of electrical power may not be available. It will be necessary sources of power, such as solar panels or long-lasting batteries to be developed for this system. 5. Since the project, once it has started, moves along very rapidly, there is very little time on-the-job training of workers. Workmen should have prior experience at this work. These problems need to be overcome to obtain a better quality product.
Authors:
Roper,T. H., Henley,E. H. Jr
Keywords:
bridge, bridge deck, bridge decks, cathodic protection, concrete, concrete bridge, construction, corrosion, Deck, developed, inspection, latex modified concrete, overlay, project, protection, quality, reinforced concrete, reinforced concrete bridge, steel, System, technology, training, truck, trucks, Washington, Washington state
Under FHWA Demonstration Project No. 34, \"Cathodic Protection for Reinforced Concrete Decks,\" a non-slotted cathodic protection system was installed on the deck of the Yakima Bridge near Yakima, Washington, in the summer of 1985. The project involved repairing deck, then fastening Raychem pre-manufactured anodes to the deck to impress current to the mat rebar. Impressing current through the concrete to the top mat steel prevents corrosion of the steel. A latex modified concrete overlay was placed over the deck anode. The objective of the demonstration project to familiarize the Washington State DOT with new technology. This objective was fulfilled. Some problem areas with the system were identified during the work: 1.A more positive method of finding electrical grounding locations from the anode to nicks, ties, etc., needs to be developed. Some ties were exposed during the scarifying operation Perhaps an instrument can be used to supplement visual inspection. 2. An effective technique of allowing concrete trucks to drive on the anode without damaging needs to be developed. 3.An effective method needs to be developed to locate breaks in the anode as well as shorts. 4. In remote areas, sources of electrical power may not be available. It will be necessary sources of power, such as solar panels or long-lasting batteries to be developed for this system. 5. Since the project, once it has started, moves along very rapidly, there is very little time on-the-job training of workers. Workmen should have prior experience at this work. These problems need to be overcome to obtain a better quality product.
Authors:
Roper,T. H., Henley,E. H. Jr
Keywords:
bridge, bridge deck, bridge decks, cathodic protection, concrete, concrete bridge, construction, corrosion, Deck, developed, inspection, latex modified concrete, overlay, project, protection, quality, reinforced concrete, reinforced concrete bridge, steel, System, technology, training, truck, trucks, Washington, Washington state
|
Ritchie,S. G. | WA-RD 083.1 | Statewide Highway Data Rationalization Study | 1986 |
Abstract:
This study involved an in-depth evaluation of the Washington State Department of Transportation highway data development and analysis activities. It developed statistically-based procedures and recommendations for a streamlined highway data collection program. Opportunities to reduce manpower and equipment costs, streamline work activities, improve the quality of data collection and provide accurate and timely data for the various users were identified. Given the focus on highway data, the major effort was devoted to the Department's traffic counting program. However, many data items and programs were considered, with the following receiving particular attention: traffic volume counting, including estimation of annual average daily traffic at any location throughout the state highway system; associated seasonal, axle and growth factors; vehicle classification; truck weights; and the relationship between the statistical sampling requirements recommended for these items and those associated with the FHWA Highway Performance Monitoring System in the state.
Authors:
Ritchie,S. G., Hallenbeck,M. E.
Keywords:
analysis, Annual, axle, cost, costs, data, data collection, developed, development, equipment, evaluation, highway, monitoring, performance, performance monitoring, program, quality, sampling, seasonal, Study, System, traffic, traffic counting, transportation, truck, vehicle classification, volume, Washington, Washington state, weight, weights
This study involved an in-depth evaluation of the Washington State Department of Transportation highway data development and analysis activities. It developed statistically-based procedures and recommendations for a streamlined highway data collection program. Opportunities to reduce manpower and equipment costs, streamline work activities, improve the quality of data collection and provide accurate and timely data for the various users were identified. Given the focus on highway data, the major effort was devoted to the Department's traffic counting program. However, many data items and programs were considered, with the following receiving particular attention: traffic volume counting, including estimation of annual average daily traffic at any location throughout the state highway system; associated seasonal, axle and growth factors; vehicle classification; truck weights; and the relationship between the statistical sampling requirements recommended for these items and those associated with the FHWA Highway Performance Monitoring System in the state.
Authors:
Ritchie,S. G., Hallenbeck,M. E.
Keywords:
analysis, Annual, axle, cost, costs, data, data collection, developed, development, equipment, evaluation, highway, monitoring, performance, performance monitoring, program, quality, sampling, seasonal, Study, System, traffic, traffic counting, transportation, truck, vehicle classification, volume, Washington, Washington state, weight, weights
|
LaFraugh,R. W. | WA-RD 093.1 | Concrete Overlays For Bridges 829 | 1986 |
Abstract:
An extensive state-of-the-art review of construction methods and results for latex modified concrete (LMC) and low slump, dense concrete (LSDC) overlays is presented in this report. Recommendations are made for improvements in construction procedures, inspection, and specifications. An analysis and preventative measures for plastic shrinkage cracks in LMC are presented. Other alternate bridge deck protective systems were examined.
Authors:
LaFraugh,R. W., Zinserling,M. H.
Keywords:
analysis, bridge, bridge deck, bridges, concrete, concrete overlays, construction, construction methods, cracking, Deck, improvement, inspection, Interim, latex modified concrete, low slump dense concrete, methods, overlay, overlays, plastic, review, shrinkage, specification, specifications, state-of-the-art, System, systems
An extensive state-of-the-art review of construction methods and results for latex modified concrete (LMC) and low slump, dense concrete (LSDC) overlays is presented in this report. Recommendations are made for improvements in construction procedures, inspection, and specifications. An analysis and preventative measures for plastic shrinkage cracks in LMC are presented. Other alternate bridge deck protective systems were examined.
Authors:
LaFraugh,R. W., Zinserling,M. H.
Keywords:
analysis, bridge, bridge deck, bridges, concrete, concrete overlays, construction, construction methods, cracking, Deck, improvement, inspection, Interim, latex modified concrete, low slump dense concrete, methods, overlay, overlays, plastic, review, shrinkage, specification, specifications, state-of-the-art, System, systems
|
Nihan,N. L. | WA-RD 063.1 | Telecommunications Link: Traffic Systems Management Center and University of Washington | 1984 |
Abstract:
This report describes a newly established telecommunications link between Seattle\'s Traffic System Management Center (TSMC) and the University of Washington\'s (UW) Information Retrieval System. Volume data in five-minute intervals collected by the TSMC is transferred to the UW computer system. The reports contains a description of this 1 ink and a User\'s Guide for those who wish to access the data.
Authors:
Nihan,N. L.
Keywords:
computer, data, freeway surveillance, information retrieval, management, seattle, System, systems, telecommunications, telecommunications link, traffic, traffic systems management, traffic volumes, volume, Washington
This report describes a newly established telecommunications link between Seattle\'s Traffic System Management Center (TSMC) and the University of Washington\'s (UW) Information Retrieval System. Volume data in five-minute intervals collected by the TSMC is transferred to the UW computer system. The reports contains a description of this 1 ink and a User\'s Guide for those who wish to access the data.
Authors:
Nihan,N. L.
Keywords:
computer, data, freeway surveillance, information retrieval, management, seattle, System, systems, telecommunications, telecommunications link, traffic, traffic systems management, traffic volumes, volume, Washington
|
Limotti,Brian | WA-RD 042.2 | Response of Washington State Residents to Changing transit conditions 882 | 1984 |
Abstract:
This study was undertaken to measure and assess current transportation behavior, attitudes, and adjustments people have made or are planning to make to cope with higher costs of transportation and energy shortages. A secondary objective was to develop an effective and inexpensive system to collect a sizeable amount of multimodal data for various types of travel from a statistically reliable sample of modal data for various types of travel from a statistically reliable sample of households in the State of Washington. Telephone interviews of approximately 15 minutes in length were conducted with 2,500 households in 1980 and 2,000 homes in 1983, with both samples having a 95 percent confidence level. Residents of metropolitan, urban and rural areas were included. The households interviewed were selected by a random computer search of telephone numbers. Respondents were screened to ensure that an adult member (18 years or older) of the household was interviewed. The questionnaire dealt with the travel habits of the household rather than just the person being interviewed. Travel to work, local travel, long distance travel, recreational travel, use of public transit and other modes of travel, as well as vehicle ownership trends were topics covered in the interviews. The household's travel patterns two years prior to the interview, as well as current behavior and future plans were included. The replies to the questions indicated that people were concerned about transportation problems and were willing to provide detailed facts and opinions about their household's transportation behavior.
Authors:
Limotti,Brian, Iverson,Evan, Jacobson,Robert
Keywords:
attitudes, behavior, computer, condition, cost, costs, data, data collection, Energy, energy shortages, households, interviews, multimodal, planning, public, public transit, Recreational travel, ridership, rural, Surveys, System, transit, transportation, travel, travel patterns, urban, Washington, Washington state
This study was undertaken to measure and assess current transportation behavior, attitudes, and adjustments people have made or are planning to make to cope with higher costs of transportation and energy shortages. A secondary objective was to develop an effective and inexpensive system to collect a sizeable amount of multimodal data for various types of travel from a statistically reliable sample of modal data for various types of travel from a statistically reliable sample of households in the State of Washington. Telephone interviews of approximately 15 minutes in length were conducted with 2,500 households in 1980 and 2,000 homes in 1983, with both samples having a 95 percent confidence level. Residents of metropolitan, urban and rural areas were included. The households interviewed were selected by a random computer search of telephone numbers. Respondents were screened to ensure that an adult member (18 years or older) of the household was interviewed. The questionnaire dealt with the travel habits of the household rather than just the person being interviewed. Travel to work, local travel, long distance travel, recreational travel, use of public transit and other modes of travel, as well as vehicle ownership trends were topics covered in the interviews. The household's travel patterns two years prior to the interview, as well as current behavior and future plans were included. The replies to the questions indicated that people were concerned about transportation problems and were willing to provide detailed facts and opinions about their household's transportation behavior.
Authors:
Limotti,Brian, Iverson,Evan, Jacobson,Robert
Keywords:
attitudes, behavior, computer, condition, cost, costs, data, data collection, Energy, energy shortages, households, interviews, multimodal, planning, public, public transit, Recreational travel, ridership, rural, Surveys, System, transit, transportation, travel, travel patterns, urban, Washington, Washington state
|
Kulkarni,R. B. | WA-RD 062.1 | Feasibility Study of a Pavement Management System for Washington Counties | 1984 |
Abstract:
The feasibility of adopting the Washington State Pavement Management System(WSPMS) for use by Washington counties was established. The WSPMS designoffers a great deal of flexibility for adjusting the system to satisfy thecounties needs. Some modifications to computer programs will be necessaryand can be accomplished with relatively modest effort. The major adjustmentswill be in those counties input data. The only data that are absolutelyessential are those for determining and evaluating pavement condition andthe most cost effective rehabilitation strategies.The state computer system has an adequate storage capacity to support usageof the WSPMS by a large number of counties. Dial-up capability i s availablefor use of WSPMS from remote terminals. Data processing hardware optionsavailable to counties range from no data processing equipment to stand alonecomputer system,A t r i a l demonstration is recommended, Two counties, one large with in-housecomputer f a c i l i t i e s and one small with no or minimal f a c i l i t i e s would bechosen to test the system.Significant. benefits are anticipated from the use of WSPMS. Washingtoncounties desiring to improve the process o f pavement management may findadopting and operating the WSPMS to feasible and desirable.
Authors:
Kulkarni,R. B., Finn,F. N., Lamot,A.
Keywords:
benefit, benefits, computer, computer program, condition, cost, cost effective, counties, data, design, equipment, maintenance, management, management system, Operating, pavement, pavement condition, pavement management, pavement repair, program, rehabilitation, Study, System, Washington, Washington state
The feasibility of adopting the Washington State Pavement Management System(WSPMS) for use by Washington counties was established. The WSPMS designoffers a great deal of flexibility for adjusting the system to satisfy thecounties needs. Some modifications to computer programs will be necessaryand can be accomplished with relatively modest effort. The major adjustmentswill be in those counties input data. The only data that are absolutelyessential are those for determining and evaluating pavement condition andthe most cost effective rehabilitation strategies.The state computer system has an adequate storage capacity to support usageof the WSPMS by a large number of counties. Dial-up capability i s availablefor use of WSPMS from remote terminals. Data processing hardware optionsavailable to counties range from no data processing equipment to stand alonecomputer system,A t r i a l demonstration is recommended, Two counties, one large with in-housecomputer f a c i l i t i e s and one small with no or minimal f a c i l i t i e s would bechosen to test the system.Significant. benefits are anticipated from the use of WSPMS. Washingtoncounties desiring to improve the process o f pavement management may findadopting and operating the WSPMS to feasible and desirable.
Authors:
Kulkarni,R. B., Finn,F. N., Lamot,A.
Keywords:
benefit, benefits, computer, computer program, condition, cost, cost effective, counties, data, design, equipment, maintenance, management, management system, Operating, pavement, pavement condition, pavement management, pavement repair, program, rehabilitation, Study, System, Washington, Washington state
|
Newcomb,D. E. | WA-RD 065.1 | State-Of-The-Art On Pavement Overlay Procedures: Volume I, Review Pavement Plan | 1983 |
Abstract:
The study is reported in two volumes. The first volume summarizes the state-of-the-art on pavement overlay design and presents a research plan to develop an overlay design procedure for the Washington State Department of Transportation (WSDOT) The second volume contains an annotated bibliographyof significant pavement overlay literature published since 1968.The state-of-the-art review presented in Volume I addresses pavement evaluation using nondestructive testing and subjective ratings. These are discussed along with the topics of traffic and seasonal variations. Pavement overlay design concepts are identified and discussed. A research plan is presented forthe development of a pavement overlay design system for WSDOT.
Authors:
Newcomb,D. E., Bubushait,A. A., Mahoney,J. P., Sharma,J.
Keywords:
design, development, evaluation, nondestructive testing, overlay, pavement, pavement evaluation, performance, research, review, seasonal, seasonal variation, seasonal variations, state-of-the-art, Study, System, traffic, transportation, volume, Washington, Washington state, WSDOT
The study is reported in two volumes. The first volume summarizes the state-of-the-art on pavement overlay design and presents a research plan to develop an overlay design procedure for the Washington State Department of Transportation (WSDOT) The second volume contains an annotated bibliographyof significant pavement overlay literature published since 1968.The state-of-the-art review presented in Volume I addresses pavement evaluation using nondestructive testing and subjective ratings. These are discussed along with the topics of traffic and seasonal variations. Pavement overlay design concepts are identified and discussed. A research plan is presented forthe development of a pavement overlay design system for WSDOT.
Authors:
Newcomb,D. E., Bubushait,A. A., Mahoney,J. P., Sharma,J.
Keywords:
design, development, evaluation, nondestructive testing, overlay, pavement, pavement evaluation, performance, research, review, seasonal, seasonal variation, seasonal variations, state-of-the-art, Study, System, traffic, transportation, volume, Washington, Washington state, WSDOT
|
Newcomb,D. E. | WA-RD 065.2 | State-Of-The-Art On Pavement Overlay Procedures: Volume II Annotated Bibliography | 1983 |
Abstract:
This report is presented in two volumes. The first volume summarizes the Final Report Sept. 15 - Dec. 15, 1983 14. Sponsoring Agency Code state-of-the-art on pavement overlay design and presents a research plan to develop an overlay design procedure for the Washington State Department of Transportation (WSDOT) . The second volume contains an annotated bibliography of significant pavement overlay 1iterature pub1ished since 1968.The state-of-the-art review presented in Volume I addresses pavement evaluation using nondestructive testing and subjective ratings. These are discussed along with the topics of traffic and seasonal variations. Pavement overlay design concepts are identified and discussed. A research plan is presented for the development of a pavement overlay design system for WSDOT,
Authors:
Newcomb,D. E., Bubushait,A. A., Mahoney,J. P., Sharma,J.
Keywords:
agencies, design, development, evaluation, nondestructive testing, overlay, pavement, pavement evaluation, performance, research, review, seasonal, seasonal variation, seasonal variations, state-of-the-art, System, traffic, transportation, volume, Washington, Washington state, WSDOT
This report is presented in two volumes. The first volume summarizes the Final Report Sept. 15 - Dec. 15, 1983 14. Sponsoring Agency Code state-of-the-art on pavement overlay design and presents a research plan to develop an overlay design procedure for the Washington State Department of Transportation (WSDOT) . The second volume contains an annotated bibliography of significant pavement overlay 1iterature pub1ished since 1968.The state-of-the-art review presented in Volume I addresses pavement evaluation using nondestructive testing and subjective ratings. These are discussed along with the topics of traffic and seasonal variations. Pavement overlay design concepts are identified and discussed. A research plan is presented for the development of a pavement overlay design system for WSDOT,
Authors:
Newcomb,D. E., Bubushait,A. A., Mahoney,J. P., Sharma,J.
Keywords:
agencies, design, development, evaluation, nondestructive testing, overlay, pavement, pavement evaluation, performance, research, review, seasonal, seasonal variation, seasonal variations, state-of-the-art, System, traffic, transportation, volume, Washington, Washington state, WSDOT
|
Nelson,T. L. | WA-RD 050.3 | Development And Implementation Of Washington State's Pavement System - Executive Summary | 1983 |
Abstract:
This report summarizes the pavement management system developed by WSDOT staff over a period of five years. Included is a description of what the system does in terms of the considerable amount of useful output data produced. A discussion is given on how the system was developed, what the pavement rating procedures involve and cost, what computer requirements are, and what typical data processing costs are. The report concludes with comments on how other agencies can use the Washington State Pavement Management System.
Authors:
Nelson,T. L., LeClerc,R. V.
Keywords:
agencies, computer, cost, costs, data, developed, development, Executive, Executive Summary, management, management system, pavement, pavement data file, pavement management, pavement performance, System, Washington, Washington state, WSDOT
This report summarizes the pavement management system developed by WSDOT staff over a period of five years. Included is a description of what the system does in terms of the considerable amount of useful output data produced. A discussion is given on how the system was developed, what the pavement rating procedures involve and cost, what computer requirements are, and what typical data processing costs are. The report concludes with comments on how other agencies can use the Washington State Pavement Management System.
Authors:
Nelson,T. L., LeClerc,R. V.
Keywords:
agencies, computer, cost, costs, data, developed, development, Executive, Executive Summary, management, management system, pavement, pavement data file, pavement management, pavement performance, System, Washington, Washington state, WSDOT
|
Kelly,W. J. | WA-RD 057.2 | Transit System Performance Evaluation Methodology for Washington State | 1983 |
Abstract:
This report examines major issues, concepts and methods of bus transit performance evaluation and suggests procedures and guidelines for internal and external monitoring in Washington State. In support of suggested procedures, data analysis on six years of operational and financial characteristics of Washington State systems, 1979-80 Section 15 data, and collected samples of small community/rural systems from other states was conducted. The major objective of the analysis was to test methodologies for developing and assessing transit peer groups\" relative to size and scale of operations, and prior to comparative within-group evaluation. The methodology entailed employing cluster analysis using up to 10 variables depicting service design and distribution. Two key variables were population and line miles. Problems were encountered in using Section 15 data. Due to its use of urban area, as opposed to service area population, clear distinctions of operating environments could not be determined. Thus, cluster groupings using Section 15 data were inconclusive. Cluster State systems (1980) were satisfactory and following additional verification, a suggested \"peer group\" classification for Washington State was recommended. The seven group types ranged in size from a rural regional (<40,000 population) to metropolitan (<1,000,00 population). Values for 8 efficiency and effectiveness indicators were used to assess \"peer group\" trends in performance in Washington over a five-year period (1976-80). Comparative evaluations of individual systems were not made. Despite only partial success in determining \"peer groups\", the study does identify methods and procedures for assisting in external and internal performance evaluation.
Authors:
Kelly,W. J., Rutherford,G. S.
Keywords:
peer group evaluation, analysis, bus, bus transit, cluster analysis, data, data collection, design, effectiveness, efficiency, environment, evaluation, group, indicator, indicators, Issues, ITS, line, methodology, methods, monitoring, Operating, performance, performance evaluation, performance measures, performance standards, population, rural, section 15 data, Study, System, systems, transit, urban, Washington, Washington state
This report examines major issues, concepts and methods of bus transit performance evaluation and suggests procedures and guidelines for internal and external monitoring in Washington State. In support of suggested procedures, data analysis on six years of operational and financial characteristics of Washington State systems, 1979-80 Section 15 data, and collected samples of small community/rural systems from other states was conducted. The major objective of the analysis was to test methodologies for developing and assessing transit peer groups\" relative to size and scale of operations, and prior to comparative within-group evaluation. The methodology entailed employing cluster analysis using up to 10 variables depicting service design and distribution. Two key variables were population and line miles. Problems were encountered in using Section 15 data. Due to its use of urban area, as opposed to service area population, clear distinctions of operating environments could not be determined. Thus, cluster groupings using Section 15 data were inconclusive. Cluster State systems (1980) were satisfactory and following additional verification, a suggested \"peer group\" classification for Washington State was recommended. The seven group types ranged in size from a rural regional (<40,000 population) to metropolitan (<1,000,00 population). Values for 8 efficiency and effectiveness indicators were used to assess \"peer group\" trends in performance in Washington over a five-year period (1976-80). Comparative evaluations of individual systems were not made. Despite only partial success in determining \"peer groups\", the study does identify methods and procedures for assisting in external and internal performance evaluation.
Authors:
Kelly,W. J., Rutherford,G. S.
Keywords:
peer group evaluation, analysis, bus, bus transit, cluster analysis, data, data collection, design, effectiveness, efficiency, environment, evaluation, group, indicator, indicators, Issues, ITS, line, methodology, methods, monitoring, Operating, performance, performance evaluation, performance measures, performance standards, population, rural, section 15 data, Study, System, systems, transit, urban, Washington, Washington state
|
Public Transportation and Planning Division | WA-RD 045.2 | Impacts Of Trucks And Railroad Deregulation On Transportation Operation And Economic Activity In The State Of Washinton ... | 1982 |
Abstract:
The Motor Carrier Act of 1980 and the Staggers Act of 1980 have partially set aside decades of rigid regulations of interstate freight movement. These actions have the potential to bring forth significant changes to the networks of interstate freight transportation. The object of this research was to ascertain the impacts of deregulation of the Washington State transportation system. Information was obtained by surveying and interviewing shippers and freight transportation providers throughout the state. Anticipated impacts, e.g. accelerated rail abandonment or lost of motor carrier service to small communities were not present. The study reflects a relative increase in truck service and decrease in rail service since deregulation. Indications are this may be further amplified in certain regions of the state. The study recommends that potential highway impacts be incorporated into pavement management systems. Transportation officials are enjoined to treat issues relative to truck size and weight, highway cost allocation and deregulation as a single issue. Also, the Local Rail Service Assistance Program should be considered for use to offset any adverse impacts resulting from deregulation. During this period of the study, general economic conditions were poor. This resulted in a decrease in freight shipments and would suggest that some impacts of deregulation have been suppressed.
Authors:
Public Transportation and Planning Division, Washington State Department of Transportation
Keywords:
condition, cost, Deregulation, freight, highway, highway impacts, impact, impacts, management, management system, management systems, motor carrier, networks, pavement, pavement management, pavement management systems, program, rail service, railroads, regulation, research, System, systems, transportation, truck, trucking, trucks, Washington, Washington state, weight
The Motor Carrier Act of 1980 and the Staggers Act of 1980 have partially set aside decades of rigid regulations of interstate freight movement. These actions have the potential to bring forth significant changes to the networks of interstate freight transportation. The object of this research was to ascertain the impacts of deregulation of the Washington State transportation system. Information was obtained by surveying and interviewing shippers and freight transportation providers throughout the state. Anticipated impacts, e.g. accelerated rail abandonment or lost of motor carrier service to small communities were not present. The study reflects a relative increase in truck service and decrease in rail service since deregulation. Indications are this may be further amplified in certain regions of the state. The study recommends that potential highway impacts be incorporated into pavement management systems. Transportation officials are enjoined to treat issues relative to truck size and weight, highway cost allocation and deregulation as a single issue. Also, the Local Rail Service Assistance Program should be considered for use to offset any adverse impacts resulting from deregulation. During this period of the study, general economic conditions were poor. This resulted in a decrease in freight shipments and would suggest that some impacts of deregulation have been suppressed.
Authors:
Public Transportation and Planning Division, Washington State Department of Transportation
Keywords:
condition, cost, Deregulation, freight, highway, highway impacts, impact, impacts, management, management system, management systems, motor carrier, networks, pavement, pavement management, pavement management systems, program, rail service, railroads, regulation, research, System, systems, transportation, truck, trucking, trucks, Washington, Washington state, weight
|
Public Transportation and Planning Division | WA-RD 047.1 | Transportation Problems Associated with Uneven Growth Rates 902 | 1982 |
Abstract:
The purpose of the study is to determine how distinctive social, economic, land use, governmental and political characteristics in the Vancouver-Portland area to uneven growth which in turn affects the transportation system. Interviews with public and private industrial representatives to identify the reasons underlying uneven growth are discussed. A statistical analysis of population, employment, vehicle registration and traffic across the Interstate 5 bridge connecting Vancouver and Portland is also presented. Recommendations are listed which suggest ways to improve the transportation system through modification of elements contributing to uneven growth.
Authors:
Public Transportation and Planning Division, Washington State Department of Transportation
Keywords:
analysis, bi-city, bi-state, bridge, economic development, employment, industrial location decision, interviews, land use, land use sewerage, land-use, population, public, statistical analysis, Study, System, traffic, traffic volumes, transportation, Uneven growth rate
The purpose of the study is to determine how distinctive social, economic, land use, governmental and political characteristics in the Vancouver-Portland area to uneven growth which in turn affects the transportation system. Interviews with public and private industrial representatives to identify the reasons underlying uneven growth are discussed. A statistical analysis of population, employment, vehicle registration and traffic across the Interstate 5 bridge connecting Vancouver and Portland is also presented. Recommendations are listed which suggest ways to improve the transportation system through modification of elements contributing to uneven growth.
Authors:
Public Transportation and Planning Division, Washington State Department of Transportation
Keywords:
analysis, bi-city, bi-state, bridge, economic development, employment, industrial location decision, interviews, land use, land use sewerage, land-use, population, public, statistical analysis, Study, System, traffic, traffic volumes, transportation, Uneven growth rate
|
Nelson,Thomas L. | WA-RD 050.1 | Development And Implementation Of Washington State's Pavement System 905 | 1982 |
Abstract:
This report describes the pavement management system developed by WSDOT staff over a period of five years. Both project-level and network-level pavement management are represented within the four broad areas of data processing which combine to constitute the foundation of the system.The design of a pavement data file is laid out together with the process of assembling it. Also shown are the methods used to analyze and convert the file data from pavement condition ratings to pavement performance curves for each project. The performance curves are then used, together with appropriate cost data, to determine the most cost-effective type and time to fix. The network-level program then summarized the need work for each year of a rehabilitation program. Mean are provided for adjusting the program to fit budget constraints or minimum acceptable levels of average pavement condition.It is concluded that the system, operating on biennial pavement condition ratings, provides a good solid framework for orderly analysis to estimate the economic benefits of the type, timing, and sequence of rehabilitation activities applied to a pavement.
Authors:
Nelson,Thomas L., LeClerc,R. V.
Keywords:
analysis, benefit, benefits, condition, cost, data, design, developed, development, foundation, framework, management, management system, methods, Operating, pavement, pavement condition, pavement data file, pavement management, pavement performance, performance, program, project, rehabilitation, System, Washington, Washington state, WSDOT
This report describes the pavement management system developed by WSDOT staff over a period of five years. Both project-level and network-level pavement management are represented within the four broad areas of data processing which combine to constitute the foundation of the system.The design of a pavement data file is laid out together with the process of assembling it. Also shown are the methods used to analyze and convert the file data from pavement condition ratings to pavement performance curves for each project. The performance curves are then used, together with appropriate cost data, to determine the most cost-effective type and time to fix. The network-level program then summarized the need work for each year of a rehabilitation program. Mean are provided for adjusting the program to fit budget constraints or minimum acceptable levels of average pavement condition.It is concluded that the system, operating on biennial pavement condition ratings, provides a good solid framework for orderly analysis to estimate the economic benefits of the type, timing, and sequence of rehabilitation activities applied to a pavement.
Authors:
Nelson,Thomas L., LeClerc,R. V.
Keywords:
analysis, benefit, benefits, condition, cost, data, design, developed, development, foundation, framework, management, management system, methods, Operating, pavement, pavement condition, pavement data file, pavement management, pavement performance, performance, program, project, rehabilitation, System, Washington, Washington state, WSDOT
|
Nelson,Thomas L. | WA-RD 050.2 | Development And Implementation Of Washington State's Pavement System - Summary 906 | 1982 |
Abstract:
This report describes the pavement system developed by staff over a period of five years. Both project-level and network-level pavement are represented within the four broad areas of data processing which combine to constitute the foundation of the system. The design of a pavement data file is laid out together with the process of assembling it. Also shown are the methods used to analyze and convert the file data pavement condition ratings to pavement performance curves for each project. The performance curves are then used, together with appropriate cost data, to determine the most cost-effective type and of fix. The network-level program then the needed work for each year of a rehabilitation program. Means are provided for adjusting the program to fit budget constraints or acceptable levels of average pavement condition It is concluded that the system, operating on biennial pavement condition ratings, provides a good solid framework for orderly analysis to estimate the economic benefits of the type, timing, and sequence of rehabilitation activities apply to a pavement.
Authors:
Nelson,Thomas L., LeClerc,R. V.
Keywords:
analysis, benefit, benefits, condition, cost, cost effective, data, design, developed, development, foundation, framework, management, management system, methods, Operating, pavement, pavement condition, pavement data file, pavement management, pavement performance, performance, program, project, rehabilitation, System, Washington, Washington state, WSDOT
This report describes the pavement system developed by staff over a period of five years. Both project-level and network-level pavement are represented within the four broad areas of data processing which combine to constitute the foundation of the system. The design of a pavement data file is laid out together with the process of assembling it. Also shown are the methods used to analyze and convert the file data pavement condition ratings to pavement performance curves for each project. The performance curves are then used, together with appropriate cost data, to determine the most cost-effective type and of fix. The network-level program then the needed work for each year of a rehabilitation program. Means are provided for adjusting the program to fit budget constraints or acceptable levels of average pavement condition It is concluded that the system, operating on biennial pavement condition ratings, provides a good solid framework for orderly analysis to estimate the economic benefits of the type, timing, and sequence of rehabilitation activities apply to a pavement.
Authors:
Nelson,Thomas L., LeClerc,R. V.
Keywords:
analysis, benefit, benefits, condition, cost, cost effective, data, design, developed, development, foundation, framework, management, management system, methods, Operating, pavement, pavement condition, pavement data file, pavement management, pavement performance, performance, program, project, rehabilitation, System, Washington, Washington state, WSDOT
|
Kelly,W. J. | WA-RD 051.1 | Transit System Performance - Evaluation Methodology - An Interim Draft Report 915 | 1982 |
Abstract:
The purpose of the report is to present major concepts of transit performance evaluation and suggest procedures and guidelines for internal and external performance monitoring in Washington State.
Authors:
Kelly,W. J., Rutherford,G. S.
Keywords:
bus transportation, data collection and analysis, evaluation, Interim, methodology, monitoring, performance, performance evaluation, performance measures, performance monitoring, System, transit, Washington, Washington state
The purpose of the report is to present major concepts of transit performance evaluation and suggest procedures and guidelines for internal and external performance monitoring in Washington State.
Authors:
Kelly,W. J., Rutherford,G. S.
Keywords:
bus transportation, data collection and analysis, evaluation, Interim, methodology, monitoring, performance, performance evaluation, performance measures, performance monitoring, System, transit, Washington, Washington state
|
Anderson,K. W. | WA-RD 046.1 | Permanent Lane Markings - Recessed Edge Stripe | 1981 |
Abstract:
The project goal was to evaluate different methods of cutting recessed skip stripe grooves, and to evaluate various pavement marking materials placed into the recesses. The project objective was to find a marking system for our mountain pass highways that would tolerate snowplowing and sanding operations, studded tires, and chain wear.Three methods of pavement grooving and three types of making material were evaluated over a four-year period. The grooving methods were evaluated with regard to production rate, the quality of the finished groove, and cost. The marking materials were checked for ease of installation, cost durability, and visibility.Only one method of grooving was found that produced the desired recess shape at a reasonable cost and in a timely manner. All three of the making materials were durable enough to survive for three years, but none produced the desired wet-daytime or wet-night visibility needed for adequate lane delineation. This loss of visibility under wet conditions was due to the lack of retroreflectance from the marking materials.
Authors:
Anderson,K. W.
Keywords:
chains, condition, cost, delineation, durability, grooves, grooving, highway, highway delineation, Highways, lane lines, materials, methods, night visibility, pavement, project, quality, rainfall, retroreflectance, snowplows, striping, studded tire, studded tires, System, tire, tires, Traffic markings
The project goal was to evaluate different methods of cutting recessed skip stripe grooves, and to evaluate various pavement marking materials placed into the recesses. The project objective was to find a marking system for our mountain pass highways that would tolerate snowplowing and sanding operations, studded tires, and chain wear.Three methods of pavement grooving and three types of making material were evaluated over a four-year period. The grooving methods were evaluated with regard to production rate, the quality of the finished groove, and cost. The marking materials were checked for ease of installation, cost durability, and visibility.Only one method of grooving was found that produced the desired recess shape at a reasonable cost and in a timely manner. All three of the making materials were durable enough to survive for three years, but none produced the desired wet-daytime or wet-night visibility needed for adequate lane delineation. This loss of visibility under wet conditions was due to the lack of retroreflectance from the marking materials.
Authors:
Anderson,K. W.
Keywords:
chains, condition, cost, delineation, durability, grooves, grooving, highway, highway delineation, Highways, lane lines, materials, methods, night visibility, pavement, project, quality, rainfall, retroreflectance, snowplows, striping, studded tire, studded tires, System, tire, tires, Traffic markings
|
Clark,David L. | WA-RD 039.4 | Composite Sampling Of Highway Runoff Year Two, Interim Report 935 | 1980 |
Abstract:
A composite sampling device was developed that can be installed at less than ten percent of the cost of automatic sampling systems currently used in Federal highway runoff studics. This dcvi ce was operated for one year, along-side an automatic sampler at the 1-5 side, to demonstrate that the two systems provide statistically identical storm composites.
Authors:
Clark,David L., Mar,B. W.
Keywords:
cost, developed, highway, highway runoff, Interim, runoff, sampling, System, systems, Water Pollutants, Washington State Monitoring
A composite sampling device was developed that can be installed at less than ten percent of the cost of automatic sampling systems currently used in Federal highway runoff studics. This dcvi ce was operated for one year, along-side an automatic sampler at the 1-5 side, to demonstrate that the two systems provide statistically identical storm composites.
Authors:
Clark,David L., Mar,B. W.
Keywords:
cost, developed, highway, highway runoff, Interim, runoff, sampling, System, systems, Water Pollutants, Washington State Monitoring
|
Mahoney,J. P. | WA-RD 036.1 | Pavement Testing and Analysis Of Heavy Hauls For SR-12 /Problem Area Highway On SR-12 940 | 1979 |
Abstract:
The pavement structure of SR 12 between Montesano and Elma, Washington was evaluated for the proposed heavy loads associated with construction of the Satsop power plant. Information used in evaluating SR-12 resulted from two sources which included field studies conducted by the Washington State Department of Transportation and development of various material strength parameters by the University of Washington. These data were used to model the pavement structure as a layered elastic system. By use of this analysis procedure, the stresses, strains, and deflections were estimated for the expected range of loading conditions. The results indicate that the most probable amount of damage (fatigue and rutting) expected for the non-cement treated base structural sections is less that one to two percent of available pavement life for the "expected" loading condition. An increase in either or both the trailer wheel load and pavement temperature will act to produce greater losses in pavement life. It is estimated that the tensile stresses in the cement treated base may exceed the tensile strength of this material.
Authors:
Mahoney,J. P., Tsunetta,Jerrold Y., Terrel,Ronald L.
Keywords:
analysis, base, condition, construction, damage, data, development, fatigue, highway, loads, materials, model, pavement, Pavement Evaluation, Materials Characterization, Layered Elastic System, Failure Criteria, Heavy Loads, pavement life, pavement temperature, strains, strength, stresses, System, temperature, transportation, Washington, Washington state, wheel load
The pavement structure of SR 12 between Montesano and Elma, Washington was evaluated for the proposed heavy loads associated with construction of the Satsop power plant. Information used in evaluating SR-12 resulted from two sources which included field studies conducted by the Washington State Department of Transportation and development of various material strength parameters by the University of Washington. These data were used to model the pavement structure as a layered elastic system. By use of this analysis procedure, the stresses, strains, and deflections were estimated for the expected range of loading conditions. The results indicate that the most probable amount of damage (fatigue and rutting) expected for the non-cement treated base structural sections is less that one to two percent of available pavement life for the "expected" loading condition. An increase in either or both the trailer wheel load and pavement temperature will act to produce greater losses in pavement life. It is estimated that the tensile stresses in the cement treated base may exceed the tensile strength of this material.
Authors:
Mahoney,J. P., Tsunetta,Jerrold Y., Terrel,Ronald L.
Keywords:
analysis, base, condition, construction, damage, data, development, fatigue, highway, loads, materials, model, pavement, Pavement Evaluation, Materials Characterization, Layered Elastic System, Failure Criteria, Heavy Loads, pavement life, pavement temperature, strains, strength, stresses, System, temperature, transportation, Washington, Washington state, wheel load
|
Hietzman,Paul G. | WA-RD 032.1 | Sub-Surface Infiltration System for Tree Irrigation 955 | 1977 |
Abstract:
From April through October 1977, a new sub surface irrigation system design was tested and evaluated in an applied situation. The purpose of this research was to study the practical application of the design and the collection of data for development of design, construction and maintenance guidelines. The study has proved the practical applicability of the "Sub Surface Infiltration System."
Authors:
Hietzman,Paul G.
Keywords:
construction, data, design, development, infiltration, maintenance, research, Sub-Surface, System, Tree Irrigation
From April through October 1977, a new sub surface irrigation system design was tested and evaluated in an applied situation. The purpose of this research was to study the practical application of the design and the collection of data for development of design, construction and maintenance guidelines. The study has proved the practical applicability of the "Sub Surface Infiltration System."
Authors:
Hietzman,Paul G.
Keywords:
construction, data, design, development, infiltration, maintenance, research, Sub-Surface, System, Tree Irrigation
|
Brown,C. B. | WA-RD 044.2 | Evergreen Point Bridge Maintenance Problems - Annual Report | 1975 |
Abstract:
This report completely describes the instrumentation on the drawspan of this Evergreen Point Bridge. The design and construction of the data recording system, with the complete calibration of the measurement and collection system is given. Initial data collection and preliminary analysis is set out. The analysis was subsequently abandoned, the data was retained.
Authors:
Brown,C. B.
Keywords:
analysis, Annual, bridge, calibration, construction, data, data collection, design, fatigue, maintenance, reliability, System, wind
This report completely describes the instrumentation on the drawspan of this Evergreen Point Bridge. The design and construction of the data recording system, with the complete calibration of the measurement and collection system is given. Initial data collection and preliminary analysis is set out. The analysis was subsequently abandoned, the data was retained.
Authors:
Brown,C. B.
Keywords:
analysis, Annual, bridge, calibration, construction, data, data collection, design, fatigue, maintenance, reliability, System, wind
|
Krukar,M. | WA-RD 009.3A | Effects Of Studded Tires On Traffic Striping Paints Phase II 997 | 1973 |
Abstract:
Four different types of pavement marking materials were tested in Ring #6; three brands of striping paints and one thermoplastic stripping tape. These striping materials were applied on two sections, the ploymer ranked on the basis of appearance, wear, and whiteness.The thermoplastic striping material consistently outperformed the three paints. The materials wore more rapidly on the polymer cement concrete that on the asphalt concrete and the ranking order for the paints was different for the two sections. The Type #3 stud seemed to have worn the paints more rapidly than either #4, #2, GST, US and UST studs and tires in that order respectively. The superiority of the ethermoplastic striping tape was due to its thickness and its construction. Last year Kennametal, Inc. sent the Transportation Systems Section four different types of traffic paint and a thermoplastic striping tape. Time did not permit the testing of these materials in Ring #5, so these materials were tested in Ring # 6.
Authors:
Krukar,M.
Keywords:
asphalt, asphalt concrete, concrete, construction, effects, ITS, materials, pavement, Phase II, polymer, striping, striping paints, stripping, Studded, studded tire, studded tires, studs, System, systems, tire, tires, traffic, transportation
Four different types of pavement marking materials were tested in Ring #6; three brands of striping paints and one thermoplastic stripping tape. These striping materials were applied on two sections, the ploymer ranked on the basis of appearance, wear, and whiteness.The thermoplastic striping material consistently outperformed the three paints. The materials wore more rapidly on the polymer cement concrete that on the asphalt concrete and the ranking order for the paints was different for the two sections. The Type #3 stud seemed to have worn the paints more rapidly than either #4, #2, GST, US and UST studs and tires in that order respectively. The superiority of the ethermoplastic striping tape was due to its thickness and its construction. Last year Kennametal, Inc. sent the Transportation Systems Section four different types of traffic paint and a thermoplastic striping tape. Time did not permit the testing of these materials in Ring #5, so these materials were tested in Ring # 6.
Authors:
Krukar,M.
Keywords:
asphalt, asphalt concrete, concrete, construction, effects, ITS, materials, pavement, Phase II, polymer, striping, striping paints, stripping, Studded, studded tire, studded tires, studs, System, systems, tire, tires, traffic, transportation
|
Terrel,Ronald L. | WA-RD 006.1 | Resilient Behavior Of Asphalt Treated Base Course Materials 1003 | 1972 |
Abstract:
In many parts of the world, the design of flexible pavement is still based on empirical methods which have developed from engineering experience. These empirical methods cannot be extrapolated beyond their limits without full scale trials to prove their applicability. In recent years, however, the increase of traffic, both in volume and axle loads, has led to the failure of many roads previously considered well designed. For this reason, therefore, researchers realized that a closer look at the pavement materials was desirable in order to develop a rational design procedure. Due to the complexity of characterizing pavement materials, and the limitations of instrumentation, much of the reported work offered little help in changing design practice. This is, perhaps, due to many simplifying assumptions which had to be introduced in the experimental procedure as well as the interpretation of the test results. Recently, however, there has been a sharp advancement in test instrumentation and an outstanding progress in processing the experimental results. This has been reflected through many fine investigations and has increased the demand for more improvements. An asphalt pavement is a complex structure whose function is to provide a suitable surface for a highway, an airport, or other off-highway facility. The load of a vehicle or an aircraft is transmitted through the multilayered system of processed materials which have different mechanical properties. The stress distribution within this system is highly complex and to a large extent is dependent on the relative stiffnesses of the individual layers.
Authors:
Terrel,Ronald L., Awad,S.
Keywords:
asphalt, asphalt pavement, axle, base, behavior, demand, design, developed, experimental, facilities, fine, highway, improvement, loads, materials, methods, pavement, stiffness, stresses, System, traffic, volume
In many parts of the world, the design of flexible pavement is still based on empirical methods which have developed from engineering experience. These empirical methods cannot be extrapolated beyond their limits without full scale trials to prove their applicability. In recent years, however, the increase of traffic, both in volume and axle loads, has led to the failure of many roads previously considered well designed. For this reason, therefore, researchers realized that a closer look at the pavement materials was desirable in order to develop a rational design procedure. Due to the complexity of characterizing pavement materials, and the limitations of instrumentation, much of the reported work offered little help in changing design practice. This is, perhaps, due to many simplifying assumptions which had to be introduced in the experimental procedure as well as the interpretation of the test results. Recently, however, there has been a sharp advancement in test instrumentation and an outstanding progress in processing the experimental results. This has been reflected through many fine investigations and has increased the demand for more improvements. An asphalt pavement is a complex structure whose function is to provide a suitable surface for a highway, an airport, or other off-highway facility. The load of a vehicle or an aircraft is transmitted through the multilayered system of processed materials which have different mechanical properties. The stress distribution within this system is highly complex and to a large extent is dependent on the relative stiffnesses of the individual layers.
Authors:
Terrel,Ronald L., Awad,S.
Keywords:
asphalt, asphalt pavement, axle, base, behavior, demand, design, developed, experimental, facilities, fine, highway, improvement, loads, materials, methods, pavement, stiffness, stresses, System, traffic, volume
|
Seabloom,Robert W. | WA-RD 009.4 | Rest Area Wastewater Disposal 1005 | 1972 |
Abstract:
A study was conducted of rest area wastewater disposal problems and related factors for the Washington State Highway Commission during the period of June - December 1971. This report on the study is intended to present an evaluation of present rest area wastewater systems together with feasibility analyses of alternative methods of waste handling. It is not intended to be a preliminary engineering design report.Data are presented on rest area problems as reported to or observed by the writers on field visitations. This is followed by discussions of criteria and standards presently used in rest area design together with data on water usage for those rest areas where "complete" data were available. Laboratory analyses were made on rest area wastewaters and on a certain additive, " Bacterial Waste Disposer", that has been used in some of the rest areas. A discussion is included on possible future trends and uses of rest areas and the need to minimize water usage. Chapter XI1 contains the principal thrust of the report in its discussion of possible rest area wastewater disposal methods with an evaluation and some relative cost data. With increasingly stringent requirements for wastewater disposal, it seems apparent that rest area wastewaters must continue to be disposed of on highway property. If not, the Department would find itself, in most instances, with the task of operating continuously and effectually some rather complicated treatment systems that require trained operators, operational reports and effluent analyses, and systems that are not usually amenable to the flow characteristics of rest area wastewaters. Since much national attention is being given to these problems, it is hoped that new or improved treatment schemes may be developed in the future that will be appropriate for rest areas. An intent of this study has thus been to suggest means of wastewater disposal, presently available that would offer an improvement to the septic tank drain field method of disposal.Conclusions and recommendations drawn from the study are as follows:1. There is no question but that septic tank- drain field disposal systems would, because of their simplicity, be the preferred method of disposal if their installation were applicable to most rest areas and if they would, from past experiences here and elsewhere give some assurance of a freedom from operating difficulties over a period of just a few years.
Authors:
Seabloom,Robert W.
Keywords:
additive, Alternative, cost, criteria, data, design, developed, disposal, evaluation, flow, highway, improvement, ITS, methods, Operating, rest area, rest areas, Study, System, systems, Washington, Washington state
A study was conducted of rest area wastewater disposal problems and related factors for the Washington State Highway Commission during the period of June - December 1971. This report on the study is intended to present an evaluation of present rest area wastewater systems together with feasibility analyses of alternative methods of waste handling. It is not intended to be a preliminary engineering design report.Data are presented on rest area problems as reported to or observed by the writers on field visitations. This is followed by discussions of criteria and standards presently used in rest area design together with data on water usage for those rest areas where "complete" data were available. Laboratory analyses were made on rest area wastewaters and on a certain additive, " Bacterial Waste Disposer", that has been used in some of the rest areas. A discussion is included on possible future trends and uses of rest areas and the need to minimize water usage. Chapter XI1 contains the principal thrust of the report in its discussion of possible rest area wastewater disposal methods with an evaluation and some relative cost data. With increasingly stringent requirements for wastewater disposal, it seems apparent that rest area wastewaters must continue to be disposed of on highway property. If not, the Department would find itself, in most instances, with the task of operating continuously and effectually some rather complicated treatment systems that require trained operators, operational reports and effluent analyses, and systems that are not usually amenable to the flow characteristics of rest area wastewaters. Since much national attention is being given to these problems, it is hoped that new or improved treatment schemes may be developed in the future that will be appropriate for rest areas. An intent of this study has thus been to suggest means of wastewater disposal, presently available that would offer an improvement to the septic tank drain field method of disposal.Conclusions and recommendations drawn from the study are as follows:1. There is no question but that septic tank- drain field disposal systems would, because of their simplicity, be the preferred method of disposal if their installation were applicable to most rest areas and if they would, from past experiences here and elsewhere give some assurance of a freedom from operating difficulties over a period of just a few years.
Authors:
Seabloom,Robert W.
Keywords:
additive, Alternative, cost, criteria, data, design, developed, disposal, evaluation, flow, highway, improvement, ITS, methods, Operating, rest area, rest areas, Study, System, systems, Washington, Washington state
|
Rossana,T. A. | WA-RD 004.1 | Evergreen Point Bridge Toll Booth Ventilation Study 1006 | 1972 |
Abstract:
At the request of the Washington Department of Highways a comprehensive study was conducted of the exposures of toll collectors to carbon monoxide at the Evergreen Point Bridge spanning Lake Washington between Seattle and Bellevue.The first phase of the study consisted of designing, installing and operating an automatic, continuous carbon monoxide monitoring system to establish typical air quality patterns in and around the toll booths.the second phase consisted of developing a prototype toll booth positive ventilation system. Air, which is introduced through a vertical diffuser situated at one wall of the booth, travels horizontally across the booth and out the door. Parametric studies of sources and rates of ventilation air, diffuser design and other toll booth modifications were conducted in the laboratory. Subsequently these modifications were installed and investigated at an operating booth at the toll plaza. Concentrations of carbon monoxide in the collectors breathing zone were reduced to acceptable levels. Methodologies and results of these systems are described, and design recommendations for the control system are offered.
Authors:
Rossana,T. A., Hall,F. A.
Keywords:
air quality, bridge, carbon monoxide, Concentrations, control, design, exposure, highway, Highways, methodology, monitoring, Operating, quality, seattle, System, systems, travel, Washington
At the request of the Washington Department of Highways a comprehensive study was conducted of the exposures of toll collectors to carbon monoxide at the Evergreen Point Bridge spanning Lake Washington between Seattle and Bellevue.The first phase of the study consisted of designing, installing and operating an automatic, continuous carbon monoxide monitoring system to establish typical air quality patterns in and around the toll booths.the second phase consisted of developing a prototype toll booth positive ventilation system. Air, which is introduced through a vertical diffuser situated at one wall of the booth, travels horizontally across the booth and out the door. Parametric studies of sources and rates of ventilation air, diffuser design and other toll booth modifications were conducted in the laboratory. Subsequently these modifications were installed and investigated at an operating booth at the toll plaza. Concentrations of carbon monoxide in the collectors breathing zone were reduced to acceptable levels. Methodologies and results of these systems are described, and design recommendations for the control system are offered.
Authors:
Rossana,T. A., Hall,F. A.
Keywords:
air quality, bridge, carbon monoxide, Concentrations, control, design, exposure, highway, Highways, methodology, monitoring, Operating, quality, seattle, System, systems, travel, Washington
|
Foss,Rene N. | WA-RD 005.2 | Tire Noise Properties And Two Resurfacing Materials Used By Highway Bridges For Repair Of Wear 1014 | 1972 |
Abstract:
The purpose of this study was to investigate the acoustic effects of two topping materials used on bridges in the Seattle area. One material was applied to the bridge on Interstate-5 which crosses the Duwamish River. It is an English product called Sprag-Grip which is supposed to have very good anti-skid properties, as well as the ability to stick to the road in thin layers thus making it suitable for the repair of worn surfaces. The other material is an epoxy -asphalt mixture which was applied to some sections of the Evergreen Point Floating Bridge over Lake Washington, particularly over sections where worn grating was causing excessive noise. Hopefully, this substance will be capable of long-term sticking in relatively thin layers. Of the two materials, it was found that the epoxy-asphalt topping on the Evergreen Point Floating Bridge was by far the quieter, and, at least as newly applied, proved to be very quiet at the road/tire interface. It is likely that this good acoustic performance is due to the smoothness of the surface rather than directly to the fact that the material contains epoxy. The role of the epoxy would be as an adhesive and to resist wear so that its original acoustic performance could be maintained for a considerable length of time. Spray-Grip, on the other hand, although slightly quieter than the rutted, worn roadway, was not as quiet as the original unworn road surface. Experimental Procedures The primary contribution of a road surface to the noise 'radiating from a vehicle is in the noise emitted at the road/tire interface; therefore, the major thrust of this effort was directed toward measuring this effect. There also were some measurements of community noise levels before and after the resurfacing of the bridges. The tire noise tests were taken on the right rear wheel of a Laboratory station wagon upon which a new tire was mounted (a Pennsylvania Patrol Special, size 8. 55-15). (The tread design and depth of this tire are shown on page 2. ) This tire was mounted on a wheel and used on the vehicle only daring tests. Between tests it was stored so that unnecessary wear would not change its acoustic character-teristics. The noise pickup device was a specially baffled microphone located about 7 inches from the road/tire interface by a bracket holding it on the outside of the tire. One of the major problems in making noise measurements of this type is to have a microphone that will pick up only tire noise and be baffled from wind noise. This problem has been solved by a microphone baffling system especially designed by this Laboratory.
Authors:
Foss,Rene N.
Keywords:
asphalt, bridge, bridges, community noise, design, Epoxy, experimental, floating bridge, highway, ITS, materials, mixture, noise, Noise Levels, noise measurements, performance, repair, roadway, seattle, Study, System, tests, tire, tire noise, Washington, wind, Wind Noise
The purpose of this study was to investigate the acoustic effects of two topping materials used on bridges in the Seattle area. One material was applied to the bridge on Interstate-5 which crosses the Duwamish River. It is an English product called Sprag-Grip which is supposed to have very good anti-skid properties, as well as the ability to stick to the road in thin layers thus making it suitable for the repair of worn surfaces. The other material is an epoxy -asphalt mixture which was applied to some sections of the Evergreen Point Floating Bridge over Lake Washington, particularly over sections where worn grating was causing excessive noise. Hopefully, this substance will be capable of long-term sticking in relatively thin layers. Of the two materials, it was found that the epoxy-asphalt topping on the Evergreen Point Floating Bridge was by far the quieter, and, at least as newly applied, proved to be very quiet at the road/tire interface. It is likely that this good acoustic performance is due to the smoothness of the surface rather than directly to the fact that the material contains epoxy. The role of the epoxy would be as an adhesive and to resist wear so that its original acoustic performance could be maintained for a considerable length of time. Spray-Grip, on the other hand, although slightly quieter than the rutted, worn roadway, was not as quiet as the original unworn road surface. Experimental Procedures The primary contribution of a road surface to the noise 'radiating from a vehicle is in the noise emitted at the road/tire interface; therefore, the major thrust of this effort was directed toward measuring this effect. There also were some measurements of community noise levels before and after the resurfacing of the bridges. The tire noise tests were taken on the right rear wheel of a Laboratory station wagon upon which a new tire was mounted (a Pennsylvania Patrol Special, size 8. 55-15). (The tread design and depth of this tire are shown on page 2. ) This tire was mounted on a wheel and used on the vehicle only daring tests. Between tests it was stored so that unnecessary wear would not change its acoustic character-teristics. The noise pickup device was a specially baffled microphone located about 7 inches from the road/tire interface by a bracket holding it on the outside of the tire. One of the major problems in making noise measurements of this type is to have a microphone that will pick up only tire noise and be baffled from wind noise. This problem has been solved by a microphone baffling system especially designed by this Laboratory.
Authors:
Foss,Rene N.
Keywords:
asphalt, bridge, bridges, community noise, design, Epoxy, experimental, floating bridge, highway, ITS, materials, mixture, noise, Noise Levels, noise measurements, performance, repair, roadway, seattle, Study, System, tests, tire, tire noise, Washington, wind, Wind Noise
|
Sylvester,R. O. | WA-RD 027.1 | A Study Of Wastewater Handling, Holding and Disposal From Washington State Ferries 953 |
Abstract:
Alternatives to control wastewater odors on board Washington State ferries and during discharge of the wastewater to sewerage systems were formulated, evaluated and tested.Holding tank aeration, using compressed air injection to a recycle line is an effective method. Sulfide is microbially oxidized, and anaerobic sulfate reducing bacteria are suppressed. Engineering and lab studies and a simulation model of the process were used to estimate suitable design parameters and costs. A prototype installation is recommended for optimization of operation. The addition of slug dosages of H202 was also found to be effective in laboratory and on-board vessels. The twice daily dose of about 50 mg/ should be stirred into the holding tank using recycle mixing. Peroxide was found to oxidize sulfide, increase dissolved oxygen and suppress sulfate reducing bacteria. Bottom suction sludge hoppers must be installed to prevent accumulation of sludge in tank bottom.Other alternatives, including chlorine addition, pH increase, iron sulfide precipitation and toxic odor control compounds, were found ineffective and/or uneconomic.Other finds are that sulfide is produced primarily from reduction of sulfates from the saltwater flushing water. Production is primarily in the slime layer on the bottom and sides of the holding tanks. On-shore force mains are sites of sulfide production during stagnant periods between tank pumpouts. These force mains should tanks was evaluated for hydraulic, organic loading, and salt toxicity effects on existing and planned sewage plants. No significant impacts were found.
Authors:
Sylvester,R. O., Ferguson,J. F., Parish,K. B., Brown,D. W., Leuelid,S.
Keywords:
control, cost, costs, design, disposal, dissolved oxygen, effects, ferries, ferry, impact, impacts, line, Marine wastewater holding tanks, odor control, wastewater aeration, hydrogen peroxide, model, Precipitation, salt, sewerage, Study, System, systems, Toxicity, vessel, vessels, Washington, Washington state
Alternatives to control wastewater odors on board Washington State ferries and during discharge of the wastewater to sewerage systems were formulated, evaluated and tested.Holding tank aeration, using compressed air injection to a recycle line is an effective method. Sulfide is microbially oxidized, and anaerobic sulfate reducing bacteria are suppressed. Engineering and lab studies and a simulation model of the process were used to estimate suitable design parameters and costs. A prototype installation is recommended for optimization of operation. The addition of slug dosages of H202 was also found to be effective in laboratory and on-board vessels. The twice daily dose of about 50 mg/ should be stirred into the holding tank using recycle mixing. Peroxide was found to oxidize sulfide, increase dissolved oxygen and suppress sulfate reducing bacteria. Bottom suction sludge hoppers must be installed to prevent accumulation of sludge in tank bottom.Other alternatives, including chlorine addition, pH increase, iron sulfide precipitation and toxic odor control compounds, were found ineffective and/or uneconomic.Other finds are that sulfide is produced primarily from reduction of sulfates from the saltwater flushing water. Production is primarily in the slime layer on the bottom and sides of the holding tanks. On-shore force mains are sites of sulfide production during stagnant periods between tank pumpouts. These force mains should tanks was evaluated for hydraulic, organic loading, and salt toxicity effects on existing and planned sewage plants. No significant impacts were found.
Authors:
Sylvester,R. O., Ferguson,J. F., Parish,K. B., Brown,D. W., Leuelid,S.
Keywords:
control, cost, costs, design, disposal, dissolved oxygen, effects, ferries, ferry, impact, impacts, line, Marine wastewater holding tanks, odor control, wastewater aeration, hydrogen peroxide, model, Precipitation, salt, sewerage, Study, System, systems, Toxicity, vessel, vessels, Washington, Washington state
|
Previous | Next |
Search
Common Keywords:
- accident rates
- research
- Washington
- Washington state
- data
- pavement
- highway
- transportation
- design
- bridge
- evaluation
- construction
- performance
- condition
- program
- traffic surveillance and control
- traffic
- concrete
- analysis
- development
- WSDOT
- asphalt
- project
- System
- control
- ITS
- cost
- Study
- systems
- truck
- bridge and construction
- developed
- volume
- overlay
- computer
- experimental
- HOV
- environmental
- planning
- survey
- asphalt concrete
- transportation planning
- earthquake
- pavement management
- impact
- materials
- Highways
- management
- speed
- bridges
- maintenance
- tire
- marine
- tests
- impacts
- methods
- quality
- bridge deck
- temperature
- noise
- seattle
- monitoring
- asphalt pavement
- costs
- land use
- highway runoff
- fatigue
- pavements
- incident management
- high occupancy vehicle
- roadway
- model
- transit
- snow
- public
- agencies
- overlays
- policy
- weight
- methodology
- reinforced concrete
- facilities
- effectiveness
- avalanche
- TRB
- base
- benefit
- ramp metering
- Interim
- loads
- prediction
- runoff
- cracking
- Miscellaneous Library
- statistics
- behavior
- models